Resting-state Functional Network Disruptions in a Rodent Model of Mesial Temporal Lobe Epilepsy (TLE)
Full text
Figure
Related documents
Immediately after the prospect has left the meeting, the staff professional should debrief the members of the solicitation team and plan the next steps, includ- ing thanking the
On the non- technical or less quantitative side, areas that have received attention include case studies describing the use of revenue management in various industries,
Different method can be considered for planning of project management such as Work Breakdown Structure (WBS), Critical Path method, Project Evaluation and Review
Mistakes happen—especially at the polls on Election Day. To fix this complex problem inherent in election administration, this Article proposes the use of simple checklists. Errors
Cultural distance, political risk and location decisions of emerging-market multinationals: A comparison between Chinese and Indian firms1. Diego Quer (corresponding author)
The three goal areas are consistent with the data collected, fit within the evidence-based Six Prevention Strategies, and best address the needs and culture of our community..
5160 Professional Pharmacy Fees 5161 Physical Therapy Fees 5165 Special Class Fees 5170 Student Activity Fees.
RESULTS AND DISCUSSION Cut test analysis result showed that treatment using LF as starter in 15 kg fermen- tation capacity resulted in significantly better performance of