• No results found

Expected utility theory for monitoring-based decision making

N/A
N/A
Protected

Academic year: 2019

Share "Expected utility theory for monitoring-based decision making"

Copied!
14
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1.  Decision tree of a single-stage decision process, in which the actions  circles represent chance nodes
Fig. 3.  A classifier that provides the optimal action  aaopt out of three options a1, 2 and a3, given the joint observation of two measurements y = {y1, y2}
Fig. 4.  Aerial photo of Streicker Bridge (a) and its structural scheme (b), from [1]
Fig. 6.  Decision tree of Tom’s single-stage decision problem. The two available actions DN and CB lead to different expected utilities
+3

References

Related documents

Quality: We measure quality (Q in our formal model) by observing the average number of citations received by a scientist for all the papers he or she published in a given

Modules across their own purpose sales is to make educated forecasts and utility of sale of an invoice number that in sale of payment for leaving the template?. Little reason to

Sedangkan robot yang menerapkan fuzzy logic untuk wall tracking mencatatkan waktu yang lebih kecil, pada sampling jarang waktu rata-rata robot untuk memadamkan api

He has worked in IBM Development since 1983, holding positions in processor and systems planning, marketing, technical sales support, software development and project

Total extensions of credit on furniture, appliances, and other consumer goods were about 1.1 billion dollars greater during the first ten months of this year than during the same

 Porting a reporting application used by the top level management to from VSAPL/MVS to Dyalog APL/W (Windows NT). 1990 – mid 1990: ICI Lacke

A banking organization’s CCR exposure levels and the effectiveness of its CCR management are important factors for a supervisor to consider when evaluating a banking

Specifically, an IBR verifies that the technical content of the performance measurement baseline is consistent with the contract scope, work breakdown structure, and actual