Work In Progress (WIP) Forms

CSMS

New Contracts

Data Bank

Pre-Qualification

Selection Risk Assessmen

t

Qualification Phase: Select A Qualified Contractor

Contract Award

Pre-Job Activity Work In Progress Final Evaluation Contract Implementation Phase: Ensure Field Safe Work

Work In Progress

(CSMS) Guidelines

Page 88

CUSTODIAN: SAFETY TEAM LEADER

COMPANY ACCEPTANCE WORK IN PROGRESS

Date :

Project Period :

Job Title :

Contract No :

Work Location :

Contractor Name :

Address :

Contractor Reps: _________________ PHE ONWJ Reps: _________________

(Name/Date) (Name/Date)

Page 89

CUSTODIAN: SAFETY TEAM LEADER PAPER COPIES ARE UNCONTROLLED

THE CONTROLLED VERSION OF THIS DOCUMENT IS ON THE ELECTRONIC FILE AT HSE DEPARTMENT

Appendix V.1. Form CSMS/WIP/01:

OFFICE AND FIELD WORK IN PROGRESS EVALUATION CRITERIA

A B C D

SECTION 1- PEOPLE

1 How does the standard of competence and completeness certification/documents required from the supervisor/leader on location.

Incompetent and

incomplete documents competent to do the job and document

completeness < 50%

competent to do the job and document

completeness > 50%

All competent and complete documents

2 How does the standards of competence and completeness certification/documents required from the crew/technician on location.

Incompetent and

incomplete documents competent to do the job and document

completeness < 50%

competent to do the job and document

completeness > 50%

All competent and complete documents

3 Has the Contractor‟s provide the work plan agreeable with scope of work Not Provided work

plan and scope of work

Work plan and scope of work available but not aligned.

Work plan provided but not agreed with scope of work.

Provided work plan agreeable with scope of work.

4 Has the HSSE KPI been update and agreed by Owner Company and Contractor‟s They haven‟t HSSE KPI HSSE KPI not updated

and not agreed by contractor

HSSE KPI agreed by owner company and Contractor‟s but not updated.

Has been update and agreed by Owner Company and Contractor‟s 5 How does the skills of supervisor /leader in performing work on location.

Unskilled Less than 50% skilled to

do their work An average skilled to

perform the work. It‟s all very skilled at doing the work.

6 How does the skills of crew /technician in performing work on location.

Unskilled Less than 50% skilled to

do their work An average skilled to

perform the work. It‟s all very skilled at doing the work.

7 How does the HSSE behavior of all Contractors‟ personnel.

Always repeat the

mistakes Often must be reminded and sometimes repeat a mistake.

Sometimes need to be reminded and not repeat the mistake.

Always show the habit of safe behavior.

(CSMS) Guidelines

Page 90

CUSTODIAN: SAFETY TEAM LEADER

8 Have minimum requirement work force fitness for work at site full filled Not document

supported (medical checkup and Mandatory HSSE Training)

Support document only

Sea survival training. Full filled but not

documented. Full filled with document by appropriate medical checkup record and mandatory applicable HSE training (Sea Survival, etc) 9 How does the participation of all personnel in implementing STOP (Safety Observation Program).

Not active Occasional, less than

target in KPI Active, meet as KPI Very active more than KPI per person.

10 How does the participation of all personnel in implementing Safety meeting (tool box talk).

Not active Occasional Active, every morning in

general but not prior job execution.

Very active, tool box talk performed prior job execution

11 How does responsive the Project Management Team (PMT)/Contractor Project Manager.

Difficult to contact/to

communicate Occasional cannot be contacted/communicate d.

Communication with the field / IOM is fluently and easily accessible, but still often not responsive to follow up action.

Very responsive to follow-up action and coordinate at site.

12 Is number and competency of Crew complying with the work required on site?

Number and competency of crew not sufficient.

Number of crew sufficient but not competent.

Competence of Crew comply with work but the number of crew not enough.

Number and competence of crew always comply and consistent with work required.

13 Have all HSSE issues been communicated to the contractor‟s upper management

Never HSSE issues

communicated only management at site verbally.

HSSE issues

communicated only middle management at site and written to upper management without coordinates all HSSE issues, such as: approve risk assessment and mitigation, HSSE plan, follow up

recommendation.

Page 91

SECTION 2- PLANT

14 How is the completeness PPE for personnel Most of the personnel

have not received a complete PPE.

Some personnel have not received a complete PPE (less than 10%).

All personnel receive a complete PPE follow a standard but there is no guarantee of availability of back up, or be Replaced.

Each personnel already get a complete PPE follow a standard including stock availability guarantee the back up and can be replaced.

15 How is the availability of standard equipment / regular tool Never used a standard

equipment Occasional borrow a

standard equipment Complete accordance with the required service, no mitigation the backup / backup equipment

Always a complete accordance with the required services, including mitigation the backup equipment 16 How to order equipment from site if any defective equipment for replacement

unsatisfied Often not satisfied Occasional there is a

discrepancy of required. Always arrived on time as required at site.

17 How does maintenance of equipment implementation.

Visually not feasible, not perform

maintenance and data is not available

Visually good, there was no maintenance and inspection, including no pre-use check list.

Visually good, performed maintenance and

inspection, but the documents are incomplete.

Visually good, performed routine maintenance and inspection, completed document use pre-use check list

18 Accommodation, Kitchen, Sanitary System, and Food Material storage appropriate Uncontrolled all

accommodation, kitchen and food material store.

All accommodation, kitchen and food material storage not clean, sanitary system uncontrolled.

All accommodation, kitchen and food material storage keep clean, sanitary system uncontrolled.

All accommodation, kitchen and food material storage keep clean and tidy, sanitary system keep appropriate control.

19 Has the Contractor‟s Housekeeping Program The contractor‟s

haven‟t housekeeping program.

The contractors have housekeeping program but not implemented.

The contractors have housekeeping program verbally without procedure or guideline

The contractors have housekeeping program such as: procedure familiarization, implementation and assessment.

(CSMS) Guidelines

Page 92

CUSTODIAN: SAFETY TEAM LEADER PAPER COPIES ARE UNCONTROLLED

THE CONTROLLED VERSION OF THIS DOCUMENT IS ON THE ELECTRONIC FILE AT HSE DEPARTMENT

SECTION 3 - PROCESS

20 How does the implementation of Standard Operating Procedure (SOP).

There is no procedure on site and not implemented

There is procedure on

site but not implemented. There is procedure on site but implementation not consistently

There is Procedure on site, approve by management

familiarization to work force and implement by all crew.

21 How is the Training Safe System Of Work (SOW) performed All leader/supervisor

not train SSOW (PA) Some of

leader/supervisor trained SSOW (PA)

All leader/supervisor already training SSOW (PA) but the certification is invalid and covered with a dispensation.

All leader/supervisor already trained SSOW (PA) with valid certificate.

22 Is there any a HSE training plan implemented for contractor‟s employees, include provide training for its managers and supervisor to ensure that they are capable?

Training matrix not available and not documented

Training matrix available by contractor‟s, but not implemented and documented

Training matrix available by contractor‟s, but not implemented and documented to management.

Training matrix available by contractor‟s,

implemented and documented to all level 23 How does the implementation of Control Of Work (COW) procedure.

No procedure

available Procedure approve but not implemented

Procedure implemented including competency personal, but audit and

analyst not performed.

Procedure implemented including competency

personal, audit and analyst.

24 How does the Risk Assessment process and its implementation.

No method of risk assessment.

Risk assessment method available but not implemented.

Risk assessment

occasional implemented including competency of personal, and no assesment.

Risk assessment implemented including competency of personal, and assessment.

25 How does the Permit To Work process and its implementation

No procedure or

method available Procedure approve but not implemented

Procedure implemented including competency personal, but audit and analyst not performed.

Procedure implemented including competency personal, audit and analyst.

Page 93

26 How does the HSE induction for new employees

No plan to induction

program Perform with verbally

Perform with appropriate material to all new employee but not inform all hazard and activities

Perform with appropriate material to all new employee coverage all hazard and activities 27 Does the contractor conduct HSE inspections and audits together on periodic basis

No program

inspections and audit. The program performs by Company and Contractor‟s occasionally.

The program perform by Company and

Contractor‟s on periodic basis, recommendations not follow up by

contractor‟s

The program perform by Company and

Contractor‟s on periodic basis, recommendations follow up by Contractor‟s and documented

28 Does the contractor‟s implement rewards and consequences programs for an effort to reduce occupational injuries, illnesses and environmental damage

No program reward

and consequences. Contractors have program reward and consequences, but not implemented.

Contractor‟s implement consequences

(Punishment) programs without reward to reduce injuries, illnesses and environmental damage.

Contractor‟s implement rewards and

consequences programs for an effort to reduce occupational injuries, illnesses and

environmental damage 29 Have safe execution procedures for critical activities relevant scope of works been written, reviewed,

approved and familiarized to contractors‟ workforce.

Safe execution procedure not provided by contractor‟s

Contractors provide safe execution procedures for critical activities relevant scope of works been written, but not reviewed and approved by management.

Contractors provide safe execution procedures for critical activities relevant scope of works been written, reviewed, approved, but not

familiarized to Contractors workforce.

Contractors provide safe execution procedures for critical activities relevant scope of works been written, reviewed, approved and familiarized to

Contractors workforce.

30 Has the HSE plan been implemented in the execution phase (or project schedule) Contractors haven‟t

HSE plan. contractors have HSE plan during PJA only not in execution phase

Contractors have HSE plan in the execution phase.

Contractor‟s implemented HSE plan in the execution phase.

(CSMS) Guidelines

Page 94

CUSTODIAN: SAFETY TEAM LEADER

31 Is the contractor has Emergency Respond Plan.

Contractor‟s not provided Emergency Respond Plan Procedure.

Contractor has

Emergency Respond Plan not approved procedure.

Contractor has Emergency Respond Plan Approved Procedure, review and familiarization to ERT, but never exercise/tested

Contractor has

Emergency Respond Plan Approved Procedure, review and familiarization to ERT including

exercise/tested 32 Are Contractor‟s Emergency telephone numbers posted throughout the site and tested.

No Contractor Emergency telephone numbers.

Contractor Emergency telephone numbers not posted.

Contractor Emergency telephone numbers posted throughout the site, but not tested

Contractor Emergency telephone numbers posted throughout the site and tested

Appendix V.2. Form CSMS/WIP/02:

OFFICE AND FIELD WORK IN PROGRESS SCORING SHEET

Contractor : ______________________________________________

Address : ______________________________________________

Date : ______________________________________________

Circle the number, which best represents this evaluation based on the criteria for rating purposes attached.

A B C D Subtotal Factor Total

SECTION 1PEOPLE

SECTION 1 ITEM 1 0 4 8 12

SECTION 1 ITEM 2 0 4 8 12

SECTION 1 ITEM 3 0 4 8 12

SECTION 1 ITEM 4 0 4 8 12

SECTION 1 ITEM 5 0 4 8 12

SECTION 1 ITEM 6 0 4 8 12

SECTION 1 ITEM 7 0 4 8 12

SECTION 1 ITEM 8 0 4 8 12

SECTION 1 ITEM 9 0 4 8 12

SECTION 1 ITEM 10 0 4 8 12

SECTION 1 ITEM 11 0 4 8 12

SECTION 1 ITEM 12 0 4 8 12

SECTION 1 ITEM 13 0 4 8 12

Subtotal X1/13

SECTION 2PLANT

SECTION 2 ITEM 14 0 4 8 12

SECTION 2 ITEM 15 0 4 8 12

SECTION 2 ITEM 16 0 4 8 12

SECTION 2 ITEM 17 0 4 8 12

SECTION 2 ITEM 18 0 4 8 12

SECTION 2 ITEM 19 0 4 8 12

S X1/6

(CSMS) Guidelines

SECTION 3PROCESS

SECTION 3ITEM 20 0 4 8 12

SECTION 3 ITEM 21 0 4 8 12

SECTION 3 ITEM 22 0 4 8 12

SECTION 3 ITEM 23 0 4 8 12

SECTION 3 ITEM 24 0 4 8 12

SECTION 3 ITEM 25 0 4 8 12

SECTION 3 ITEM 26 0 4 8 12

SECTION 3 ITEM 27 0 4 8 12

SECTION 3 ITEM 28 0 4 8 12

SECTION 3 ITEM 29 0 4 8 12

SECTION 3 ITEM 30 0 4 8 12

SECTION 3 ITEM 31 0 4 8 12

SECTION 3 ITEM 32 0 4 8 12

Subtotal X1/13

TOTAL RATING (SECT 1SECT 3)

SUMMARY

The numerical values below are the weighted ratings calculated above including contribute from field values.

The total represents the overall score for the Contractor. This score only for performance control of Contractor field and office implementation.

TOTAL RATING _____________*)

EVALUATED BY:

NAME NAME

TITLE TITLE

DATE DATE

Appendix V.3. Form CSMS/WIP/03:

FIELD WORK IN PROGRESS EVALUATION CRITERIA

A B C D

SECTION 1 PEOPLE

1 How does the standard of competence and completeness certification/documents required from the supervisor/leader on location.

Incompetent and

incomplete documents competent to do the job and document

completeness < 50%

competent to do the job and document

completeness > 50%

All competent and complete documents

2 How does the standards of competence and completeness certification/documents required from the crew/technician on location.

Incompetent and

incomplete documents competent to do the job and document

completeness < 50%

competent to do the job and document

completeness > 50%

All competent and complete documents

3 Has the Contractor‟s provide the work plan agreeable with scope of work Not Provided work

plan and scope of work

Work plan and scope of work available but not aligned.

Work plan provided but not agreed with scope of work.

Provided work plan agreeable with scope of work.

4 How does the skills of supervisor /leader in performing work on location.

Unskilled Less than 50% skilled to do their work

An average skilled to

perform the work. It‟s all very skilled at doing the work.

5 How does the skills of crew /technician in performing work on location.

Unskilled Less than 50% skilled to do their work

An average skilled to

perform the work. It‟s all very skilled at doing the work.

6 How does the HSSE behavior of all Contractors‟ personnel.

Always repeat the

mistakes Often must be reminded and sometimes repeat a mistake.

Sometimes need to be reminded and not repeat the mistake.

Always show the habit of safe behavior.

7 How does the participation of all personnel in implementing STOP (Safety Observation Program).

Not active Occasional, less than

target in KPI Active, meet as KPI Very active more than KPI per person.

8 How does the participation of all personnel in implementing Safety meeting (tool box talk).

(CSMS) Guidelines

Not active Occasional Active, every morning in general but not prior job execution.

Very active, tool box talk performed prior job execution

9 Is number and competency of Crew complying with the work required on site Number and

competency of crew not sufficient.

Number of crew sufficient but not competent.

Competence of Crew comply with work but the number of crew not enough.

Number and competence of crew always comply and consistent with work required.

SECTION 2 - PLANT

10 How is the completeness PPE for personnel Most of the personnel

have not received a complete PPE.

Some personnel have not received a complete PPE (less than 10%).

All personnel receive a complete PPE follow a standard but there is no guarantee of availability of back up, or be Replaced.

Each personnel already get a complete PPE follow a standard including stock availability guarantee the back up and can be replaced.

11 How is the availability of standard equipment / regular tool Never used standard

equipment. Occasional borrow

standard equipment. Complete accordance with the required service, no mitigation the back up / backup equipment.

Always a complete accordance with the required services, including mitigation the backup equipment.

12 How does maintenance of equipment implementation.

Visually not feasible, not perform

maintenance and data is not available

Visually good, there was no maintenance and inspection, including no pre-use check list.

Visually good, performed maintenance and

inspection, but the documents are incomplete.

Visually good, performed routine maintenance and inspection, completed document use pre-use check list

13 Accommodation, Kitchen, Sanitary System, and Food Material storage appropriate Uncontrolled all

accommodation, kitchen and food material store.

All accommodation, kitchen and food material storage not clean, sanitary system uncontrolled.

All accommodation, kitchen and food material storage keep clean, sanitary system uncontrolled.

All accommodation, kitchen and food material storage keep clean and tidy, sanitary system keep appropriate control.

14 Has the Contractor‟s House keeping Program

The contractor‟s haven‟t house keeping program.

The contractor‟s have house keeping program but not implemented.

The contractor‟s have house keeping program verbally without procedure or guideline

The contractor‟s have house keeping program such as: procedure familiarization, implementation and assessment.

SECTION 3 - PROCESS

15 How does the implementation of Standard Operating Procedure (SOP).

There is no procedure on site and not implemented

There is procedure on

site but not implemented. There is procedure on site but implementation not consistently

There is Procedure on site, approve by management

familiarization to work force and implement by all crew.

16 How is the Training Safe System Of Work (SOW) performed All leader/supervisor

not train SSOW (PA) Some of

leader/supervisor trained SSOW (PA)

All leader/supervisor already training SSOW (PA) but the certification is invalid and covered with a dispensation.

All leader/supervisor already trained SSOW (PA) with valid certificate.

17 How does the implementation of Control Of Work (COW) procedure.

No procedure

available Procedure approve but not implemented

Procedure implemented including competency personal, but audit and

analyst not performed.

Procedure implemented including competency

personal, audit and analyst.

18 How does the Risk Assessment process and its implementation.

No method of risk assessment.

Risk assessment method available but not implemented.

Risk assessment

occasional implemented including competency of personal, and no assesment.

Risk assessment implemented including competency of personal, and assessment.

19 How does the Permit To Work process and its implementation No procedure or

method available Procedure approve but not implemented

Procedure implemented including competency personal, but audit and analyst not performed.

Procedure implemented including competency personal, audit and analyst.

20 Does the contractor conduct HSE inspections and audits together on periodic basis

(CSMS) Guidelines

No program

inspections and audit. The program performs by Company and Contractor‟s occasionally.

The program perform by Company and

Contractor‟s on periodic basis, recommendations not follow up by

contractor‟s

The program perform by Company and

Contractor‟s on periodic basis, recommendations follow up by Contractor‟s and documented

21 Has the HSE plan been implemented in the execution phase (or project schedule) Contractors haven‟t

HSE plan. contractor‟s have HSE plan during PJA only not in execution phase

Contractor‟s have HSE plan in the execution phase.

Contractor‟s implemented HSE plan in the execution phase.

22 Is the contractor has Emergency Respond Plan.

Contractor‟s not provided Emergency Respond Plan Procedure.

Contractor has

Emergency Respond Plan not approved procedure.

Contractor has Emergency Respond Plan Approved Procedure, review and familiarization to ERT, but never exercise/tested

Contractor has

Emergency Respond Plan Approved Procedure, review and familiarization to ERT including

exercise/tested.

23 Are Contractor‟s Emergency telephone numbers posted throughout the site and tested.

No Contractor Emergency telephone numbers.

Contractor Emergency telephone numbers not posted.

Contractor Emergency telephone numbers posted throughout the site, but not tested

Contractor Emergency telephone numbers posted throughout the site and tested

Appendix V.4. Form CSMS/WIP/04:

FIELD WORK IN PROGRESS SCORING SHEET

Contractor : ______________________________________________

Address : ______________________________________________

Date : ______________________________________________

Circle the number, which best represents this evaluation based on the criteria for rating purposes attached.

A B C D Subtotal Factor Total

SECTION 1PEOPLE

SECTION 1 ITEM 1 0 4 8 12

SECTION 1 ITEM 2 0 4 8 12

SECTION 1 ITEM 3 0 4 8 12

SECTION 1 ITEM 4 0 4 8 12

SECTION 1 ITEM 5 0 4 8 12

SECTION 1 ITEM 6 0 4 8 12

SECTION 1 ITEM 7 0 4 8 12

SECTION 1 ITEM 8 0 4 8 12

SECTION 1 ITEM 9 0 4 8 12

Subtotal X1/9

SECTION 2PLANT

SECTION 2 ITEM 10 0 4 8 12

SECTION 2 ITEM 11 0 4 8 12

SECTION 2 ITEM 12 0 4 8 12

SECTION 2 ITEM 13 0 4 8 12

SECTION 2 ITEM 14 0 4 8 12

SUBTOTAL X1/5

SECTION 3PROCESS

SECTION 3ITEM 15 0 4 8 12

SECTION 3 ITEM 16 0 4 8 12

SECTION 3 ITEM 17 0 4 8 12

(CSMS) Guidelines

SECTION 3 ITEM 18 0 4 8 12

SECTION 3 ITEM 19 0 4 8 12

SECTION 3 ITEM 20 0 4 8 12

SECTION 3 ITEM 21 0 4 8 12

SECTION 3 ITEM 22 0 4 8 12

SECTION 3 ITEM 23 0 4 8 12

Subtotal X1/9

TOTAL RATING (SECT 1SECT 3)

SUMMARY

The numerical values below are the weighted ratings calculated from field only. This score only for performance control of Contractor field implementation as contribute data to Form CSMS/WIP/01:

The contract holder should compile the Field and Office score.

TOTAL RATING _____________*)

EVALUATED BY:

NAME NAME

TITLE TITLE

DATE DATE

Appendix V.5. Form CSMS/WIP/05:

WORK IN PROGRESS INTERIM REPORT

WORK IN PROGRESS INTERIM REPORT