• No results found

Three computational methods for analysing thermal airflow distributions in the cooling of data centers

N/A
N/A
Protected

Academic year: 2019

Share "Three computational methods for analysing thermal airflow distributions in the cooling of data centers"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 3 – Sketch of a control volume for the finite volume discretisation of the x-dimension
Figure 3 – Description of fluid motion at different scales.
Figure 5 – Schematic of the benchmark case study data center in cooling operation. Temperatures and airflows indicated by the colour (warm – red; cool - blue) and direction of the arrows
Figure 7 – Layout of datacom units as half rack units.
+7

References

Related documents

ical structure (noise, finite encoders resolution, quantization effects, etc.). The generated control inputs are displayed in Fig. We can see that the amplitudes of the torques of

A partir de la bibliografía analizada en la introducción concretamos varias categorías para el análisis. Como hemos visto, las empresas de prensa pueden gestionar su

Company A is a family owned business working, principally, in housing, retail and other construction (and re-fit), interiors and land development. Key clients include

In this short review, we compile data from the literature pertaining to impact cratering experiments on porous targets, and summarize the ratio of spall diameter to pit diameter,

For example, companies that tends to be in a steady state of growth over a relatively long period of time will be chosen for positional trading method whereas stock values of

If tax revenues are used to gauge the desirability of coordination, our model demonstrates that im- posing a uniform tax rate is Pareto-inferior to the non-cooperative equilibrium

We specialise in the procurement, installation and maintenance of all telecommunications solutions including business telephone systems, Cat5e and Cat6e cabling, fixed lines,

Selecting a development tool was difficult. The project schedule had little time for exploration and there were so many to choose from. The development platform was defined as