• No results found

Advanced Technology Services

N/A
N/A
Protected

Academic year: 2021

Share "Advanced Technology Services"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)
(2)

Table of Contents

S.#

Index

Page

1 The Company 3 2 Core Values 3 3 CEO’s Message 4 4 Company Registrations 5 5 Distributions - Dealerships 6 6 Organization Structure 7

7 Project Management – Quality Control 8

8 Quality Procedures 8

9 Trainings & Team Programs 9

10 Major Client List 10

11 Major Projects 11

(3)

The Company

Core Values

Advanced Technology Services (ATS) is a sole proprietorship company, Established in 1995, registered with Pakistan Engineering Council (PEC), Karachi Chamber of Commerce & Industry (KCC&I) & Federal Board of Revenue (FBR), having its Head Office at 1/6-A, Block-6, PECHS, Main Shahrah-E-Faisal, Nursery, Karachi.

A Service Provider and General Order Supplier in the fields of HVAC, Electrical, Electronics, Mechanical, Telecommunication & Civil works.

Another sister concern named M/s. 5 Star Engineering Services is also working in Southern, Central & Northern areas of the country.

• ATS will nurture long term relationship with our customer.

• ATS will deliver innovative services that will contribute to our customer’s success.

• ATS will observe world class services culture being predominantly a service based organization.

• ATS will invest in our people to create loyal, long –team employees and encourage them to balance their professional and personal lives.

• ATS will provide growth opportunities to our employees in career path and will be an Equal Opportunity Employer (EOE).

• Above all, ATS will foster a culture of creativity, learning, caring and belonging and will be a fun place to work.

(4)

CEO’s Message

Since last many years our company is working in the field of IT telecommunication, HVAC (Heating Ventilation Air – Conditioning), Diesel Gas + Power Generations, Electrical & Mechanical, Civil works, Site survey and site preparations, repairing and maintenance work and have successfully completed many mega projects for our reputed customers. We are not only services provider but also facilitate our customer to procure best quality products with competitive rates from the market.

We believe on the ethical business working relationship and our core objective is to get the customers satisfaction and we also believe on healthy competition, we facilitate our customers with our best offered services through skilled work force. Thanking you,

Muhammad Haroon

Chief Executive

(5)

Company Registrations

National Income Tax

General Sales Tax

Pakistan Engineering Council

Chamber of Commerce & Industry

Alcatel Lucent Pakistan Limited

Zhongxing Telecom Pakistan (PVT) Limited

Pakistan Telecommunication Company Limited

National Telecommunication Corporation

Huawei Technologies Pakistan (Pvt) Limited

China Mobile Pakistan Limited (ZONG)

(6)

Distributions/Dealerships

S. A. Brothers (Pvt) Limited SABRO Air conditioners Cool Industries Pvt Ltd Waves Air-Conditioners MIA Corporation (Pvt) Limited ACSON, McQuay & CITEC Mab Fire Protection (Pvt) LTD., Fire Fighting, Marine

Equipment

Alcom International Purafil Air Purification Products

(7)

Organization Structure

CEO

GM

Marketing Admin

Store

Purchase Quality Operation Finance

Electrical Mechanical HVAC Telecom Civil

Teams

Teams Teams Teams Teams Teams

Teams

(8)

Project Management / Quality Control

Quality Procedures

• The main task is to complete the project in a given time period and this always be our top most priority in every project.

• During the whole project work, Quality Control Manager always be with Project Manager to ensure that the project works have been completed in accordance with customer requirement & with Quality materials.

• We always give importance to the safety & security of men & equipments in every project.

After complete of hardware/software installation, supervisor test out his Quality of work according to given standard, then quality control engineer makes his satisfaction and call to quality control manager for site visit quality control manager for site visit quality control manager makes sure quality of work according to standard and invite to the customer.

To encourage employees, company gives appreciation letters and incentive to employ son their excellent quality work.

Quality Check Customer Supervisor Quality Assurance Engineer Quality Assurance Manager

(9)

Trainings & Team Programs

The Challenges of today’s markets can only be masters through and with skilled highly motivated personnel.

Thus we strive to keep our high level standard by:

• Having deputed a team organization. We have “product teams” and “project teams” which coordinate every aspect of a project.

Each of these teams consists of specialists.

• Advance Technology Services periodically range employees training programs which include theory classes, onsite training, and overseas training in collaboration with Huawei, Alcatel, and other reputed companies.

• Frequent and regular training, i.e. computer and technical training, let us utilize modern technologies and serve our customers faster and better. • Advance Technology Services also provides opportunities to the students

of reputed institutions and universities to gain practical knowledge & experience in the fields of telecommunication, Electrical, HVAC and mechanical through providing literatures, theory classes and on-site training by our engineers,

(10)

Major Client List

Sr. # Client Number of

Projects

1. Pakistan Telecommunication Company Limited (PTCL) 23

2. PTCL-Development 10

3. PTCL ITMC, NOSSR, OFS-I & II 52

4. PTCL BNCC & ERP Data Center 03

5. PTCL Call Center 21

6. Alcatel-Lucent Pakistan Limited 01

7. ZTE Pakistan Limited 08

8. Huawei Technologies Pakistan Limited 25

9. China Mobile Pakistan Limited – CMPak (ZONG) 02

10. Shaheen Air International (SAI) 01

11. Chevron Pakistan Limited (Caltex) 11

12. National Telecommunication Corporation (NTC) 26

13. Defense Housing Society (DHA) 03

14. Institute of Business Administration (IBA) 01

15. State Bank of Pakistan 13

16. Pakistan International Airlines (PIA) 17

17. Beach Luxury Hotel 08

18. Avari Hotel 02

19. Baluchistan Glass Limited 04

20. Anglo Pak Limited 02

21. Beacham Laboratories Pakistan Limited 07

22. Ali Gohar & Company 01

23. Glaxo Welcome Pakistan 04

24. Askari Commercial Bank Limited 02

25. United Bank Limited 05

(11)

Major Projects

Sr.# Project Name Client Year Sites

1. PTCL WLL CDMA Phase-II Project Huawei 2004 110

2. PTCL OFAN Phase-II Project Huawei 2005 633

3. PTCL HCTE/NGN Expansion Project Huawei 2005 18

4. CMPak BTS Equipment Installation Project Alcatel 2007 43

5. PTCL HCTE/NGN Project Huawei 2007 12

6. Ground Earthing System Installation Huawei 2007 36

7. PTCL 1462 & 1465 SDH Project ZTE 2007 24

8. PTCL MMBB DSLAM Power PTCL 2008 45

9. PTCL CDMA WLL WTR Expansion Project ZTE 2008 14

10. PTCL 100K DSLAM Project ZTE 2008 43

11. IBA HVAC System Installation & Commissioning IBA 2009 01

12. PTCL MMBB Site Preparation PTCL 2009 51

13. PTCL AC Units Installation IMEWE Hawksbay PTCL-Dev 2009 01

14. PTCL 100KDSLAM VTB Replacement Project ZTE 2009 125

15. CMPak Force Ventilation System Project CMPak 2010 50

16. PTCL Uplifting of CTH/CTO Building PTCL 2010 01

17. PTCL Metro Ethernet AC Installation Project PTCL-Dev 2010 11

18. PTCL NGN C5 Power Project PTCL 2011 52

19. PTCL MSAC AC Installation Project PTCL-Dev 2011 13

(12)

Contact Us

Head Office

Banglow # 1/6-A,Block-6, PECHS, Main Shahrah-e-Faisal, Karachi. Tel: +92-21-34315671-3, Fax: +92-21-34315675 URL: www.atspk.com Email: [email protected] Islamabad Warehouse

House # 384, Mehboob Lane, Fazalabad Near Deawoo Bus Stand, Rawalpindi. URL: www.atspk.com Email: [email protected] Future Planned • Lahore • Faisalabad • Multan • Peshawer • Sukkur • Quetta

References

Related documents

Hoem and Nedoluzhko (2008) presented such a model, but it also reveals no disruptive effect. Modeling of the first conception, however, has a serious shortcoming as it cuts off

Coupon tests show that old and reused struts do not diminish in strength over the years (it means old struts can.. continue to be reused, if their thicknesses are not eroded due

motivation from both parents and teachers was the cause of less participation of students in class, Lack of confidence also discouraged students to participate in class,

For the European Union, both the IT3SLS and ITSUR estimates indicate the Asian product to be the most price elastic, followed by the rest of the world and South American shrimp,

An investor in cross-border security-based swaps who is located in the United States—and who, as a result of the economic reality test, would likely not be able to bring a claim

The risk is here presented ranging from simulation results to risk levels from low to extreme risk, depending on temperature and smoke concentration at different tunnel

predator-related risk treatments; see supplementary materials (Appendix 1, Fig.  S1 ) for a conceptual graphical design: I) Risk-free level (FF0), the aphid alone treatment, where

40, City of Palmdale, Palmdale Water District, Littlerock Creek Irrigation District, Palm Ranch Irrigation District, Quartz Hill Water District, California Water