Presto: Cost management for construction From the cost manager point of view

P

RESTO

:

C

OST MANAGEMENT FOR CONSTRUCTION

Successful projects

T4 Barajas Airport, Madrid, Spain AVE Alta Velocidad española

(2)

Presto: Cost management for construction From the cost manager point of view

P

RESTO

Cost management in different stages

Estimate

Instead of Excel

 Integrated with BIM and other construction software

Planning

 From the PM and contractor viewpoints

 Integrated with time planning software

Execution

 Integrating data from all the agents

(3)

Presto: Cost management for construction From the cost manager point of view

P

RESTO

Cost management for all the agents involved in construction

Supporting their different needs

The project team needs a powerful estimation system

Planners need to analyze cost, resources and financing

The contractor needs a system controlling both income and cost

The project manager needs to integrate data from all others and

manage changes

(4)

Presto: Cost management for construction From the cost manager point of view

G

LOBAL BENEFITS OF USING

P

RESTO

Construction specific software

Structured information system

Predefined by design

Flexible for display and delivery of information

No underground computing

 Professionals focus in the core business, not in programming.

 Excel is used for information output, not for data input

 Quick start, no implementation is required

(5)

Presto: Cost management for construction From the cost manager point of view

P

RESTO IN THE ESTIMATE STAGE

Flexible Cost WBS (CBS)

CBS elements share a common structure:

 Divisions: MasterFormat, Uniformat or any other

 Work units: custom or from price databases

 Resources breakdown: any number of labor, equipment, materials

and other components

CBS may match or not the planning WBS

Direct site, home and profit overheads and specific percentages for work units

(6)

Presto: Cost management for construction From the cost manager point of view

P

RESTO IN THE ESTIMATE STAGE

Oriented to information re-use and exchange

A single format allows data exchange in any direction

 Price databases

 Products catalogues

 Estimate and planning

 Cost control

Work units may be re-used between estimates

 Based on the (open) coding system

 With unit prices and rates

(7)

Presto: Cost management for construction From the cost manager point of view

BIM

INTEGRATION

:

R

EVIT

,

A

LLPLAN

,

A

RCHI

CAD

Quantities, location and cost relevant data is retrieved from the model even if no special action is performed by the project team

 Catalogues in BIM format for the easy selection of work units

 Data may be checked before being added to the estimate

 Optional feed-back from the estimate to the model

 Selected estimate elements are displayed in the model

Estimate and model may evolve at the same time

 Changes, additions and deletions between successive data

versions are detected

(8)

Presto: Cost management for construction From the cost manager point of view

O

PEN INFORMATION SYSTEM

One source, multiple outputs

Once information is in Presto, it may be exported in any format

 Open, customizable report system, Access style

 Printer, PDF, TXT or RTF printing of any report

 Excel: full estimate or specific windows export

 Inserts data in Excel or Word predefined templates

 Full export and import to/from Microsoft Access

 WBS and resources output in Primavera XML format

Presto files may be created from Excel files, GAEB XML, BC3 and other national formats.

(9)

Presto: Cost management for construction From the cost manager point of view

P

RESTO IN THE PLANNING STAGE

From the PM viewpoint

Three dimensional matrix estimate

 CBS (divisions and work units)

 Activities (areas, sectors, sections, levels, tasks...)

 Financial periods (months)

Cost planning (by financial periods)

 Convert from Primavera activities and dates

 Quick planning by "S" curves

 Financial planning

(10)

Presto: Cost management for construction From the cost manager point of view

P

RESTO IN THE PLANNING STAGE

Financial planning

(11)

Presto: Cost management for construction From the cost manager point of view

P

RESTO IN THE PLANNING STAGE

From the contractor viewpoint

Cost and income analysis

 Unit cost (standard rates and price databases)

 Operational estimating (first principles)

 Overheads

Tendering and planning

 Resources by dates, financial periods and cost centers

 Manpower and equipment analysis

(12)

Presto: Cost management for construction From the cost manager point of view

P

RESTO IN THE PLANNING STAGE

(13)

Presto: Cost management for construction From the cost manager point of view

P

RESTO IN THE CONSTRUCTION STAGE

Income and cost tracking

Payment Certificates for public and private clients Tracking models

 Planning, construction and certification by financial periods

 Cost tracking by "S" curve patterns

 EVM Earned Value Management

Process management

 Controlled exchange of information between agents

(14)

Presto: Cost management for construction From the cost manager point of view

E

ARNED

V

ALUE

M

ANAGEMENT

A formal methodology for monitoring deviations

Actual work valued at estimated cost

 EV / Actual Cost = Cost Performance

 EV / Planned Value = Schedule Performance

Accurate estimation of current progress, cost and time at completion

 Predefined, common terminology for all the agents

 Independent of bar chart planning

(15)

Presto: Cost management for construction From the cost manager point of view

E

ARNED

V

ALUE

M

ANAGEMENT

(16)

Presto: Cost management for construction From the cost manager point of view

E

CONOMIC MODEL FOR CONSTRUCTION

Price Quantity Estimate Contract price Target Expected cost Execution Actual cost Estimate Project Estimate Certificated PM approved Certification Target Revised project

Total production Initial target

BAC

Project cost EAC

Planning

Target to date

Planned production Planned value PV

Execution

Real quantity

Actual production Earned value EV

Actual cost AC

(17)

Presto: Cost management for construction From the cost manager point of view

P

RESTO FOR THE END CLIENT

Presto advantage for the Client is obtaining accurate and verified information

 Easy to understand information system (Presto and Excel)

 Display of initial estimate, approved changes, variation orders

 Standard methodology

 Quick start-up

(18)

Presto: Cost management for construction From the cost manager point of view

+45.000

USERS IN

+20

COUNTRIES

Designed for local users in a global environment

Easy to localize

 Multi-language reports

 Multi-currency

 Translation of estimates via Google

 Online training

References

Related documents

Gene structure and mutations of glutaryl-coenzyme A dehydrogenase: impaired association of enzyme subunits that is due to an A421V substitution causes glutaric acidemia

According to the Hanafi school, the punishment for theft cannot be inflicted unless the value of the stolen property is ten dirhams or more... On the other

While each street vendor attested to having different experiences while working in Sanjingwuwei's streets, the right to work in public space featured prominently in their

Miscelatore monocomando mono acqua per lavello, con bocca alta girevole, tipo lusso, modello corto. Single-lever single-water one-hole sink mixer, with high movable spout,

Huge student balcony overlooking the beach 70–100 students Great activity: Surfi ng 15 classrooms Town Hall Station Rooftop terrace and café 100–150 students. Great activity:

Our goal is not simply to sell your house, but rather to help realize the best price obtainable for your property in the shortest period of time.. To help achieve this goal we

4.2.3.1 Average Hop count per route in scenario 3 with wormhole attack and applied proposed Algorithm.

Burkhard and Brass (1990) found that the degree of centrality of an organization is a source of power for the particular organizations. The authors concluded that the more