• No results found

Instructional leadership as perceived by principals of 3 7 teacher schools : a thesis presented in partial fulfilment of the requirements for the degree of Master of Education in Educational Administration at Massey University

N/A
N/A
Protected

Academic year: 2020

Share "Instructional leadership as perceived by principals of 3 7 teacher schools : a thesis presented in partial fulfilment of the requirements for the degree of Master of Education in Educational Administration at Massey University"

Copied!
245
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

TABLE II INTEGRATED PRIMARY SCHOOLS (TO JULY 198,2}
TABLE III ·, ROLLS AND STAFFING RATIOS OF 3-7 TEACHER SCHOOLS
TABLE IV STAFFING OF ,2-'.Z TEACHER SCHOOLS
TABLE VI DISTRIBUTION OF THE SELECTED SCHOOLS BY NUMBER OF TEACHERS
+7

References

Related documents

19% serve a county. Fourteen per cent of the centers provide service for adjoining states in addition to the states in which they are located; usually these adjoining states have

The effects of desertification on climate have been described mainly in terms of changes in land use and land cover leading to land degradation, overgrazing, biomass burning

At the same time, some water level sensors (including the Decagon Devices CTD model used in.. Examples of field applications of the UBeTube instru- ment in a long-term study

The paper is discussed for various techniques for sensor localization and various interpolation methods for variety of prediction methods used by various applications

So we have determined the RNase activity of uninfected and infected plants of two buckwheat cultivars with different resistance to virus.. Roksolana is a

major contributions of the paper are summarized as follows: 1) Compare the fault diagnosis performance using the measured stator current and vibration signals; 2) Compare the

Whereas recent studies on revolving lines of credit suggest a positive relationship between exposure at default and default probability on the line, this paper considers

This is especially useful if for some reason emails are not being sent out or if emails have been deleted and previous build results need to be checked as the build report