Strategic Human Resource Management and Corporate Performance
Full text
Figure
Related documents
In other words, shipments currently dispatched by each supplier are loaded together, possibly to FCL/FTL, in order to reduce the total transport cost.. Analyses
If you stick to single-projector PP’s (one potential per angular momentum l , i.e. one projector per l in the separable form), the choice of the electronic configuration au-
The Managerial Experience and Postgraduate University Training of School Principals: A Comparison of Two Post-Socialist Countries Using TIMSS 2015 and PIRLS 2016 Data
This exercise is similar to that of Ellison, Glaeser and Kerr (2007; 2010), who calculate coagglomeration between pairs of manufacturing industries for the US and run regressions
In particular, our contribution shows that a mechanism designer or principal does not necessarily benefit from new information if the agency problem at hand includes both moral
We compared trial and meta-analysis HRs from published AD with those from IPD, and found they were most likely to agree when both the absolute and relative information size (number
In this paper, we present a three-step approach that takes as input hashed public IP addresses in real-time bid requests and (1) creates a weighted heterogenous network, (2)
of lignocellulosic materials in a bioconversion process involving enzymatic hydrolysis followed by fermentation, pretreatment is required in order to break down