Smart Energy made in Germany
2
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
solar wind geothermal biomass gas oil coal nuclear water
decentral
& volatile
Key Challenges in Energy
triangle
of hope
4
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
Linking all Components of a Smart Power
System
Smart Generation
Smart Grid
Smart Consumption
Smart Storage
6
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
Key Driver 2: New Business Scenarios
Energy
Supplier
Energy Supplier
plus
E-Energy is changing the landscape
E-Energy on a Glance
Dr. Angela Merkel at IT-Summit: „beacon project“
6 pilot regions
140 Mio. EUR public and private funds
result of technology competition
runtime 2008 - 2013
Research and Demonstration
Ancillary research
evaluation and coordination
task forces for cross cutting topics
national and international cooperation
Activities in Pilot Regions
Developing and testing hardware and software for an
Internet of Energies
Gaining knowhow on interoperability, safety and security
Testing models of added value generation and business
processes
Analyzing market potentials and improving consumers
acceptance
12
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
E-Energy Ancillary
Research Group
B.A.U.M. Consult GmbH, München / Berlin
TU München, Institut für Informatik
TU Darmstadt, Institut für Elektrische Energiesysteme
incowia GmbH, Ilmenau
LoeschHundLiepold Kommunikation GmbH, München
Smart Grids: the broad perspective
smart
grids
14
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
Smart Grid made in Germany
monitoring and control of energy grid operation
+ e-trading platforms for dynamic pricing, load shaving,
incorporation of virtual power plants, system services,
prognosis etc.
+ distributed multi-agent architectures to link all technical
and market elements
Major E-Energy Investigation Fields
system architecture
How to maintain a save and efficient energy system?
business cases
How to foster creative new business models?
cyber security
How to deal with 250 requirements?
privacy
How to avoid risks with smart architectures?
standards
How to ensure seamless access of a multitude of appliances in generation,
storage, distribution and consumption?
16
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
Many public and private stakeholders involved
EnBW Energie Baden-Württemberg AG, IBM, ABB, SAP,
Systemplan, University Karlsruhe
MVV Energie AG, IBM, Power PLUS Communications, Papendorf
Software Engineering, DREWAG, University Duisburg-Essen
RegenerativKraftwerk Harz GmbH & Co, Siemens, E.ON,
in.power, ISET, Vattenfall
EWE AG, OFFIS, energy & meteosystems, BTC,
Fraunhofer-Verbund Energie
RWE Energy AG, Siemens, Prosyst Software, Miele, ef.ruhr,
Stadtwerke Krefeld
Utilicount, Stadtwerke Aachen, Stadtwerke Duisburg, FIR at RWTH
specifics:
energy efficiency in the
integrated house incl. E-Car
instruments:
smart meters and StromRadar©
price incentives at the outlet
minimum emission certificates
central platform to control and run the system
lead partner:
EnBW Energie Baden-Württemberg AG
other partners
: IBM, ABB, SAP, Systemplan, University Karlsruhe
18
Model Region Rhein-Neckar
specifics:
cellular system with
tariffe incentives
instruments:
autonomous cells with agents
„agents“ and „energy butlers“
to manage objects
control devices connected via private IP-network
lead partner:
MVV Energie AG
other partners
: IBM, Power PLUS Communications, Papendorf
Software Engineering, DREWAG, University Duisburg-Essen
Model Region Harz
specifics:
many renewable energy plants
and hydropower storage station
instruments:
control system to guarantee
grid stability
prediction system for wind energy
new business model: bundling distributed
power generators
20
Model Region Aachen
specifics:
pricing signals, self regulating grid
instruments:
prognosis system and
optimization algorithms
to close the „last meter“
lead partner:
Utilicount
other partners
: Stadtwerke Aachen, FIR at RWTH Aachen, PSI
Büsing & Buchwald, Kellendonk Elektronik
Model Region Rhein-Ruhr
specifics:
cooperation of big supplier and
municipal utility; intelligent home
appliances; prosumer concept
instruments:
smart ICT gateways to move
step by step towards smartgrid
ICT for decentralized grid management
in distribution networks
lead partner:
RWE Energy AG
22
Model Region Cuxhaven
specifics:
Load management on distribution network
using big shiftable loads (cold stores)
instruments:
regional power portal to manage
business incentives
plug&play networking of appliances
online visualisation with iPhones
lead partner:
EWE AG
other partners
: OFFIS, energy & meteosystems,
BTC, Fraunhofer-Verbund Energie
Cross Cutting Work in E-Energy Taskforces
System Architecture
Interoperability
Legal Framework
Market Development
privacy?
data security?
standards?
market
roles?
24
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
First results (I)
1.
Smart grids concept is much
more than smart
metering
2.
Private homes react
on price incentives, but bigger and
quicker
gains are in B2B
solutions
3.
acceptance increases with degree of automation
4.
Decentralised data management
reduces bandwidth
constraints and allows for
high degree of privacy
5.
E-Energy market place helps to
improve existing
First results (II)
6.
Intelligent integration of
wind energy does not
jeopardize security of supply.
7.
Load management can
decrease need for grid
retrofitting
8.
Aggregators are key
to the integration of distributed
renewables.
9.
Legal framework
(incl. feed in tariffes)
should be adapted.
10.
Different innovation cycles
of energy and ICT business
must be tackled with modular systems.
26
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
Result of Cooperation: Layered Model
device level
object level
cell level
market
place
Steuerbox Energie-butler IKT Gateway 2 IKT Gateway1 Strom Radar Strom Ampel Zell-AgentenEnergy Name Service Energy Security Serv
ice WCMS Virtuelles Kraftwerk AS IA
Pool-Koordinator Tarifedyn.
dyn. Tarife
??? ???
Meter
Energy Data Management
Metering
Infrastructure
Consuming
Appliance
Consuming
Appliance
Producing
Appliance
Display
GatewayMeterSmart Energy System
28
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
Energy
Manager
Meter
Energy Data Management
Metering
Infrastructure
Consuming
Appliance
Consuming
Appliance
Producing
Appliance
Display
User Interface
Grid Operation
Meter GatewaySmart Metering
Smart Grid
Smart Home
Services
Energy
Manager
Meter
Prognosis
Energy Data Management
Metering
Infrastructure
Market Place
Consuming
Appliance
Aggregation
???
Consuming
Appliance
Producing
Appliance
Display
User Interface
Grid Operation
Meter Gateway EM GatewaySmart Metering
Smart Grid
Smart Home
30
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
Services
Meter
Prognosis
Energy Data Management
Metering
Infrastructure
Market Place
Consuming
Appliance
Aggregation
???
Consuming
Appliance
Producing
Appliance
Display
User Interface
Grid Operation
Meter Gateway EM GatewaySmart Metering
Smart Grid
Smart Home
Finding a Common View: Standardization
Study: “Standards for the Electric Smart Grid:
Findings for the German E-Energy program”
BDI brochure
E-Energy taskforce
Interoperability
available from
DKE / E-Energy Competence
Center:
Standards Roadmap
32
Ludwig Karg, Head of Ancillary Research for E-Energy and ICT for Electric Mobility Programs ISGAN Meeting, Roma, July 7, 2011
D-A-CH Cooperation on Smart Grids
all levels: governmental,
ancillary research, model
projects
exchange of knowledge
and prototypes (e. g.
joint test beds)
joint solutions for cross
cutting questions
(including standardization)
development of European