• No results found

BIM based integrated management workflow design for schedule and cost planning of building fabric maintenance

N/A
N/A
Protected

Academic year: 2020

Share "BIM based integrated management workflow design for schedule and cost planning of building fabric maintenance"

Copied!
36
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 2. Comparison of Multiple Software for 4D and 5D BIM Applications
Table 3. Performance Comparison of Multiple Software for 4D and 5D BIM
Fig.9. BIM Model of Atrium Facades and Curtain Walls
Table 6. Maintenance Information of Curtain Walls in Western and Eastern Atrium Facades

References

Related documents

First, what has been the trend in poverty in South Africa (the contextual research question)?; second, what drives poverty trends in South Africa and how do these drivers

In each community there are many independent providers of continuing education, and libraries can begin to help meet the counseling and information needs of adult

Obstuctive sleep apnea (OSA) adalah gangguan tidur yang dicirikan dengan apnea periodik akibat obstruksi saluran nafas atas selama tidur yang menyebabkan gangguan

This chapter presents examples to show that when information is presented in a terse, structured way, it is easier for people to scan and understand.. Consider two

Our research shows how important nursing is to producing good patient outcomes, and that minority-serving hospitals tend to have less-favorable nurse staffing and poor nurse

This would further safe guard access to health care and planning when other competing free-standing health care facilities are built to ensure that community hospitals are

The result that the regulator can induce commercial banks to undertake some notional socially efficient level of monitoring of portfolio risk through a mixture of auditing and

Our study suggests that final year medical students were significantly more likely to pass a station in the OSCE if undertaken on a later day compared to students