• No results found

Change Quotation

In document Sap Sd User Training Manual (Page 147-154)

Overview Trigger:

Customer requires change to existing quotation or there was an entry error made during creation.

Business Process Description Overview

This document describes the procedure required to make changes to an existing quotation document.

Customer may request another material be added or a delivery date change, etc.

Input - Required Fields Field Value / Comments Quotation Number Enter existing quotation number.

Output - Results Comments

Changed/updated

quotation document Refer to Business Process Procedure „Display Quotation‟, to verify this result.

End User Manual

Title: Create Contract

Module: SD

Release: ECC 6.0 Created by: Utpal Mishra Created on: 11/11/2010

Last changed on: Last changed by: Version: 0 Page:

12/9/2010 Utpal Mishra 148 of 252

Procedural Steps Access transaction by:

Via Menus Logistics Sales/Distribution Sales Quotation Change

Via Transaction Code VA22

On screen “Change Quotation: Initial screen”, enter the information in the fields as specified in the table below:

Field

Name Description R/O/

C User Action and Values Comments Quotatio

n

Number

Number of the quotation to be displayed.

R Enter quotation number, if known.

PO

Number, Sold-to and WBS

Additional fields used for selection if

quotation number is not readily known.

O Enter PO Number, Sold-to or WBS element.

End User Manual

Title: Create Contract

Module: SD

Release: ECC 6.0 Created by: Utpal Mishra Created on: 11/11/2010

Last changed on: Last changed by: Version: 0 Page:

12/9/2010 Utpal Mishra 149 of 252

element

Press Enter key Alternately, click on green

check mark ( NOTE: On above table, in column “R/O/C”; “R” = Required, “O” = Optional, “C” = Conditional )

On screen “Change Quotation Number: Overview”, enter the information in the fields as specified in the table below:

Adding One More Line Item –Site Supervision to existing Quotation

End User Manual

Title: Create Contract

Module: SD

Release: ECC 6.0 Created by: Utpal Mishra Created on: 11/11/2010

Last changed on: Last changed by: Version: 0 Page:

12/9/2010 Utpal Mishra 150 of 252

End User Manual

Title: Create Contract

Module: SD

Release: ECC 6.0 Created by: Utpal Mishra Created on: 11/11/2010

Last changed on: Last changed by: Version: 0 Page:

12/9/2010 Utpal Mishra 151 of 252

Field

Name Description R/O/

C User Action and Values Comments Quotatio

n Number of quotation

to be changed. R Quotation is brought over from initial selection screen.

Net

Value Net Value of quotation. Will appear in „gray‟ and remained unchanged.

O When user changes items within the

quotation the reflected change is made in net value.

Sold-to Customer number. R Quotation is made to a particular customer and will carry through from the initial screen.

Ship-to Where items in quote

will be shipped to. R Carried over from initial selection screen.

PO

Number Customer supplied

PO number. O Brought over from the quotation entered into the initial selection screen.

Valid

From Date on which quotation become effective.

O Brought over from the quotation entered into the initial selection screen.

Valid To Date on which quotation becomes null and void.

O Brought over from the quotation entered into the initial selection screen.

Material

(s) Material Number of the product the customer is requesting a quotation for.

R Brought over from the quotation entered into the initial selection screen.

Order

Quantity Amount of material the customer has Requested the quote for.

R Brought over from the quotation entered into the initial selection screen.

Req. Date customer O Brought over from the System

End User Manual

Title: Create Contract

Module: SD

Release: ECC 6.0 Created by: Utpal Mishra Created on: 11/11/2010

Last changed on: Last changed by: Version: 0 Page:

12/9/2010 Utpal Mishra 152 of 252

Delivery

Date requires delivery. quotation entered into the initial selection screen.

default - current date Sales

(Tab) General Sales information can be changed here.

O Click on this tab to change information such as delivery date, incoterms and

billing/delivery blocks may be changed here.

Item Overvie w (Tab)

Use this area to delete/add items to the quotation. Some individual item

changes can be made here, but the Details Tab is better for individual item changes.

O

Item Details (Tab)

Individual item changes are made here.

O

Ordering Party (Tab)

Ordering Party changes are made here.

O Click on this tab to change information such as customer internal material number.

Reason for Rejectio n (Tab)

If quotation is rejected, the

rejection and reason are entered here.

O Click on this tab to change reason for rejection information such as delivery date, incoterms and

billing/delivery blocks may be changed here.

This

„closes‟ the quotation and further documents are unable to be

End User Manual

Title: Create Contract

Module: SD

Release: ECC 6.0 Created by: Utpal Mishra Created on: 11/11/2010

Last changed on: Last changed by: Version: 0 Page:

12/9/2010 Utpal Mishra 153 of 252

If quotation number is unknown, use customer‟s PO number used to create the quote and/or the customer number.

If there are multiple quotes for the customer, a selection will be displayed for the user to choose from.

Use buttons: Availability, Pricing, Sched. Lines and Config to access detailed information on items within the quotation.

Save the changes. (Click on the yellow file folder icon, or Ctrl-S) Message will be displayed confirming that the changes have

been saved.

If data is missing, system will display dialog box indicating document is incomplete. This is a warning message. System will allow quotation to be saved as is or will walk user through data screens required to complete the quotation.

Exit Change Quotation processing. (Click on the yellow up-facing arrow icon)

End User Manual

Title: Create Contract

Module: SD

Release: ECC 6.0 Created by: Utpal Mishra Created on: 11/11/2010

Last changed on: Last changed by: Version: 0 Page:

12/9/2010 Utpal Mishra 154 of 252

In document Sap Sd User Training Manual (Page 147-154)

Related documents