• No results found

Analysis of OHSAS 18001: 2007 standard renewal towards ISO 45001: 2018 at PT Power Plant Indonesia by using gap analysis method

N/A
N/A
Protected

Academic year: 2020

Share "Analysis of OHSAS 18001: 2007 standard renewal towards ISO 45001: 2018 at PT Power Plant Indonesia by using gap analysis method"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 5. Score Results from Checklist Data Hasil Skor Data Checklist
Table 9. Implementation & Operation Clause Recapitulations
Table 10. Checking Clause Recapitulations

References

Related documents

offering Maybe  Illustrate Tenants/users Speci ic application services Speci ic languages and tools Speci ic libraries and services (e.g. storage) Middleware:

Although these studies document the ability of a MEK inhibitor to radiosensitize certain cells, clearly other cancer cell lines without activating mutations in the Ras/

a) All detectors shall be tested with a listed spray test smoke. b) All detectors shall be tested in all areas accessible to the contractor. c) Validation of all building

Virtualization Layer Task ID4 Instruction Memory Data Memory Part C Processor 0 Dynamically Reconfigurable Interconnection Network Task ID0 Instruction Memory Data Memory Task

The addition to Argentina of Myotis lavali with specimens collected in the Yungas ecoregion of Salta Province, and Myotis izecksohni with specimens collected in the Fields

Our close connections with industry and our reputation as event management experts will give you the start you need to excel in your career.. When you study with us you experience

For example, a decrease in the level of a ligand could either increase signaling (due to cis in- teractions) or decrease signaling (due to trans in- teractions), or both, depending

The fact that ADG during phase 1 was greater for pigs fed the FSBM- Low diet than for pigs fed the NC and FSBM-High diets indicate that FSBM can replace fish meal and SBM-CV in