• No results found

The 5 ' untranslated region of protein kinase C delta directs translation by an internal ribosome entry segment that is most active in densely growing cells and during apoptosis.

N/A
N/A
Protected

Academic year: 2019

Share "The 5 ' untranslated region of protein kinase C delta directs translation by an internal ribosome entry segment that is most active in densely growing cells and during apoptosis."

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

FIG. 1. The 5pSV-coding region from pGL and the 5�-galactosidase activity conferred by pGL is normalized to a value of 1 for each cell line
FIG. 2. The 5�pendent scanning is inhibited in a monocistronic construct. (A) Sche-matic diagram of the constructs used
FIG. 3. The 5�luciferase activities conferred by pR-F are normalized to a value of 1. The results shown are the mean and standard error of the mean from at leastfive independent transfections
FIG. 4. The 5�RenillaFor each cell line, the relativereadthrough in the bicistronic construct
+4

References

Related documents

Impact of Agile Manufacture Impact of Agile Logistics Level 1 Principles Level 2 Programmes Level 3 Actions Postponed fulfillment Postponed fulfillment Agile Supply Chain Agile

Ooh my one i cancel maintenance ansley princeton lakes we offer the pet policy at ansley place the pet policy at pulte homes in the phone.. Sofa that if you want a brother,

❑ A few days before the start of term, encourage enrolled students to register for access to Oxford University Press’s premium digital learning resources for The Cell and

provided that: "Failing proof to the contrary, knowledge of the blockade is presumed if the vessel left a neutral port subsequently to the notification of the

The present study was to examine the improving of EFL learners language speaking performance using TPRS method applied to two different groups of

The complete Economic Equity Inclusion Plan shall be attached to the Bid Form (Douglas County Request for Bid and Bid Sheet On: City of Omaha Tranquility Park Maintenance

The financial data has been prepared by and is the responsibility of the Company’s management and does not present all information necessary for an understanding