• No results found

PROGRAMME 4: VETERINARY SERVICES

In document STRATEGIC PLAN 2015/ /20 (Page 32-0)

7. STRATEGIC OBJECTIVES

7.4 PROGRAMME 4: VETERINARY SERVICES

Programme Purpose

To provide veterinary services to clients in order to ensure healthy animals, safe animal products and welfare of people of South Africa.

7.4.1 Strategic Objective

Strategic Objective Safe and tradable animals and animal products produced

Objective Statement To ensure control of animal diseases for 4,5 million animals; inspection of 87 abattoirs through veterinary services to clients in order to ensure healthy animals, safe animal products and welfare of the people of South Africa by facilitating and providing animal health services in order to protect the animal and human population against identified zoonotic diseases of economic importance, and primary animal health and welfare programmes/ projects to allow for exports of animals and animal products by 2020

Baseline 2.5 million animals 84 Abattoirs inspected

7.4.2 Resource Considerations a. Financial resources

Budget allocation is required for key inputs. There is a need for adequate financial provision for the two main cost drivers of the programme i.e. vaccination and dipping.

The two are preventative programmes which if followed properly will keep disease occurrence to the minimum and assist in dealing with Foot and Mouth Disease (FMD).

b. Physical Resources

Working tools (subsidized vehicles for technicians, internet connectivity and ICT tools, e.g. cell phones, laptops and printers).

c. Human Resources

To retain the current scarce skills as well as recruitment in the field of veterinary services the Department will need to have effective human resources strategies.

d. Systems and Infrastructure requirements

More animal handling facilities are required in order to render effective veterinary service

33

7.4.3 Risk Considerations

Strategic Objective Risk Mitigating Intervention Safe and tradable

animals and animal products produced

Outbreak of diseases

Skills shortage

• Continuous disease surveillance

• Head-hunting, retention strategy, Occupation Specific Dispensation (OSD), Bursary scheme and financial assistance for studies with service obligation contracts

7.5 PROGRAMME 5: RESEARCH AND TECHNOLOGY DEVELOMENT SERVICES Programme Purpose

To provide expert and needs based research, development and technology transfer services impacting on development objectives.

7.5.1 Strategic Objective

Strategic

Objective Optimised provisioning of expert and needs based research

Objective

Statement To ensure that 122 medium to long term research and technology development projects are conducted, facilitated and coordinated to contribute to improved agricultural production by 2020

Baseline 55 research projects

34

7.5.2 Resource Considerations a. Financial resources

Budget for compensation of employees, operations and capital.

b. Physical Resources

The two research stations have been identified as the centres for Indigenous Livestock Genetic Conservation (ILGC) and production of planted pastures. Most of the infrastructure such as fences, cattle handling facilities, water reticulation system and electricity remain a challenge. The housing for farm workers are at a point of inhabitation according to health and safety standards.

c. Human Resources

The directorate is reasonably staffed with scientists and technicians. There is however a need to address the staff shortage on the farms, especially on farm workers in response to retirements and deaths.

d. Systems and Infrastructure requirements

IT connectivity at the stations remains a challenge Need to upgrade the following infrastructure:

o Irrigation o Storage sheds o Fencing

o Laboratory

o Office and accommodation o Ablution facilities

o Abattoir facility 7.5.3 Risk Considerations

Strategic Objective Risk Mitigating Intervention Optimised expert

Construction of security fence Provision of security

Amicable settlement of Land claims

Drilling of additional boreholes Water encatchments

Collaborate research work with other research institutions

35

7.5.2 Resource Considerations a. Financial resources

Budget for compensation of employees, operations and capital.

b. Physical Resources

The two research stations have been identified as the centres for Indigenous Livestock Genetic Conservation (ILGC) and production of planted pastures. Most of the infrastructure such as fences, cattle handling facilities, water reticulation system and electricity remain a challenge. The housing for farm workers are at a point of inhabitation according to health and safety standards.

c. Human Resources

The directorate is reasonably staffed with scientists and technicians. There is however a need to address the staff shortage on the farms, especially on farm workers in response to retirements and deaths.

d. Systems and Infrastructure requirements

IT connectivity at the stations remains a challenge Need to upgrade the following infrastructure:

o Irrigation o Storage sheds o Fencing

o Laboratory

o Office and accommodation o Ablution facilities

o Abattoir facility 7.5.3 Risk Considerations

Strategic Objective Risk Mitigating Intervention Optimised expert

Construction of security fence Provision of security

Amicable settlement of Land claims

Drilling of additional boreholes Water encatchments

Collaborate research work with other research institutions

7.6 PROGRAMME 6: AGRICULTURAL ECONOMICS SERVICES Programme Purpose

To provide timely and relevant agricultural economic services to the sector in support of sustainable agricultural and agri-business development to increase economic growth.

7.6.1 Strategic Objective

Strategic Objective Improved competitiveness and sustainability of agribusinesses

Objective Statement To provide agribusiness development support services to 29 000 agribusinesses (farmers/cooperatives) by 2020 through entrepreneurial development, marketing services, value adding, production and resource economics

Baseline 29 598 agribusinesses were supported

7.6.2 Resource Considerations a. Financial resources

The Programme is adequately resourced.

b. Human resources

The Programme is adequately resourced.

c. Systems and infrastructure requirement.

To put up systems in order to provide timely and reliable information to both internal and external clients.

7.6.3 Risk Considerations

Strategic

Objective Risk Mitigating Intervention Improved

competitiveness and sustainability of agribusinesses

Reduced margins of farmers due to rising input costs

Limited participation of emerging farmers in farming business due to lack of access to agricultural finance

Establishment of cooperatives to encourage cooperative actions such as bulk

procurement to reduce costs Facilitate access to

government mandated development finance programs such as MAFISA and Land Bank Retail Emerging Markets

36

7.7 PROGRAMME 7: STRUCTURED AGRICULTURAL EDUCATION AND TRAINING Programme Purpose

To facilitate and provide structured agricultural education and training in line with the Agriculture Education and Training Strategy to all participants in the agricultural sector in order to establish a knowledgeable, prosperous and competitive sector.

7.7.1 Strategic Objective

Strategic Objective Enhanced facilitation and provision of structured agricultural education and training

Objective

Statement To provide non-formal and formal training to 6 400 learners on NQF levels 1-4 through FET structured education and training programmes by 2020

Baseline 5 562 learners, students and farmers

7.7.2 Resource Considerations a. Financial resources

Training affordability by Diploma students. Increased financial resources to have bursaries available for qualifying students. The Department has a multiyear plan for infrastructure upgrade, which will need continued funding.

b. Physical resources

Inadequate training infrastructure. There is still a need for internet connectivity, class rooms, accommodation, access roads and infrastructure practical lessons.

c. Human resources

The Department has aging staff and most of the support staff is retiring. Staff turnover is also a challenge due attraction by other industries and other competing colleges in neighbouring provinces.

Organisational Structure of the colleges to be aligned in accordance with the education national norms and standards.

37

7.7.3 Risk Considerations

Strategic

Objective Risk Mitigating Intervention Enhanced

Improved condition of service improved training infrastructure Maintenance of boundary fence

maintenance of fire belts

7.8 PROGRAMME 8: RURAL DEVELOPMENT Programme Purpose

The purpose of the programme is to facilitate and coordinate the planning and implementation of integrated rural development program in line with LEGDP, CRDP, IDP and Limpopo Rural Development Strategy. The program will work with all key stakeholders in order to ensure that government and its social partners delivers a sustainable and efficient rural development services to all rural communities.

7.8.1 Strategic Objective Strategic

Objective Improved coordination of rural development programme for the integration of the rural areas

Objective

Statement Coordination of 109 CRDP sites through successful infrastructure development, job creation and poverty alleviation to ensure access to basic infrastructure and rural livelihood creation by 2020

Baseline 54 CRDP sites

7.8.2 Resource Considerations

a. Financial resources

Budget for coordination activities.

b. Physical Resources

Working tools (transport for field staff, internet connectivity and ICT tools).

38

c. Human Resources

Human resource required to establish a resourced Rural Development Secretariat in line with the LIRDS for effective coordination of strategy implementation.

7.8.3 Risk Considerations

Strategic Objective Risk Mitigating Intervention Improved

• Rural development statutory framework provided for in the Intergovernmental

39

PART C: LINKS TO OTHER PLANS

40

8. LINKS TO THE LONG-TERM INFRASTRURE AND OTHER CAPITAL PLANS

The factors influencing the LDA’s inability to deliver on the infrastructure plan can be reflected as follows:

Changing of readiness of projects due to erratic weather conditions (e.g. Rainfall and water availability); and

Changing of readiness of projects due to social conditions (e.g. Conflicts among targeted beneficiaries, vandalism of infrastructure).

In response to the provincial government priority on agro-processing and value adding, the LDA has identified the following infrastructure development projects over the MTSF period, to support agricultural development throughout the value chain:

PROJECT TARGET FOR 2015/16 – 2019/20 LOCATION OF

PROJECT Masalal packhouse Refurbishment of Masalal citrus and

mango pack house facility Mopani District (Letsitele) Nwanedi

Cooperative Establishment of a vegetable pack

house facility Vhembe District

(Musina) Bee Honey

processing infrastructure

Development of a processing facility

for honey bee producers in Limpopo Vhembe and Mopani Districts Lebowakgomo

Abattoir Renovation of poultry houses around Sekhukhune and Capricorn to feed into the Abattoir

Sekhukhune and Capricorn Districts Valley Farms Upgrading of Valley farms, an

existing fruit juice and drying facility that belonging to the Levhubu land claimant communities

Vhembe District (Levhubu)

Tshakhuma Achar

Factory Establishment of Atchar facility for

mangos and vegetable farmers Vhembe (Tshakhuma Village

Moletji Dairy 1 processing facility and 13 villages Moletji Moshate and 13 villages Soil Conservation

works 8313 Hectares Ga Kgatla

Blouberg Leolo Greater Tubatse

Fencing Provision of fencing All municipalities Feedlot and animal

feed mills facilities Support the establishment of feedlot and feed mills around Waterberg District

Waterberg District

Irrigation Schemes 6 Irrigation Schemes Sekhukhune District Capricorn District Vhembe District

41 9. CONDITIONAL GRANTS

The status with regard to the below mentioned conditional grants remains the same, there are no changes and all grants are on continuing over the period of this Strategic Plan.

Name of grant Landcare

Purpose To ensure sustainable use and management of natural resources to ensure greater productivity, food security and job creation

Performance

indicator Participation, empowerment and conservation of resources in the number of area wide planned projects

Continuation The grant will continue as gazetted in the Division of Revenue Act (DORA) through a call for business plans

Motivation Challenges of degradation in the communal and land reform projects are huge and will require continued efforts. Mitigation and adaptation of impacts of climate change is appropriate under this program. MTSF priority of sustainable resource management and rural development are realized through this program

Name of Grant Expanded Public Works Programme (EPWP)

Purpose To incentivise provincial Departments to increase job creation efforts in environment and culture programmes through the use of labour intensive methods and the expansion of job creation in line with the EPWP guidelines Performance

Indicator Number of job opportunities created through labour intensive construction methods

Continuation The eligibility for continuous funding is performance base for every/ for each public body

Motivation The incentive is paid to encourage work creation. The incentive is paid per quarter of employment for the EPWP group and can be measured in a person’s day of work or full time equivalent. The intention of the incentive is to increase work efforts by public bodies by providing a financial performance reward

Name of Grant Ilima-Letsema

Purpose To support food production and ensure that resource poor farmers are assisted to participate competitively in agricultural production

Performance

indicator Number of projects provided with production inputs and access to technical advisory support

Continuation The grant funding will continue through the Strategic Plan period

Motivation The grant provides for farmers who lack access to credit to be assisted to access agricultural production inputs. The inputs are necessary to increase agricultural production and hence to improve household and national food security. Jobs are sustained and new ones created when farm enterprises are made operational, and this requires provision of the production inputs

42

Name of Grant Extension Recovery Program (sub-program currently included in the CASP budget)

Purpose To support provincial efforts to improve the delivery capacity of Extension Officers in order to facilitate comprehensive technical and advisory support to agricultural projects – with a specific focus on the previously disadvantaged farmers and land reform projects

Performance

Indicator Number of Extension Officers recruited and adequately trained as well as having all necessary physical and intellectual tools to support farmers in an effort to increase food production

Continuation The grant funding will continue through the Strategic Plan period

Motivation There is still an acute shortage of Extension Officers with the necessary skills and resources to support the previously disadvantaged farmers and enable them to cope in a technologically advanced and globalised sector

10. PUBLIC ENTITIES

The Department does not currently have a Public Entity.

The November 2013 Executive Council Decision 69 of 2013/14 rescinded EXCO Decision 156 of 2010, which approved the incorporation of the Limpopo Agricultural Development Corporation (LADC) into Limpopo Economic Development Agency (LEDA) and that LADC be registered as a separate entity with its assets, liabilities and employees that were transferred to LEDA restored. EXCO further approved that LADC commence its operations with effect from the 1st April 2014 as an entity of LDA.

Based, on the advice by the National Treasury and subsequent analysis by LDA in relation to the implementation of the EXCO resolution, the Executive Council of 21 January 2015 approved withdrawal of EXCO Decision No. 69 of 2013/14 on the establishment of a public entity to manage Agribusiness functions in the Province and that the Agribusiness functions should be retained within the LEDA and that LEDA should continue to support the LDA on Agribusiness-related matters.

11. PUBLIC PRIVATE PARTNERSHIPS None

43

44

In document STRATEGIC PLAN 2015/ /20 (Page 32-0)

Related documents