• No results found

Monitoring 2004 implementation of activities under the EC and Euratom Framework and corresponding specific programmes

N/A
N/A
Protected

Academic year: 2019

Share "Monitoring 2004 implementation of activities under the EC and Euratom Framework and corresponding specific programmes"

Copied!
63
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Participation in contracted FP6 projects per 1,000 research workers. (Data for Malta (MT) not available)
Figure 2. Total sum (€) contracted per researcher FP6 so far (Data for Malta are not available)
Figure 3. Relation between national GERD and financial resources contracted during FP6
Figure 4. Total sum contracted during FP6 related to the country’s GERD for the EU-25 states

References

Related documents

The stripy distribution of the dislocations from the cathode luminescence (CL) image of the GaN film on CPSS demonstrates that CNTs can improve the crystallization quality

On the basis of the quantities set pursuant to paragraph 2 and without prejudice to paragraphs 4 and 5, Member States shall assign production quotas to individual producers who

The study tries to overcome the shortcomings of previous research in several respects: (1) the interven- tions are based on established psychological models; (2) CBT strategies will

The fourth recommendation covers the need for empirical support before the introduction of new data exclusivity protection or an increase in such protection. Thus far, policymakers

The areas of funding for this initiative cover: economic and private sector development; human resources, employment and social policy development; institutional reform

In summary, (1) current agricultural production fails to provide the mixture of foods needed for the world’s population to have the type of balanced diet recommended by

This thesis investigates aspects of the translocation and establishment of 40 North Island saddlebacks from Mokoia Island , in Lake Rotorua, to the fenced

 Is The Patient A Candidate ( Stroke risk score)  COMORBIDITIES ( bleed risk, renal function)  COMPLIANCE AND COST.  NOT THE ANSWER FOR A PATIENT WHO