• No results found

Principles of physiological breech birth practice: a Delphi study

N/A
N/A
Protected

Academic year: 2019

Share "Principles of physiological breech birth practice: a Delphi study"

Copied!
28
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Maternal birthing positions encountered by panel members
Table 1. Consensus statements on principles of practice for professionals attending physiological breech births – Percentage of panel in agreement, Likert mean and standard deviation (SD)  Likert scale: 5 = strongly agree, 4 = agree, 3 = neutral, 2 = disagree, 1 = strongly disagree
Table 2. Negative data: Statements on principles of practice for professionals attending physiological breech births which did not achieve consensus – Percentage of panel in agreement, Likert mean and standard deviation (SD) Likert scale: 5 = strongly agree, 4 = agree, 3 = neutral, 2 = disagree, 1 = strongly disagree

References

Related documents

This study demonstrates that administration of chitosan (KiOnutrime-CsG® capsules, 500 mg, 5 capsules/day in three divided doses) results in a significant mean weight loss of about 3

and Batesian mimicry is also more probable in multispecies communities. 5.) Evasive mimicry is possible under certain rare conditions. 6.) Stochastic aggregation plays a big role

2 Research Center for Academic Excellence in Mathematics, Naresuan University, Phitsanulok, 65000, Thailand.. Full list of author information is available at the end of

In this paper, we introduce an iterative method for finding a common element of the set of fixed points of nonexpansive mappings, the set of solutions of a finite family of

 The increased attraction pulls the cloud in, making atoms smaller as we move from left to right across a

The effectiveness of the proposed model is verified using an illustrative project, with the results showing that using soft precedence relations between activities provides

displayed in Figure 6.4. Based on the starting times of the activities in this schedule, a network for the feasible flow problem can now be constructed for resource k = 1 as