Five things you should know about cost overrun
30
0
0
Full text
Figure
Related documents
In this review, the research carried out using various ion-exchange resin-like adsorbents including modified clays, lignocellulosic biomasses, chitosan and its derivatives, microbial
While in Table 3 we present a pooled specification, to increase the chances for the added variables to exert a significant impact, in unreported regressions we repeat the
[r]
[r]
[r]
[r]
[r]
university reform claims that strategic manage- ment has been strengthened in the universities, while the role of university per- sonnel has remained weak. Two major strategy