Two Stage Flow Shop Scheduling Model Including Transportation Time with Equipotential Machines at Every Stage

N/A
N/A
Protected

Academic year: 2020

Share "Two Stage Flow Shop Scheduling Model Including Transportation Time with Equipotential Machines at Every Stage"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. Mathematical model of the problem  A
Table 4.Optimal allocation of processing time              a’ i on machine Aand A

References

Related documents

$2,645,000 for preliminary plans, working drawings and construction for the California State Polytechnic University, Pomona Student Health and Counseling Center Renovation;5.

It found that theme-based approach, whole language approach, project approach, TPR approach were widely used in Singapore; SAIL, theme-based integrated teaching, emergent

Solution programs (CATIA, DLEMIA, ENOVIA, SMARTEAM,...) to embrace the life cycle of a product: conception, simulation, production and control..

ate latent growth models may represent parallel latent processes, even including regressions of slopes on levels, but they do not allow for cross- lagged dynamic coupling of the

Compared to the some recent deconvolution methods, the above results demonstrate the significant improvement given by the nonlinear wavelet thresholding estimator by

(1997) : Sertoli cell- specific expression of rat androgen binding protein in transgenic mice: effects on somatic cell

Im Rahmen des politik- und mediendidaktischen Workshoptags „Politik im Netz“ der Demokratielandschaft Tirol be- schäftigten sich Jugendliche im Alter von 15-18 Jahren mit der Rolle

2001); Ballantyne, Webs of Empire: Locating New Zealand’s Colonial Past (Wellington: Bridget Williams Books, 2012); David Walker, Anxious Nation: Australia and the Rise of