• No results found

esarkar Helpdesk Document June, 2012 Version 1.0

N/A
N/A
Protected

Academic year: 2021

Share "esarkar Helpdesk Document June, 2012 Version 1.0"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

(1)

eSarkar Helpdesk Document

June, 2012

Version 1.0

(2)

TCS Confidential 2

Notice

© 2012 Tata Consultancy Services Limited

This is a controlled document. Unauthorized access, copying, replication or usage for a purpose other than for which it is intended, are prohibited.

All trademarks that appear in the document have been used for identification purposes only and belong to the respective companies.

Government Industry Solution Unit (ISU) TCS Punjab IFMS & IWDMS Team

(3)

Document Release Note

Document Details

Name Version Number Description

Helpdesk 1.0

This Document describes Methodology and Prcoess of Support at e-Sarkar Helpdesk

Revision Details

Reference No Action Taken ( Add / Del / Change / Replace)

Preceding Page No.

New Page No. Revision description

This document and any revised pages are subject to document control. Please keep them up-to-date using the release notices from the distributor of the document.

Approved by: Authorized by:

(4)

TCS Confidential 4

Contents

1. Overview ... 6

2. Location Details and Office Hours ... 7

3. Application Support ... 8

4. eSarkar Helpdesk Support Levels ... 15

(5)

List of Abbreviations

Abbreviation Expanded Form

TBP Treasury Bill Processing

OBP Online Bill Processing

BT Book Transfer

DMO Debt Management Office

DDO Disbursement Drawing Office

GoP Government of Punjab

CTP Cyber Treasury Portal

AG Accountant General

HoD Head of Department

CO Controlling Officer

CSS Central Sponsored Scheme

(6)

TCS Confidential 6

1. Overview

The eSarkar Helpdesk provides the support to the users from 95 Treasuries and 44 Departments approx. including Main & Mini Secretariat. eSarkar helpdesk provides the technical and functional support to all the users covered under the project. The Helpdesk will also serve as Project Information Centre where in users can come and get awareness about the application, get their queries resolved and also try hands on experience of the application. Some of the functions of eSarkar Helpdesk cum Project Information Centre are as follows: • eSarkar Helpdesk

o Technical and functional support manned by 5 support staff having PC and Phone. o Respond to the user queries/problems and resolve the issues or raise a problem

request in the system.

o Toll Free number for first level support

o Serve as a single point of contact for all Infrastructure related problems o Serve as a single point of contact for all Application related problems

• Project Information Centre

o 4 Workstations with access to the applications

o User can directly contact with the helpdesk for the demonstration of application and practice the same.

o Individual training needs related to application usage will also be addressed at Information Centre.

(7)

2. Location Details and Office Hours

Help Desk Location:

eSarkar Help Desk Punjab Civil Secretariat, Ground Floor, Sector-1, Chandigarh

Helpdesk Toll Free No:

1800-4190737

Email: [email protected], [email protected]

Hours of Operation:

Operating Hours: 8:00 AM to 8:00 PM on any day any department of the GoP is functional. Government holidays are excluded from operating hours.

Methods of Contact

User can contact the eSarkar Help Desk by using the following mediums-

• Medium I: User can call o following Toll Free Number of E-Sarkar Help desk-

o

Toll Free No: 1800-4190737

• Medium II: Users send an E-mail to eSarkar Help desk-

Email: [email protected], [email protected] • Medium III: Users can Visit eSarkar Help desk at following address-

o eSarkar Help Desk Punjab Civil Secretariat, Ground Floor, Sector-1, Chandigarh.

• Medium IV: Users can directly Login into eSarkar Helpdesk Manager-

(8)

TCS Confidential 8

3.

Application Support

The eSarkar Help Desk provides support for the following applications (Incident Area /Sub Area) and services.

IFMS Application

o Treasury Bill Processing (TBP)

Unable to Complete Detail Bill Entry

Unable to print cheque

Bill not forwarded in Correct user account

Bill not reflected in cheque preparation

Update BT of Bill

Unable to dispatch chequre from outward o Accounting

Cash book receipt and receipt subsidiary register mismatch

Cash Account Not generated

account report not printing or unable to generate

Updation of Head Structure

Correction in voucher BT head structure / BT Amount

Direct voucher posting screen not working

While uploading Receipt E Scroll, Contact to Helpdesk error is generated. o Office Accounting

Statement of Account not generated.

Forest Account Entry is not getting saved.

AG Account entry is not getting saved. o Strong Room

Unable to update challan

Update closing and opening balance of stock o Cheque Inventory

Cheque series is not available. o Debt Management Office (DMO)

DP Sheet detail Entry not generated

Report Not Generated

Market Loan Entry is not saved o Online Bill Processing

Unable to open login ids of DDO users.

Change in amount of bill after submitting the bill to treasury office.

Unable to get bill back from treasury office.

Change user login id incase of transfer of DDO

Error occurred while saving/submitting the bill

Update head structure of bill after submitting the bill in treasury office

Grant is not reflecting in DDO Grant heads link o Cyber Treasury

Unable to register in CTP for payment of receipt.

(9)

Payment status is not reflected or showing failure.

Unable to redirecting to bank site for payment. o Grant

Unable to release amount to HOD to CO /CO to CO /CO to DDO

Unable to revoke amount from HOD to CO /CO to CO /CO to DDO

Correct/Proper amount is not reflecting in screen o Budget

Unable to forward the Budget Estimate to the next level

Unable to generate the Budget Books/ Reports

How to get the overall budget approved

Not able to release amount in a particular head o Planning

CSS Annexure before scheme code display CS

Labels are not printed correctly

Formating is not proper

Provide Print Option in Each Outlay Screen. o Pension

PPO entry not saved

Pension revision case cannot be entered

Old PPO cannot update

Pension report not generated

IWDMS Application

o Core Application Issues

Required Subjects not available

DAK not getting forwarded to correct User-ID

Not able to attach documents in KMS

Internal/External Department not available

Punjabi Font not available

Incorrect Post/Department for the user getting displayed

Unable to perform dispatch against DAK

Inward Registry showing incorrect information

Outward Registry showing incorrect information

Unable to add documents in Knowledge bank

Issue in searching old DAK/File

Issue in creating new appointments

Unable to delete documents from Knowledge bank

Unable to search contact for sending communiqué

Unable to track existing communiqué

Unable to delete old communiqués

Unable to search documents in Knowledge Bank

Common Application Issues

o Generic Common Application Issues

(10)

TCS Confidential 10

o Employee Information System

Unable to update information in Employee Information System

Incorrect Information not getting displayed in Employee Information System

Unable to add Information in Employee Information System o Service Book

Incorrect information displayed in Service Book o Leave

Incorrect information displayed in Leave System

Unable to raise request for leave

Unable to find status of existing leave request o Court Case Application

Not able to find existing court case

Unable to add new court case information

Issue in generating MIS for Court Case Information o Asset Management

Problem in raising request for new asset

Unable to track status of existing asset request

Unable to approve new asset requisition o LAQ (Legislative Assembly Questions)

Problem in adding new LAQs

Issue in tracking previously added LAQs

Unable to add reply to LAQ o Loans/Advance Module

Problem in raising new Loans/Advance Request

Unable to find status of existing loans/advance request

Unable to approve Loans/Advance Request o Annual Confidential Report

Unable to add ACR Goals

Issues in adding achievements in ACRs

Issues in approving ACR o Monitoring of GOI Issues

Unable to add new GOI Issue

Unable to assign action against an Issue

Unable to update status of GOI Issue o Grievance Application

Unable to raise a Grievance

Issue in Tracking an existing Grievance

(11)

Unable to forward Grievance to required authority o RTI

Unable to add request for RTI

APIO/PIO not configured for RTI request

Not able to track existing RTI

Unable to generate MIS for RTI o VPMS – Visitor Pass Management System

Unable to generate Pass using VPMS

Photo not getting attached while creating Passes

Issues in printing visitor pass o VPMS – Online VPMS

Unable to approve VPMS request o Cabinet Meeting Module

Unable to schedule new meeting

Issue in adding agenda

Problem in assigning action items

Issue faced in responding to action items o Constitution and Monitoring of committees

Unable to create a new committee

Problem in adding members to new committee

Issue in scheduling meeting for committee

Issue in adding action items to committee members o Travel and Tour – Request

Issue in raising new Travel and Tour Request

Problem in tracking current status of request

Issue in approving travel and tour request

o Travel and Tour – Reimbursement

Issue in raising new reimbursement

Problem in approving reimbursement request

Issue in tracking status of reimbursement request o Earned Leave Encashment

Problem in raising new encashment request

(12)

TCS Confidential 12

Unable to track status of existing request o Processing of LTC Request

Unable to raise LTC Request

Problem in approving LTC Request

Unable to track existing LTC request o Processing of Bills

Unable to raise new Request

Problem in approving raised Request

Unable to track existing request o Medical Bills Reinbursement

Issue in raising new reimbursement

Problem in approving reimbursement request

Issue in tracking status of reimbursement request o Cessation of Service

Issue in initiating Resignation

Problem in approving Resignation

Issue in generating Reports on Exit Statistics o Processing of Promotion

Issue in initiating Promotion

Problem in approving Promotion o Monitoring of Vacant Posts & recruitment

Unable to initiate new Vacancies

Unable to Add Selected Candidates

Unable to generate Recruitment Reports o Processing of Deputations

Unable to initiate new Vacancy for Deputation

Unable to Nominate for Deputation

Unable to Generate reports on Deputation o Processing of Transfers

Unable to initiate new Vacancy for Deputation

Unable to Nominate for Deputation

Unable to Generate reports on Deputation o Processing of Pension

Unable to raise Pension request

(13)

o Processing of Additional Pay

Unable to raise Additional pay request

Unable to approve Additional pay request

Unable to generate Report on Additional Pay requests o Annual Pay Increments

Unable to initate Regular pay increment

Unable to access Regular Pay increment Reports o Pay Fixation - On Promotions

Unable to initate Pay Fixation

Unable to generate Pay Fixation Reports o Probation & Appointment

Unable to initiate new Confirmation Request

Unable to approve Confirmation Request

Unable to generate reports on Probation & Confirmation o GPF

Unable to initiate GPF Withdrawal Request

Unable to approve GPF Withdrawal Request

Issue in tracking status of GPF Withdrawal Request o Framing of Bills or Amendments in the legislative assembly

Issue in raising new Amend Act

Issue in approving Amend Act o Processing of Audit Para

Unable initiate Audit Para

Unable to generate Audit Para Report o Departmental Enquiry

Issue in raising Preliminary Enquiry

Unable to issue charge sheet

Unable to initiate Departmental Enquiry

Unable to add Hearing Details

Unable to add Enquiry Comments

Unable to submit appeal

Unable to add Allegation Details

Issue in generating Departmental Enquiry Report o Vigilance Enquiry

(14)

TCS Confidential 14

Issue in initiating Vigilance Enquiry

Issue in generating Vigilance Enuiry Reports o Land Acquisition

Issue in raising Land Acquisition Request

Unable to generate Land Acquisition reports o Hiring of Buildings

Problem in initiating Hiring of Building Request

Problem in filing Hiring of Building Tender

Infrastructure Support

o Desktop related Issue o Printer related Issue o Scanner related Issue o UPS related Issue

o Connectivity related Issue

General Issues

o Application page not getting displayed

o Password Related Issues ( Locked / Forgot Password )

o User Login ID related issues ( Forgot ID / User-ID not created) o Access Permission Issues

(15)

4. eSarkar Helpdesk Support Levels

The eSarkar Help Desk supports levels are follows:

Level 1 Support: This is the initial Level 1 Support responsible to gather the user’s information and will raise the incident in the system and provide the Incident Number to the user and forwarded it to Level 2 Support Person apart from General Issues

mentioned in “Section 3”.

Level 2 Support: This is a more in-depth technical support level than Level 1 and more experienced and knowledgeable on a particular Incident areas or service. Level 2 is responsible for handling the difficult or advanced problems, back-end support, and development of solutions to new or unknown issues. If Level 2 Support Person requires more information to close or resolve the issue, they will call to the respective user for necessary information. After getting the same, Level 2 supports troubleshoot the issue and find a solution.

Level 3 Support: This is the highest level of support in a three-tiered support model responsible for handling the most difficult or advanced problems. Level 3 is responsible to track incidents even when they are being actioned by a Level 1 & 2 Support and also responsible to monitor Service Level Agreement (SLA).

(16)

TCS Confidential 16

5. eSarkar Helpdesk Process

• User will call Helpdesk Toll Free number and will provide the below mentioned detail: o User ID o Name o Phone No o Email ID o Department o Location,

o Incident Area/Sub Area, o Issue Description

• The Call will be received at Helpdesk (L1 Support Level). The Support Person will raise the incident in the system and provide the incident no to the user.

• Apart from General Issues mentioned in “Section 3”, all other incidents will be forwarded to Level 2 Support Person.

• If immediate assistance cannot be obtained from the Help Desk (Level 1 Support), the person will endeavor to forward their request/indent or query to the appropriate person or group (Level 2 Support).

• Level 2 Support Person will resolve the issue and intimate to the user by email. Or

• If Level 2 Support Person requires more information to close or resolve the issue, they will call the respective user for further information. After getting the required information, Level 2 support Person will resolve the issue and intimate to the user by email.

Or

• If Level 2 Support Person unable to resolve the issue, the staff will endeavor to forward the request/indent or query to the appropriate person or group (Level 3 Support).

• Level 3 supports will take appropriate action and update the same to the user by email.

References

Related documents

The standard states: In any workplace where respirators are necessary to protect the health of the employee or whenever respirators are required by the employer, the employer

Differences among nonmedical prescription stimulant users and student characteristics (race, gender, academic performance (GPA), living arrangement, alcohol and other drug usage,

In according to high survival time for compoglass comparison with composite resin and glass-ionomer in present study, it can be a suitable material for anterior

복잡한 직무수행 현장에서 일어나는 도덕적 사태들을 제대로 인 식(지각)한 후 바람직한 해결방안을 추론하여, 이를 실제 행동으 로 옮길 수 있는 능력을 배양하기

To determine the physical condition abilities of taekwondo athlete who was training at a special preparation stage, it was measured: ability of leg muscles strength with

Paper presented at 2011 Annual National Conference of the Midwest Political Science Association, Chicago, IL, March 31-April 3.. Cho, Yoon Jik., and Lewis,

Data sources used in the model, including electronic retrieval locations; comparison of posterior and prior distributions for the washing model, rinsing model, and microbial

Penggenangan dilakukan selama 14 hari pada semua taraf perlakuan dengan cara memberikan air ke dalam masing- masing polybag sebanyak konsentrasi yang telah