Joint Graphical Models for Date Selection in Timeline Summarization
Full text
Figure
Related documents
Tenants Almost every aspect of our day to day lives has been enhanced by digital tools but real estate has lagged behind Building apps allow tenants to communicate with management,
Slave select/Chip enable (SS/CE) –-This is normally a single wire, where a low equals chip ‘enable’ and a high is chip ‘disable’, which is required for each slave device
Nixon Begins Secret Bombing of Cambodia: In an effort to destroy Communist supply routes and base camps in Cambodia, President Nixon gives the go-ahead to
In Table B.1, Glycogen didn’t gave a positive result in Iodine solution. The formation of reddish-brown or blue-black color indicates the presence
The Events tab reveals two views – the event list and the Timeline. The Timeline is an expanded version of the one on the Dashboard. It is possible to drag the timeline in 3 depths
2.1.3 Geogrid post-construction creep deformation BS 8006 (2010) prescribes a limit on the internal post-construction strain occurring between the end of
Timeline Select to display the search results as event markers in a Timeline view instead of a list of events in the Data Grid view.. Columns Select to display a list of columns
Large presentation image plus small near and far end images POP Large far end image plus small presentation and near end images POP Large near end image plus small presentation