GUIDELINES FOR THE PREPARATION OF ANNUAL
DISTRICT EDUCATION OPERATIONAL PLAN
(ADEOP)
1. INTRODUCTION
Decentralization of educational planning and management is an important reform
measure. It is widely accepted that a district is the lowest viable unit for initiating
decentralised planning. An Annual District Education Operation Plan (ADEOP)1 is
the key document in this reform. As a three-year annualised rolling work plan, it
projects educational progress toward achievement of strategic mission, goals, and
objectives. The operational plan is the basis for and the justification of an annual
operating budget request.
This year, the Ghana Education Service (GES) has renewed its template to improve
quality of district planning by reflecting the following points: 1) providing basis of
the plan: promoting evidence based planning, 2) providing targets of key indicators
at the district level, 3) more clarifying expected outputs and annual budgets, 4)
ensuring consistency with the AESOP and 5) introducing more effective cost
management. These guidelines stipulate the renewed components of the ADEOP
and its procedure for development and review as outlined below.
2. COMPONENTS OF ADEOP Outline of ADEOP
Use the ADEOP Template for submission of the operational plans. The template is
made of an Excel workbook containing worksheets for various components. It
includes a projection of school age population drawn from its past trends, key
1 Though the name of the document varies according to the status of MMD such as Metropolis, Municipality and
indicative targets in the areas of access, quality and physical infrastructure for the
next three years and activity matrices containing strategies, activities, output
targets, estimated costs, funding source, unit or agency responsible and the means
of verification for all levels. Costing summary should also be attached to each area
as well as to the total. Operational matrices are in conformity with the current
AESOP across all educational levels.
Key Features of the New Template
Key features of the new template as compared to the old template are as follows:
1) Basis of the plan provided: promoting evidence based planning
• Statement of Vision and Mission is added as it is the basis for all actions
planned in the district.
• Projection of school age population up to SY2019/20 is mandated as it is the
basis for all quantitative planning.
2) Targets of key indicators shown
• Targets of key indicators listed in the ADPR for the next three years and for
SY2019/20 are required to be shown. These need to be set to give
justifications for planned activities as well as to have effective monitoring of
progress in the district.
3) Expected outputs and annual budgets clarified and its consistency with the
• The new template of AESOP 2011-13 is applied for the Activity Matrix of
each level in order to clearly show expected outcomes, expected outputs,
activities and estimated costs for each year.
4) Cost management strengthened
• Summary Cost Matrix is mandated in this template to raise financial
credibility of the plan.
Vision and Mission
District vision and mission shall be stated in a sentence or a paragraph as the basis
for all actions planned in the district. The definition for a Vision Statement may be
a sentence or a short paragraph providing a broad and inspirational image of the
future. A Vision Statement must contain details of the district's future - (the future
plans with aims and objectives). This type of Statement should focus on tomorrow.
A good definition for a Mission Statement is a sentence or a short paragraph which
is written by the organization which reflects its core purpose, identity, values and
principle business aims.
Projection of School Age Population
Projection of school age population is the very basis on quantitative planning of
educational resources such as schools, classrooms, teachers and textbooks. It is
therefore necessary to show the population projection as the basis for target setting
of key indicators as well as for budget estimates in the ADEOP. The template
requires projection of school age population up to 2020, which is the end year of
Key Performance Indicators
To justify the continuation or enhancement of funding for a programme,
effectiveness, efficiency, and excellence of the programme must be demonstrated
and documented in the ADEOP. Performance indicators are the tools used to
measure performance, progress, and accomplishments. Balanced sets of
performance indicators are developed during strategic planning and used in the
ADEOP and other budget forms to justify budget requests. It is essential that the
performance indicators and other data cited in the Plan be valid, accurate and
reliable. They must be clear and simple but informative as well as consistent and
verifiable. Targets of performance indicators listed in the template shall be
indicated for each year of the duration of the ADEOP together with the targets for
the school year 2019/20 which is the end of the current ESP. Targets that cannot be
determined by the GES such as the number of private schools, students and
teachers in private schools could be projected from data in the past five to ten years.
Operational Matrices 1) Outcome Indicators
Outcome indicators measure overall achievements resulted from various reform
activities. They measure results and gauge programme effectiveness. Outcome
indicators are the most important performance measures because they show
whether or not expected results are being achieved. Outcome indicators
demonstrate return on investment. These are represented by Gross Enrolment Rate,
Net Enrolment Rate and so on as indicated in the template. The ADEOP should
2) Expected Outputs
Direct results of activities which are expected after their completions are called
expected outputs. These shall be indicated for all activities planned in the ADEOP
for each year of its duration. These should be measurable and as numerical as
possible for easy monitoring and evaluation. Sufficient levels of expected outputs
need to be planned to achieve its expected outcomes.
3) Operations and Projects
There should be relevant activities that yield sufficient levels of outputs to fully
achieve outcome level targets. When planning activities, it should be also taken
into consideration availability of funds for them. Activities with no possibility of
fund allocation should not be included in the ADEOP. Statements of activities
should be made as specific as possible on such as beneficiaries and areas of
interventions. It should be noted that following the guidelines of the Programme
Based Budgeting, the ADEOP template use the terms, Operation and Project,
rather than Activity to follow the dimensional change from activity based
budgeting to programme based budgeting. Operations refer to activities under
recurrent budgets while Projects refer to activities under capital spending.
Activities in the ADEOP need to be distinguished on whether these are operations
or projects by giving different type of serial numbers as explained in the template.
Costing
Expected costs of all activities shall be projected for each year of the duration of
the ADEOP. Costing summaries of respective sub-sectors shall be also placed at
the costing summary of the entire ADEOP shall be also shown together with unit
costs for each sub-sector. These are effective to take a serious look at feasibility of
the plan from the viewpoint of financial aspects. The costing should be examined
in the light of expenditure histories of the past in the district.
Annual District Education Action Plan (ADEAP)
Due to the change of the planning template, no more submission of the ADEAP is
required to regional education offices and headquarters. It can be used inside the
district to keep operational details to implement planned activities including
budgeting for detailed components of activities and time frame during the year.
3. PROCEDURAL ARRANGEMENT OF ADEOP Responsible Officers
The MMD Director of Education is responsible for the development of the entire
document. S/he may be assisted by his/her front-line Assistant Directors who will
provide all relevant and necessary information. MMD Education Planning Team
can vigorously work on drafting the plans. During the preparation it needs to be
made sure that a planning authority of the MMD Assembly is properly involved.
The ADEOP shall have a proper endorsement of the District Education Oversight
Role of Headquarters
Headquarters is responsible for the development of the framework of the ADEOP.
It is responsible for revision of the template when deem necessary. It provides
technical and financial assistance to regions to conduct training and for district to
develop and implement their plans.
Role of the Regional Education Office
The Regional Education Office provides technical assistance by supporting
districts to develop, monitor and evaluate their plans. The office facilitates
implementation of training sessions for all district directors, planning, statistics and
budget officers who are directly involved in the development of the Plans. The
office keeps both soft and hard copies of ADEOPs presented by districts.
The Regional Education
Office uses information from
the ADEOPs to evaluate
performance of districts and
support budget decision
making.
The ADEOPs that do not
comply with the guidelines
established (and provided in
returned to the submitting district for modification.
Submission
A filled ADEOP template should be submitted in both soft and hard copies to the
regional planning officer by the end of August. The actual date for submission is
notified by the headquarters.
Two hard copies and two CDs should be submitted by district directors for onward
submission to region and headquarters. The filled ADEOPs will be displayed on
the website managed by the headquarters.
Every District is required to submit an ADEOP for review and approval.
Delay of submission or neglect could cause negative influence on their budget
negotiation process.
Contact Person(s)
Provide the name, title, and contact numbers (telephone, and e-mail) of the
person(s) whom HQ/REO should contact if there are questions about the
operational plan or if additional information is required. This contact should be the
person who has coordinated or prepared the ADEOP. However, for budget units
encompassing many programmes, you may wish to provide a list of contacts, one
for each programme described in the operational plan, in addition to the principal
Please note that the HQ/REO may require the submission of additional information
to augment an ADEOP or to explain issues identified during the analysis as well as
other budget request materials.
Getting Help
If you have questions about preparing your ADEOP, contact the Advisory Unit on
Decentralised Education Management, Basic Education Division
Benedicta Naana Biney
AG Director-General
Ghana Education Service
Finalised by Endorsed by
Name: Name:
Title: (MMDA Director of Education) Title: (Chair of DEOC)
Date: Date:
Signature: Signature:
2012-14
(DRAFT)Annual DISTRICT EDUCATION operational
ghana education service
PLAN (adeop)
FOR
Statement of Vision and Mission
Name of District/Municipality/Metropolitan:
Vision
School Age Population in the district
Past trend of population
2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 Total Male Female Total Male Female Total Male Female Total Male Female Total Male Female Total Male Female Projection
1. Kindergarten
National
Access 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of kindergartens Total
Public Private Number of pupils in all kindergartens Total
Male Female
Number of pupils in public kindergartens Total 75%
Male Female
Number of pupils in private kindergartens Total 25%
Male Female
Gross Enrolment Rate (GER) Total 100.0% by 2015
Male Female
Gender Parity Index (GPI) on GER 1.00 by 2012
Net Enrolment Rate (NER) Total 90.0%
Male Female Distance to school from village centre Average
Longest
Transition Rate from KG2 to P1 Total
Male Female
National
Quality 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of teachers in all schools Total 18,800
Male Female
Number of teachers in public schools Total
Male Female Number of teachers in private schools Total
Male Female
Percentage of trained teachers Total 95% by 2015
Public
Key Indicator targets
District
Public Private
Pupil Trained Teacher Ratio Total
Public Private
National
Physical Infrastructure 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of classrooms in public KG Pupil Classroom Ratio in public KG
0% Number of new classrooms needed in public KGs
Percentage of public KG with play/recreational facilities
Percentage of public KG with electricity
Percentage of public schools with Sanitation
facilities Potable water
2. Primary School
National
Access 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of primary schools Total
Public Private Number of pupils in all primary schools Total
Male Female
Number of pupils in public schools Total 80%
Male Female
Number of pupils in private schools Total 20%
Male Female
Gross Enrolment Rate (GER) Total 107%
Male Female
Gender Parity Index (GPI) on GER 1.00 by 2012
Percentage of classrooms in public KGs needing major repair
Female
Net Admission Rate (NAR) Total
Male Female Distance to school from village centre Average
Longest
Completion Rate at P6 Total 100.0% by 2015
Male Female
Transition Rate from P6 to JH1 Total
Male Female
National
Quality 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of teachers in all schools Total
Male Female
Number of teachers in public schools Total
Male Female Number of teachers in private schools Total
Male Female
Percentage of trained teachers Total 95% by 2015
Public Private
Pupil Teacher Ratio Total 45 by 2015
Public Private
Pupil Trained Teacher Ratio Total
Public Private
Pupil Core Textbook Ratio in public schools 3.0
National
Physical Infrastructure 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Percentage of public schools with
Sanitation
facilities 75%
Potable
water 75.0%
District
Percentage of public schools with School Management Committee (SMC)
Percentage of public schools with functioning SMC
Public Private Number of classrooms in public schools
Pupil Classroom Ratio in public schools
0%
3. Junior High School
National
Access 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of junior secondary schools Total
Public Private
Number of students in all schools Total
Male Female
Number of students in public schools Total
Male Female Number of students in private schools Total
Male Female
Gross Enrolment Rate (GER) Total 105%
Male Female
Gender Parity Index (GPI) on GER 1.00 by 2012
Gross Admission Rate (GAR) Total 100.0% by 2012
Male Female
Net Enrolment Rate (NER) Total 90% by 2015
Male Female
Net Admission Rate (NAR) Total
Male Female Distance to school from village centre Average
Longest
Completion Rate at JH3 Total 100% by 2015
Male Female
Transition Rate from P6 to JH1 Total
Number of new classrooms needed in public schools
District Percentage of classrooms in public schools needing major
National
Quality 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of teachers in all schools Total
Male Female
Number of teachers in public schools Total
Male Female Number of teachers in private schools Total
Male Female
Percentage of trained teachers Total 95% by 2015
Public Private
Pupil Teacher Ratio Total 35
Public Private
Pupil Trained Teacher Ratio Total
Public Private
Pupil Core Textbook Ratio in public schools 3.0
BECE pass rate by gender Total
Male Female
BECE pass rate by core subjects Eng
Math Science Social Study
National
Physical Infrastructure 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Percentage of public JHS with
Sanitation
facilities 100% by 2015
Potable
water 75%
Percentage of public schools with electricity
Number of schools under tree Total
Public Percentage of public schools with functioning SMC
District
District Percentage of public schools with School Management
Pupil Classroom Ratio in public schools
0%
Percentage of JHS with a computer teaching lab 25%
Percentage of JHS with a science lab
4. Senior High School
National
SHS 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of senior high schools Total 750
Public Private
Number of students in all schools Total
Male Female
Number of students in public schools Total
Male Female Number of students in private schools Total
Male Female
Gross Enrolment Rate (GER) Total 100%
Male Female
Gender Parity Index (GPI) on GER 1.00 by 2015
Completion Rate at SH3 Total 40.0%
Male Female
Number of teachers Total
Public Private
Percentage of trained teachers Total 95% by 2015
Public Private
Pupil Teacher Ratio Total 30
Public Private
Pupil Trained Teacher Ratio Total
Public Private
WASSCE pass rate by gender Total 70% by 2015
Male
District Percentage of classrooms in public schools needing major
repair
Social Study Number of classroom in public schools
Pupil Classroom Ratio in public schools
Number of schools with a resource computer room Total 100%
Public
5. TVET
National 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of TVET schools Total 40
Public Private
Number of students in TVET schools by gender Total 96,400
Male 63,624
Female 32,776 40%
Public Private
Percentage of qualified teachers Total
Public Private
6. Special School
National 2010/11 2011/12 2012/13 2013/14 2019/20 2019/20
Baseline Target Target Target Target Target
Number of special schools Total
Public Private Number of students in all special schools Total
Male Female
Percentage of qualified teachers Total
Public Private Number of students in TVET schools by type of
school
District District Number of new classrooms needed in public schools
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20 Core Outcome Measures/ Indicators
KG Primary
JHS
Core Outcome Measures/ Indicators KG
Primary JHS
Core Outcome Measures/ Indicators KG
Primary JHS
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014 BE1: Make available public
and private child-friendly basic education for all.
BE3: Remove barriers to education by improving pupil welfare to motivate parents and learners to attend school
Sub-total 0.0 0.0 0.0
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20 Core Outcome Measures/ Indicators
KG
Objective 2: Bridge gender gap in access to education [SH]
Basic Education Operational Matrix
BASIC EDUCATION LEVEL – Strategic Goal: Provide equitable access to good-quality child-friendly universal basic education, by improving opportunities for all children in the first cycle of education at kindergarten, primary and junior high school levels
Objective 1: Improve equitable access to and participation in quality education at all levels [Socio-Humanistic]
Output Targets (fill with payroll / emis) Strategy / Cost Area Operation/Project (S/N)
* Serial Number should be headed by OP for operations or PJ for projects, e.g. OP001 or PJ001.
GER
Total Number of Schools
BE4: Ensure equal basic education opportunities for BE6: Ensure that all BE schools meet national norms in health, sanitation and safety
Pupil Classroom Ratio NER
GPI
Estimated Costs (000 GH¢)
Girls Completion Rate
Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014
Sub-total 0.0 0.0 0.0
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20 Core Outcome Measures/ Indicators
KG Primary
JHS
Core Outcome Measures/ Indicators KG
Primary
JHS
Core Outcome Measures/ Indicators KG
Primary JHS
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014
Sub-total 0.0 0.0 0.0
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20
Core Outcome Measures/ Indicators KG
Primary JHS
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014 Operation/Project (S/N)
Output Targets (fill with payroll / emis)
Science Target: To be finalized with 2011 assessment Number of Schools with computer labs or access to computer labs /% of JHS with computer lab
Estimated Costs (000 GH¢) Pupil Core Textbook Ratio (Based on three text : 1 student)
Estimated Costs (000 GH¢)
Improve L1, L2 and Math NES P3 and P6. 60% of P6 students proficient by 2012. BECE scores
BE9: Provide all BE schools with an up-to-date curriculum
Objective 5: Improve quality of teaching and learning [ED]
Strategy / Cost Area
BE12: Ensure that all P6 graduates are literate and numerate in English and a Ghanaian language
Objective 6: Promote science and technical education at all levels [ED]
[BE13] Provide relevant
Strategy / Cost Area Operation/Project (S/N)
Output Targets (fill with payroll / emis) BE 10:Ensure that
girl-friendly guidance and counselling systems are in place centrally and in Districts
% trained teachers
Baseline
(2010) 2012 2013 2014 2020 Baseline (2010) 2012 2013 2014 2020
CoE Residential KG
UTDBE Primary
Cert-A Upgrade JHS
All BE Schools Primary
JHS All BE Schools
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014
BE15: Ensure that the teaching service provides value for money in terms of pupil contact time and effective learning
[BE20] Establish and operationalise an effective National Inspectorate Board
Sub-total 0.0 0.0 0.0
Total Costs
Estimated Costs (000 GH¢) BE16, 17, 19: Develop
Operational SMCs; provide capitation grants; Develop an open mutual-accountability scheme for parents, teachers, BE schools and Districts
Objective 8: Improve management of education service delivery [ECON]
BE21: Rationalise the deployment of KG, PrS, JHS teachers
BE14: Improve the preparation, upgrading and deployment of teachers and head teachers especially in disadvantaged areas
BE18: Remove the ‘subsidy culture’ from the BE sub-sector.
Strategy / Cost Area
Estimated Costs (000 GH¢) Output Targets (fill with payroll / emis)
Core Cost Areas
Number of Active SMCs Time on Task (Increase)
Teacher Absenteeism (Reduce)
Operation/Project (S/N)
Estimated Costs (000 GH¢)
Baseline (2010) 2012 2013 2014 Core Cost Areas
Total Costs for sub-Sector
Source of funding Baseline (2010) 2012 2013 2014
GOG GETFund
Social Intervention Programme
Internally Generated Fund
Donors
District Assembly Common Fund
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20 Core Outcome Measures/ Indicators
SHS TVET Apprenticeship
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014
Sub-total 0.0 0.0 0.0
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20 Core Outcome Measures/ Indicators
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014
Sub-total
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20 Core Outcome Measures/ Indicators
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014
Sub-total
Output Targets (fill with payroll / emis) Estimated Costs (000 GH¢) SHS Completion Rate
% Trained Teachers (SHS and TVET)
SHS PTR
SSCE Pass Rate - 70% by 2015
Objective 5: Improve quality of teaching and learning [ED]
Strategy / Cost Area
Output Targets (fill with payroll / emis) Output Targets (fill with payroll / emis)
Increase Pupil Core Textbook Ratio (four text: student)
Strategy / Cost Area Operation/Project (S/N)
% Female Enrolment
SECOND CYCLE LEVEL – Strategic Goal: Increase equitable access to high quality second cycle education that prepares young adults for the various options available within tertiary education and the workplace
GER
SHS GAR
Estimated Costs (000 GH¢) Estimated Costs (000 GH¢) Number of New SHS Schools
SHS Pupil Calssroom Ratio
Operation/Project (S/N)
Objective 3: Bridge gender gap in access to education [SH]
Secondary Education Operational Matrix
Objective 1: Improve equitable access to and participation in quality education at all levels [Socio-Humanistic]
Strategy / Cost Area Operation/Project (S/N)
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014 13. Ensure that all SC
completers have appropriate skills for future study and work.
Sub-total 0.0 0.0 0.0
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20 Core Outcome Measures/ Indicators
Targets to be set Targets to be set
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014 17. Remove the ‘subsidy
culture’ from the SC education sub-sector
Sub-total 0.0 0.0 0.0
Core Costs
Baseline (2010) 2012 2013 2014
SHS Compensation of employees Goods and services
Assets Liabilities Total for SHS
TVET Compensation of employees Goods and services
Assets Liabilities Total for TVET
Total Costs for sub-Sector
Source of funding Baseline (2010) 2012 2013 2014
GOG GETFund
Social Intervention Programme Internally Generated Fund Donors
District Assembly Common Fund Total
Estimated Costs (000 GH¢)
Estimated Costs (000 GH¢)
Estimated Costs (000 GH¢)
BOGs Established Reduction of SHS Subsidy / Borders (50% by 2016)
Objective 8: Improve management of education service delivery [ECON]
Output Targets (fill with payroll / emis)
Strategy / Cost Area Operation/Project (S/N)
Output Targets (fill with payroll / emis) Strategy / Cost Area Operation/Project (S/N)
Baseline
(2010-2011) 2011/12 2012/13 2013/14 2019/20 (2010-2011)Baseline 2011/12 2012/13 2013/14 2019/20 Core Outcome Measures/ Indicators
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline (2010) 2012 2013 2014 [IS 1] Include
disadvantaged children ithi th i ti
Sub-total 0 0 0
Core Costs
Baseline (2010) 2012 2013 2014 Compensation of employees
Goods and services Assets
Liabilities
Total Costs for sub-Sector
Source of funding Baseline (2010) 2012 2013 2014
GOG GETFund
Social Intervention Programme Internally Generated Fund Donors
District Assembly Common Fund Total
Estimated Costs (in thousand of Gh Cedi)
Enrolment (Increase 20% annually) Increase Mainstreaming
Estimated Costs (000 GH¢)
Core Cost Areas
Output Targets (fill with payroll / emis)
INCLUSIVE AND SPECIAL EDUCATION LEVEL – Strategic Goal:Provide education for excluded children (including those who are physically and/or mentally impaired or disabled, slow/fast learners, orphans, young mothers, street children, those from deprived areas, slum children, poverty victims) by including them, wherever possible, within the mainstream formal system or, only when considered necessary, within special units or schools
Objective 1: Improve equitable access to and participation in quality education at all levels [Socio-Humanistic]
Strategy / Cost Area Operation/Project (S/N)
Unit-Agency
Responsible Funding Source VerificationMeans of Baseline
(2010) 2012 2013 2014 Baseline(2010) 2012 2013 2014
EM2: Identify, clarify and strengthen education delivery at all levels of the education system; Deliver Education through decentralized management - Effective transition of education delivery from central MoE/GES to Districts in line with the 2010 Decentralization Policy EM3: Strengthen M&E, accountability and efficiency measures across the whole sector at all levels (Ensure education system is efficient and publicly accountable)
EM5: Develop and implement equitable resource allocation systems that are available to public scrutiny
Upgrading Financial Management System to support GIFMIS implementation
Establish and operationalize: National Teaching Council
Establish and operationalize: National Council for Curriculum and Assessment MoE to clarify role of COTVET
SUBTOTAL 0 0 0
Core Costs
Baseline (2010) 2012 2013 2014 Compensation of employees
Goods and services Assets Liabilities
Total Costs for sub-Sector
Source of funding Baseline (2010) 2012 2013 2014
GOG GETFund
Social Intervention Programme Internally Generated Fund Donors
District Assembly Common Fund Total
Operation/Project (S/N)
Core Cost Areas Estimated Costs (in thousand of Gh Cedi) Output Targets (fill with payroll / emis)
Management Operational Matrix
Estimated Costs
EM4. Strengthen the Education Management Information System (EMIS) and improve the availability of education statistics
Focal Area: EDUCATION MANAGEMENT- Strategic Goal-To improve planning and management in the delivery of education by devolving resource management, decision-making and monitoring to regions, districts and institutions, while retaining central responsibility for establishing norms, guidelines and system accountability
Management Activities
Summary Cost Matrix
Sub-Sector
Baseline (Expenditure
in 2010) 2012 2013 2014
Baseline (Expenditure in
2010) 2012 2013 2014
Basic SC (&TVET) ISE
Management and Sub-vented
Total
Budget items
Baseline (Expenditure
in 2010) 2012 2013 2014
Compensation of employees
Goods and services Assets
Liabilities Total
Source of funding
Baseline (Expenditure
in 2010) 2012 2013 2014
GOG GETFund
Social Intervention Programme Internally Generated Fund Donors
District Assembly Common Fund
Total
Figures in thousands of GH cedi; Not inflation adjusted
Total Budget Unit Cost
Total Budget