1 Adopted method of design

o Simple o Semi-rigid o Rigid IS: 800; Cl. 3.4.4 IS: 800; Cl. 3.4.5 IS: 800; Cl. 3.4.6

2 Design based on o Elastic Analysis

o Plastic Analysis IS: 800; Section-9 SP: 6(6) 3 Floor Construction o Composite o Non-composite o Boarded 4 Roof Construction o Composite o Non-composite o Metal o Any other

5 Horizontal Force resisting system

adopted

o Frames

o Braced frames

o Frames & shear walls

Note: Seismic force As per IS: 1893 would depend on System

6 Slenderness ratios maintained Members defined in Table

3.1, IS:800 IS: 800; Cl. 3.7

7 Member deflection limited to

Beam, Rafters Crane Girders Purlins Top of Columns IS: 800; Cl. 3.13 8 Structural members o Encased in Concrete o Not encased IS: 800; Section 10 9 Proposed material o General Weld-able o High strength o Cold formed o Tubular IS: 2062 IS: 8500 IS: 801, 811 IS: 806

10 Minimum metal thickness specified for

corrosion protection

o Hot rolled sections

o Cold formed sections o Tubes IS: 800, CL.3.8 Cl. 3.8.1 to Cl. 3.8.4 Cl. 3.8.5 Cl. 3.8.5 11 Structural Connections o Rivets o C T Bolts o S H F G Bolts o Black Bolts

o Welding- Field Shop (Specify welding type proposed) o Composite IS: 800, Section-8 IS: 1929,2155,1149 IS: 6639, 1367 IS: 3757, 4000 IS: 1363, 1367 IS: 816, 814, 1395, 7280, 3613, 6419, 6560, 813, 9595

12 Minimum Fire Rating Proposed, with

method o Rating --- hours o Method proposed ƒ In tumescent Painting ƒ Spraying ƒ Quilting ƒ Fire retardant boarding IS: 1641, 1642, 1643

142 Form 13

Progress Certificate: Plinth Stage (Byelaw 4.30.1)

(Plinth Stage/In case of basement casting of basement slab)

Ref. no. Date:

Owner's Name: Location:

Plot/building bearing property No. ………….. ……….plot no, …………., city survey No………..,Ward No. ………..……… locality/street ………..

To

The Commissioner

Mangalore City Corporation Mangalore

Sir,

We hereby inform you that the work of execution of the building as per approved plan, working drawing and structural drawings has reached the Plinth Level and is executed under our supervision.

We declare that the amended plan is not necessary at this stage.

Yours faithfully,

Owner:

Signature of the Owner: ______________________________________________ Name of the Owner (In Block Letters): ___________________________________ Address of the Owner: _______________________________________________ ____________________________________________________________________ Pin code: ________________________

Tel. No: _________________________ Date: ____________________________

143 Developer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

Construction Engineer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

144 Form 14

Progress Certificate: First Storey (Byelaw 4.30.1)

Ref. no. Date:

Owner's Name: Location:

Plot/building bearing property No. ………….. ……….plot no, …………., city survey No………..,Ward No. ………..……… locality/street ………..

To

The Commissioner

Mangalore City Corporation Mangalore

Sir,

We hereby inform you that the work of execution of the building as per approved plan, working drawing and structural drawings has reached the First Storey Level and is executed under our supervision.

We declare that the amended plan is not necessary at this stage.

Yours faithfully, Owner:

Signature of the Owner: ______________________________________________ Name of the Owner (In Block Letters): ___________________________________ Address of the Owner: _______________________________________________ ____________________________________________________________________ Pin code: ________________________

Tel. No: _________________________ Date: ____________________________

145 Developer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

Construction Engineer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

146 Form 15

Progress Certificate: Middle Storey (in case of high-rise buildings) (Byelaw 4.30.1)

Ref. no. Date:

Owner's Name: Location:

Plot/building bearing property No. ………….. ……….plot no, …………., city survey No………..,Ward No. ………..……… locality/street ………..

To

The Commissioner

Mangalore City Corporation Mangalore

Sir,

We hereby inform you that the work of execution of the building as per approved plan, working drawing and structural drawings has reached the ___________________ Storey Level and is executed under our supervision.

We declare that the amended plan is not necessary at this stage.

Yours faithfully,

Owner:

Signature of the Owner: ______________________________________________ Name of the Owner (In Block Letters): ___________________________________ Address of the Owner: _______________________________________________ ____________________________________________________________________ Pin code: ________________________

Tel. No: _________________________ Date: ____________________________

147 Developer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

Construction Engineer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

148 Form 16

Progress Certificate; Last Storey (Byelaw 4.30.1)

Ref. no. Date:

Owner's Name: Location:

Plot/building bearing property No. ………….. ……….plot no, …………., city survey No………..,Ward No. ………..……… locality/street ………..

To

The Commissioner

Mangalore City Corporation Mangalore

Sir,

We hereby inform you that the work of execution of the building as per approved plan, working drawing and structural drawings has reached the ___________________ Storey Level (last storey level) and is executed under our supervision.

We declare that the amended plan is not necessary at this stage.

Yours faithfully,

Owner:

Signature of the Owner: ______________________________________________ Name of the Owner (In Block Letters): ___________________________________ Address of the Owner: _______________________________________________ ____________________________________________________________________ Pin code: ________________________

Tel. No: _________________________ Date: ____________________________

149 Developer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

Construction Engineer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

150 Form 17 Completion Report

(Byelaw 4.31.1)

Ref. no. Date:

Owner's Name: Location:

Plot/building bearing property No. ………….. ……….plot no, …………., city survey No………..,Ward No. ………..……… locality/street ………..

To

The Commissioner

Mangalore City Corporation Mangalore

Sir,

1. The work of erection/re-erection of building as per approved plan is completed under the Supervision of Architect/Construction Engineer who has given the completion certificate which is enclosed herewith.

2. We declare that the work is executed as per the approved plan/permission granted and to our satisfaction. We declare that the construction is to be used for ________________________________________________________________ ____ the purpose as per approved plan and it shall not be changed without obtaining written permission.

3. We hereby declare that the plan as per the building erected has been submitted and approved.

4. We have transferred the area of parking space provided as per approved plan to an individual/association before for occupancy certificate.

5. Any subsequent change from the completion drawings will be our responsibility. 6. We request that the occupancy certificate for the premises be issued.

151 Yours faithfully,

Owner:

Signature of the Owner: ______________________________________________ Name of the Owner (In Block Letters): ___________________________________ Address of the Owner: _______________________________________________ ____________________________________________________________________ Pin code: ________________________

Tel. No: _________________________ Date: ____________________________

Developer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________ Encl:

1) Building completion report by the architect on record

2) Building completion report by the construction engineer on record 3) Building completion report by the structural engineer on record

152 Form 18

Building Completion Report by the Architect/Engineer on Record (Byelaw 4.31.1)

Ref. no. Date:

Owner's Name: Location:

Plot/building bearing property No. ………….. ……….plot no, …………., city survey No………..,Ward No. ………..……… locality/street ………..

To

The Commissioner

Mangalore City Corporation Mangalore

Sir,

1. The building/s has/have been constructed according to the sanctioned plan. 2. The building/s has /have been constructed as per approved plan and design as

per detailed architectural drawings and specifications prepared by Architect on Record/Engineer on record.

3. Construction has been done under our supervision / guidance and adheres to the drawings submitted.

Yours faithfully,

Architect/Engineer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

153 Form 19

Building Completion Report by the Construction Engineer on Record (Byelaw 4.31.1)

Ref. no. Date:

Owner's Name: Location:

Plot/building bearing property No. ………….. ……….plot no, …………., city survey No………..,Ward No. ………..……… locality/street ………..

To

The Commissioner

Mangalore City Corporation Mangalore

Sir,

1. The building/s has/have been constructed according to the sanctioned plan. 2. The building/s has / have been constructed as per

- the detailed structural drawings and structural specifications prepared by the Structural Engineer on Record

- the detailed Architectural drawings and Architectural specifications prepared by the Architect on Record

- detailed drawings and specifications of all services

3. All materials used in the construction have been tested as provided in specifications and a record of test reports has been kept.

Yours faithfully,

Construction Engineer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________

154

Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________

155 Form 20

Building Completion Report by the Structural Engineer on Record (Byelaw 4.31.1)

Ref. no. Date:

Owner's Name: Location:

Plot/building bearing property No. ………….. ……….plot no, …………., city survey No………..,Ward No. ………..……… locality/street ………..

To

The Commissioner

Mangalore City Corporation Mangalore

Sir,

This is to certify that detailed structural drawings of the buildings/s has / have been prepared on the basis of a detailed analysis and a detailed design carried out according to relevant previsions of the latest Indian Standard Codes, National Building Code and as indicated in the structural design basis report.

Yours faithfully,

Structural Engineer on Record:

Name in Block Letters____________________________________________________ Signature with date______________________________________________________ Registration No._________________________________________________________ Validity date____________________________________________________________ Address_______________________________________________________________ ______________________________________________________________________ Pin code_______________ Tel_____________

156 Form 21

Occupancy Certificate (OC) (Byelaw 4.31.1)

A plan was sanctioned for construction of ………building consisting of ………At ……… ………Vide LP No………. / ………….. dt: ……….

On receipt of the intimation of the completion of the building from the Owner/Developer, the building was inspected by the ………..… and it was found that the applicant has built the building according to the sanctioned plan/effected certain changes from the sanctioned plan. These changes were

regularised by the Commissioner in his note dated ……….. as recommended by the ………. by levying a penalty of Rs………after ensuring that the deviations are within the permissible limit of 5% from the sanctioned plan.

The applicant has paid a sum of Rs………….. ………(Rupees ………) vide challan no. …………..… dated ………. towards the compounding fine. Hence, the deviations affected by the applicant are regularised.

Therefore, permission is granted to occupy the building for ……….purpose at ……….. vide LP ………. consisting of ……… ……… with the following details.

157 And subject to the following conditions:

1. S/He shall not add or alter materially, the structure or a part of the structure there off without specific permission of MCC. In the event of the applicant violating, the MCC has the right to demolish the deviated/altered/added portion without any prior notice.

2. S/He shall construct the toilet, facilities for the visitors, drivers and servants at Ground floor Level within the plinth area of the building within 3 months from the date of issue of O.C.

3. The basement floor must be used for car parking purpose only as per sanctioned plan.

4. Other conditions.

On default of the above conditions, the O.C. issued will be withdrawn.

Office Communication No………… Dated ……….

Signature of Authority……….

Name, designation and Address of the Authority ………

Office Stamp:

158 Form 22

SCHEDULE I/II OF THE NATIONAL BUILDING ORGANISATION

In document Mangalore City Building Byelaws 2007 (Page 145-162)