• No results found

Computer construction of (4,4,v)-threshold schemes from Steiner Quadruple Systems

N/A
N/A
Protected

Academic year: 2019

Share "Computer construction of (4,4,v)-threshold schemes from Steiner Quadruple Systems"

Copied!
62
0
0

Loading.... (view fulltext now)

Full text

Loading

References

Related documents

However, despite the increasing use of English and translations in Spanish-language newspapers – particularly from the Transition Period on – the dominant language of publication

During the thesis work, I measured six different parameters: the number of emergency processes, hash table entry number, caching replacement policy, cache entry

Most algorithms for large item sets are related to the Apri- ori algorithm that will be discussed in Chapter IV-A2. All algorithms and methods are usually based on the same

Make  changes  to  section  on  agreements  to   reflect  emphasis  of  agreements  in  new

We also deal with the question whether the inferiority of the polluter pays principle in comparison to the cheapest cost avoider principle can be compensated

• For a home purchase loan, a refinancing, or a dwelling-secured home improvement loan that you originated, report the spread (difference) between the annual percentage rate

Parr and Shanks [18] classify ERP implementations to three broad categories (comprehensive, middle road, and vanilla) and according to them ERP implementations differ with respect

Political Parties approved by CNE to stand in at least some constituencies PLD – Partido de Liberdade e Desenvolvimento – Party of Freedom and Development ECOLOGISTA – MT –