This presentation may contain forward-looking statements, Such statements are not statements of historical facts but reflect the beliefs and expectations of our management and may constitute forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the U,S, Securities and Exchange Act of 1934, as amended, The words “believe,” “may,” “will,” “estimate,” “continue,” “anticipate,” “intend,” “expect” and similar words are intended to identify these statements, which necessarily involve known and unknown risks and uncertainties, Known risks and uncertainties include but are not limited to general economic, regulatory, political and business conditions in Brazil and abroad, interest rate fluctuations, inflation and the value of the real, changes in volumes and patterns of customer electricity usage, competitive conditions, our level of debt, the likelihood that we will receive payment in connection with accounts receivable, changes in rainfall and the water levels in the reservoirs used to run our hydroelectric facilities, our financing and capital expenditure plans, existing and future governmental regulation and other risks described in our registration statement and other filings with the United States Securities and Exchange Commission, Forward-looking statements speak only as of the date they are made and we do not undertake any obligation to update them in light of new information or future developments.

(3)

General Information

Construction and Investment Plan

(4)
(5)

Eletrobras

• Generation

• Transmission

• Distribution

• Commercialization

Largest electric power

company in Latin

America

• Light for All - Luz para Todos • Energy Conservation - Procel • Alternative Sources- Proinfa

Implementing and

Managing Social

Programs and

Sectorial

•Fuel Consumption Account - CCC •Global Reversion Reserve - RGR •Energy Development Account- CDE

Fund Management

(6)

The Eletrobras

Publicly traded Holding

• Focus on results

• Shareholders Remuneration;

• Transparency and governance

Our vision

• To be the largest global corporate system of clean energy, with a

return comparable to the best companies in the electricity sector,

by 2020

Our Values

• Focus on results

• Entrepreneurship and innovation

• Commitment to people

• Ethics and Transparency

(7)
(8)

Eletrobras Installed Capacity

Furnas Chesf Eletronorte Itaipu Eletronuclear CGTEE Amazonas TotalMW

Own investments (MW) 9,624 10,615 9,173 7,000 1,990 490 2,148 41,040

SPEs (MW) 689 12 701

Physical Aggregation

1st Half 2011 - - - - - 350 - 350

Total 10,313 10,615 9,185 7,000 1,990 840 2,148 42,091

42.1 GW in operation – 36.8% of the Brazil’s installed capacity

Total Installed Capacity (MW) Candiota III 350 Physical Aggregation in 2011 Hydroeletric 84.6%

Oil and Gas= 8.7% Coal = 2.0%

Nuclear = 4.7%

(9)

Generation – Under Construction

Santo Antonio 3,150 MW Dez-11 Jirau 3,750 MW Mar-12 Mauá 361 MW Mar-12 Passo São João

77 MW Jan-12 João Borges 19.5 MW Mar-12 Simplício 333.7 MW Out-11 Angra 3 1,405 MW Dez-15 Dardanelos 261 MW 2011 São Domingos 48 MW Fev-12 Batalha 52.5 MW Mai-13

Cerro Chato I, II e III 90 MW

Mangue Seco II 26 MW Miassaba 3 50.4 MW

Rei dos Ventos 1 e 3 97.2 MW

Casa Nova 180 MW

Pedra Branca, São Pedro do Lago e Sete Gameleiras

90.0 MW

Source : Eletrobras – RIG – April/2011

Belo Monte 11,233 MW Fev-15

Barra do Rio Chapéu 15.15 MW Mar-12 Megawatt Solar 1 MW Dez - 11 Eletrobras 10,860 MW R$ Billion 20,157 MW - 62.00 1,405 MW - 9.95 530 MW - 2.46 1 MW - 0.01 Total 22,092 MW - 74.41 HEU Concession 12,706 MW * * Due by 2015 04

(10)

Generation – Basic Studies and Projects

6 Projects 889 MW

Source : Eletrobras – RIG – April/2011

4 Projects 566 MW 1 Project 1,328 MW 9Projects 14,042 MW 2 Projects 596 MW 3 Pojects 311 MW 1 Project 134 MW 1Project 350 MW 2 Projects 151 MW Solar Thermal 1 MW – Dez/2013 1,294 MW 3.09 17,073 MW 57.92 18,367 MW 61.01 R$ Bi Basic Project Feasibility Study Inventory Study Total Main Projects S. Luiz do Tapajós PA 6,133 MW 20.09 Bi Jatobá PA 2,338 MW 8.70 Bi Marabá PA 2,160 MW 4.75 Bi

Serra Quebrada MA/TO 1,328 MW 3.98 Bi

Jamanxim PA 881 MW 2.17 Bi

Cachoeira do Caí PA 802 MW 2,24 Bi

TOTAL 13,642 MW 41.93 Bi

(11)

Furnas Chesf Eletronorte Eletrosul Amazonas TotalKm Own Investments (Km) 17,050 17,914 8,726 8,096 365 52,306 SPEs (Km) 124 351 552 634 1,661 Physical Aggregation 1st Half 2011 (Km) - -Physical Aggregation 1st Half 2011 – SPEs (Km) - - - -Total 17,174 18,265 9,278 8,730 365 53,812

Eletrobras Transmission Lines

750Kv; 5% 600Kv; 3% 525/500 Kv; 32% 345 Kv; 12% 230 Kv; 48% 53,812Km – approximately 55.0% of Brazil's transmission lines with

voltage ≥ 230KV

(12)

Eletrobras Transmission Lines – Main projects

In

Partnership ParticipatingFully Total Investment: R$ 11.19 billion Allowed Annual Return (RAP): R$ 1.08 billion 8,470Km 17 enterprises associated TLs + SSs 1,4380Km 15 enterprises associated TLs + SSs 9,908 km 3,780 MVA 2,143 MVA 5,923 MVA TL = Transmission Line and SS = Substation

(13)

Eletrobras System Distribution Companies

10%

9%

22%

34%

23%

2%

Extension of Distribution Lines

Description Unit Acre Amazonas Alagoas Piauí Rondônia Roraima Total Realized in2011 Extension of

distribution lines km 16,040 15,180 34,800 54,353 37,000 2,727 160,100 7,604

No. of Clients clients 201,771 709,229 877,392 949,436 482,515 82,682 3,303,025 98,995

No. of served cities cities 22 62 102 224 52 1 463 0

No. of substations Substations 12 44 37 70 53 3 219 1

6%

21%

27%

29%

15%

2%

No. of Clients

Acre Amazonas Alagoas Piauí Rondônia Roraima 8
(14)

Energy Sold – 1st Semester 2011 - GWh

ITAIPU FURNAS CHESF ELETRONORTE ELETROSUL CGTEE TOTAL 45,519 27,242 29,308 24,691 312 2,218 129,290 38,928 27,493 29,081 28,162 158 1,982 125,804 AMAZONAS

ENERGIA DISTRIBUIÇÃO PIAUÍ DISTRIBUIÇÃO ALAGOAS DISTRIBUIÇÃO ACRE DISTRIBUIÇÃO RORAIMA DISTRIBUIÇÃO RONDÔNIA TOTAL

2,249 1,060 1,273 331 234 1,034 6,181 2,337 1,081 1,350 177 249 1,110 6,304 2011 2010 Energia 09

(15)

Projects under Evaluation by Eletrobras

Uruguai Peru Nicarágua HEU l Garabi Binational 2,000 MW HEU TUMARÍN 253 MW 4 HEUs 7,700 MW HEU INAMBARI 2,600 MW Panamá Argentina TL 500 kV 60 Km/BR (390 Km) TL 400/800kV 1,400 km Moçambique MONTEVIDEU OFFICE PANAMA OFFICE LIMA OFFICE Source: Eletrobras ACQUISITION OF SHARES Business

Plan Feasibility Study Offices

abroad

Pre-Feasibility Study

(16)
(17)

Prioritization of international operations in the Americas, in

the development of renewable sources of energy generation

and transmission of electricity

Development and implementation of projects, as well as

acquisitions which will accelerate entry into targeted markets

and/or establish partnerships or strategic positioning in these

markets

Strategy of asset portfolio in the international markets

(18)
(19)

Operational Action Plans of

each company

Business Plan execution

Strategic Plan of the Eletrobras System

Business PlanManagement Plan Generation Goals Distribution Goals Transmission Goals Trading Goals

Negotiating Process of the Parent Company and its subsidiaries

CMDE between parent company and subs

Variable Remuneratrion Mechanisms

Adjmts

Breakdown of economic and financial guidelines for each company of the Eletrobras System

(Investment limits, debt capacity, capital cost)

Business Plan for each Company (initial version)

Parent Company and its guidelines

Business Plan for each Company (final version)

Consolidated Business Plan of the Eletrobras System

M oni tor ing E v a lua ti on Management Goal M oni tor ing E v al uat ion Adjtms

Development of the Business Plan in each Company

Planning and Management of the Eletrobras System

(20)

Management Model

-

Integration of the Planning and Management Process of the

Eletrobras System

-

Readjustment of the organizational structure of the Parent Company;

-

Implementation of the Integrated Management Risk Policy ;

-

Improvement of the integration of Information Technology of the

Eletrobras System;

-

Improvement of logistic and supply process of the Eletrobras System;

-

Implementation of shared service centers;

-

Communication integration and brand management;

- Transparency in sectoral fund management and government programs.

(21)

Human Resources

Retirement Program;

Performance evaluation;

Employee mobility;

Management of skills and competence.

(22)

R & D + I

- Consolidate, enhance and integrate mechanisms

for identification, analysis, proposition and

implementation of projects in R & D + I.

(23)

Operation

Improvement plan, enhancement and adjustment

of electrical grid of the Eletrobras system;

Project “Positive Energy” for the distribution

companies of the Eletrobras System.