Financial services and the Transatlantic Trade and Investment Partnership. CEPS Policy Brief No. 302, 20 November 2013
Full text
Figure
Related documents
Kerzner’s Level 2 assessment tool was used, which basically assesses maturity levels throughout the various phases of an organization’s project management life
The overarching goal of the studies within the frame of the VgtS project in Burkina Faso and Nepal is to address the current data gap on schoolchildren (aged 8 – 14 years) and to
Besides that, the Portuguese Smart Cities Index, 2016, points out the city of Oporto as the Portuguese city with better results in what concerns the main vectors of
sport outcomes of health, well-being and social capital and between participation and the outcomes as well. Results suggest that portfolio of sport activities
• 1.6M Nokia Eseries devices sold 2006 ytd –162 operators ranging Nokia Eseries. –Early signs
This system based on the J2EE platform, using C/S and B/S mode and the combination of architecture, achieved the system of the information management function,
In the present study, to identify the inhibition of CAC concrete, corrosion test including corrosion potential, chloride binding capacity and chloride transport were measured
35/48 With regard to macrostrategies, it is concluded that the microstrategies found in TT1 of the analyzed segments indicate that the macrostrategy applied to TT1 is neither