• No results found

Ancillary service provision by demand side management : a real-time power hardware-in-the-loop co-simulation demonstration

N/A
N/A
Protected

Academic year: 2019

Share "Ancillary service provision by demand side management : a real-time power hardware-in-the-loop co-simulation demonstration"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1. Forecasted load profile.
Fig. 2. Real-time power hardware-in-the-loop co-simulation architecture.
Fig. 3. Real-time power hardware-in-the-loop co-simulation validation results, (a) forecasted generation profile, (b) load/generation balance (c) temperature of water at 1000 residential houses, (d) frequency of the micro-grid, (e) price of electricity and
Fig. 4. FCAS provision testing results, (a) forecasted generation profile modified via GUI, (b) load/generation balance (c) temperature of water at 1000 residential houses, (d) frequency of the micro-grid, (e) price of electricity and (f) number of heat pu

References

Related documents

Patients receiving critical care services without meeting deterioration criteria 5 Patients that exhibit warning signs should receive a timely documentation of goals of care

It seems difficult for them to do their daily activities in due time, poor fragmented sleep, late bed time and early wake up, seriously affect their mental health,

This has restricted the growth of the interactive media sector in New Zealand which, ironically, because of its innovative converged nature, has been excluded from legacy

Detection of hepatic vitellogenin mRNA using rt-PCR in male Xenopus laevis frogs after injection with ethinyl-estradiol at various doses………... Protein concentration of sera from

The test results can be shown in the next table, where calls has been divided in successful calls (OK), Failed Calls and other where the voice connection has been established, but

The main aim of this study was to evaluate electrohysterogram (EHG) signals recorded at different gestational weeks for recognizing the preterm delivery using random forest (RF).

In terms of key success factors, when implementing business level strategies — that is, when putting the corporate level strategy into action by determining the specifics of how

 differs from traditional costing in that it considers all estimated costs (the cost of all functions in the value chain - upstream costs in design and development, and