• No results found

An operational semantics for a fragment of PRS

N/A
N/A
Protected

Academic year: 2020

Share "An operational semantics for a fragment of PRS"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1: Plan-body graphs Gwalk and Gpw. Gpw occurs in aplan-rule for the event-goal program !pw (prepare to walk) inGwalk.
Figure 2: PRS derivation rules for actions, belief updates, and goal commitment.

References

Related documents

For the real profit- loss sharing system documentation must be supplied by institutions, there must be partners work with financial institutions and

Throughout this study it appears that higher investment cost technologies, such as nuclear and coal firing power plants, have a higher LCOE compared to the other power

BEIS applies a discount rate of 8.9% for offshore wind projects and 7.8% for CCGT projects ( HM Government Department for Business, 2016 ); this is in agreement with the range for

This section outlines the method to find the best allocation of n distinguishable processors to m dis- tinguishable blocks so as to minimize the execution time.. Therefore,

A younger sequence, unconformably overlying Rakitu Rhyolite and the "green breccia", consists of breccia, tuff and ignimbrite (Coroglen Subgroup), rhyolite flows and

Flexibility is achieved via the use of directed acyclic graphs (DAGs) to describe actions to configure and customize a VM, and a VM cloning process that can be applied to various VM

Consistent with this perspective, I propose a framework for a leadership development program based on an incorporation of the perceptions of the participants’ most positive

However, to do so would require modifying the alloca- tion rules so that farmers have no need to pressure system managers for special re- leases or to take water from channels in