Page 1 of 13 Management Plan

Management Plan

Please describe the details of your project to the extent known. Consult the guidance document for further information on regulatory requirements, rational for why the information is required, and how to find required information.

The scope and the timing for response will be provided. If information is requested and not received, it may result in the disallowance of the application.

Information on these topics may be required as part of the application processing and if further detail is necessary that is not part of the application and management plan received, you will be contacted and requested to provide additional information. In some circumstances, the use of a qualified professional to complete the plan may be required.

1.0 Background

1.1 Project Overview

Describe project for which authorization is requested, including construction and/or phased development details:

This tenure application is intended for day use and multi-day camp based non-mechanized ski touring. All of the activities will be small groups, no more than five guests to one guide; and are designed to be low impact and the least intrusive to wildlife and other

recreational users as possible. Hurley Holdings has a deeply rooted respect for the environment, wildlife and public land use. We believe in conservation, education and preservation.

1.2 Investigative Work

If any preliminary investigative work has been carried out, with or without an investigative authorization, provide details on work completed, incomplete or on-going from previous term. Please provide comments on any archaeological work, new technology or any First Nations agreements undertaken.

Activity Brief Description of Activity Status (e.g. Complete,

incomplete, ongoing) Comments / Milestones Contact with local First Nations

has been attempted

Phone calls and emails have

(2)

Page 2 of 13 Management Plan

Activity Brief Description of Activity Status (e.g. Complete,

incomplete, ongoing) Comments / Milestones

We have talked with locals in Slocan and the surrounding area about our tenure application.

We have asked locals how they

feel about our proposal. ongoing

We have gotten mixed

responses. While the majority of the people with whom we have spoken support our proposal, we have encountered two people who have expressed discontent with it. One is a mechanized ski guide who believes the are should be protected and the other is a local backcountry enthusiast who doesn't want more commercial operations in the area.

The others are locals who support our proposal because we are locals who live in the area and want to create a sustainable living for our family, or are guides who would benefit from local employment.

Add Row

1.4 First Nations Consultation

Describe any contact you may have had, including the name of the First Nation(s) and representatives contacted including a description of any discussion of potential adverse effects from the proposed activity and any discussed mitigation measures.

(3)

Page 3 of 13 Management Plan

2.0 Location

2.1 Description

Provide a general description of the location of the project. Include activities such as traffic patterns and volume; parking; drilling and sampling etc.

The proposed tenure are is located in Robertson, Bannock Burn, South Bannock and Hoder Creeks. Currently, people use the Bannock Burn and Hoder Creek FSRs to access Valhalla Provincial Park both in the summer and winter for hiking, skiing and climbing. We feel our service will facilitate small groups carpooling to the trailheads, once the Covid pandemic is over; as well as foster and educational culture amongst our guests in LNT practices.

Hurley Holdings appreciates the need for local non-commercial recreation areas and will respect locals' desire for non-intensive use. We aim to run infrequent, low impact, small group, backcountry experiences and will be inclusive of locals who want to use the area. We will also offer free, local youth trips to help youth develop a better relationship with nature and backcountry safety. In the winter, we will help maintain snowmobile trails on the FSRs and maintain safe and well set skin tracks that will allow for safer public backcountry travel and access.

Currently Hurley Holdings employees ski, climb and hike in the proposed tenure area. While the summers have become busier over the past five years, there is still an extremely limited amount of winter use in the proposed tenure area. More often than not, we don't see ski tracks in it.

We estimate the amount of use we would bring into the tenure area would be around 30-50 guests per year, for a total of 90-150 user days per winter. That is based on a five year growth period. We are not looking to make this a full time winter operation; in fact we don't want to grow beyond those numbers as we want to be considerate of local recreational use.

Any overnight trips will be carried out in a LNT fashion, all human waste will be removed, including excrement and food waste. We understand the developing issue with the Gimli mountain goat herd and will not camp at the alpine campsite, if the goats are present. Currently, the exact location of their winter range is not know by local biologists.

2.2 Location Justification

Provide your reasons/justification of the need for this type of project at this location. For example, is the activity close to a main highway for truck access purposes; or adjacent to other examples of this use - ie. is the proposed marina close to an existing marina

While guided non mechanized backcountry skiing is still not cheap, it is more obtainable for a larger segment of the population than mechanized skiing. Hurley Holdings intends to offer free youth trips and locals' deals in order to be inclusive of local backcountry users. Backcountry recreation is exploding in popularity and there is a tremendous influx of new users. Education and guided backcountry experiences are necessary to help form responsible backcountry travel practices and decrease the number of accidents that will take places amongst the new user group.

This tenure application will also provide local employment for Hurley Holdings' employees and subcontractors; as well as create a positive economic contribution to the local economy with both the spin off of guest spending at local businesses and Hurley Holdings' employees having a living wage in the Slocan Valley.

The Slocan Valley is becoming a recreational destination and creating a positive, and ecologically minded tourism industry from the outset is a forward thinking approach. Hurley Holdings builds in carbon offset credits into the price of their trips. They also commit three percent of their profits to local agriculture and sustainable endeavors in the Slocan Valley.

2.3 Seasonal Expectations of Use

When will the Project require use of the land? Include information on key works during construction phases as well as operations phase and indicate seasons or full year activities. Please reference reduced risk fish windows as required by DFO:

(4)

Page 4 of 13 Management Plan

Project Phase (Construction / Operations) Brief Description of Activity / Works Season

Non-mechanized backcountry ski touring

Non-mechanized small group ski touring. Mainly day trips, with occasional two-three night tent based camps. We will use a maximum of four snowmobiles to get our groups into the field. Snowmobile use will be restricted to Forest Service Roads, there will be no off-road snowmobiling.

Winter operations mid Nov- early April

(5)

Page 5 of 13

Management Plan

3.0 Infrastructure and Improvements

3.1 Facilities and Infrastructure

Detail any new and existing facilities, infrastructure or processes proposed and any ancillary uses. Provide details of planned construction methods and materials, and construction scheduling.

Facility/Infrastructure/Process

Construction Methods/Materials

Construction Schedule

none

Add Field

3.2 Access

Identify existing and proposed roads used for access and their use by season. Include any proposed connections that require eit

her a Ministry of Transportation

and Infrastructure permit for connection or use of a Forest Service Road and what type of FS road and types of vehicles expect

ed. Include information on any

road use agreements and include the volume of traffic during construction/operation and phase or season that the traffic is exp

ected.

Roadway/Proposed

Connection

Existing/Proposed

Existing Road Classification

Road Permittee

Information and Road

Use Agreements Traffic Volume Construction Phase Operations Phase Mitigation of Traffic Effects Bannock Burn Existing FSR

Road use agreements are currently being investigated. Winter snowmobiles, 2-4 per every other week Proper FSR radio protocol, volunteer road maintenance/ clearing of downed trees, boulders. Carpooling and hi clearance 4x4 vehicles.

South Bannock

Existing

FSR

Road use agreements are currently being investigated. Winter snowmobiles, 2-4 per every other week

Snowmobiles in winter.

Hoder Creek

Existing

FSR

Road use agreements are currently being investigated. Winter snowmobiles, 2-4 per every other week Proper FSR radio protocol, volunteer road maintenance/ clearing of downed trees, boulders. Carpooling and hi clearance 4x4 vehicles.

(6)

Page 6 of 13

Management Plan

3.3 Utility Requirements and Sources

Describe utility requirements and sources, include agreements in place or underway allowing access to utilities. Utilities incl

ude power generation, electrical or gas

transmission or distribution lines, telecommunications. No utilities needed.

3.4 Water Supply

Identify water requirements for construction and operation phases (e.g. surface water and/or groundwater), including sources,

location, volume and a general

description of infrastructure planned to meet water supply requirements, include any agreements outside of Water Act Authorizat

ions, such as Municipal water

supply. Project Phase (Construction/

Operation)

Water Requirement (e.g. Surface water or ground

water, etc) Source/location Volume Infrastructure Description Agreements none none Add Field

3.5 Waste Collection Treatment and Disposal

Identify any waste disposal (note septic system required), sewage, sanitation facilities and refuse disposal proposed. Include

agreements in place or underway

(7)

Page 7 of 13

Management Plan

Project Phase (Construction/

Operation)

Is there a water requirement (e.g. Surface water or ground

water, etc)

Discharge distance to closest body of water (well, lake, etc.)

Volume of daily discharge

Infrastructure Description

Existing Agreements

none

none

none

Human waste will be carried out in a portable toilet. Food waste will also be removed.

(8)

Page 8 of 13 Management Plan

4.0 Environmental

Describe any significant impacts and proposed mitigation for the following environmental classes:

4.1 Land Impacts

4.1.1 Vegetation Removal

Is any timber removal required?

Yes No

Are any areas of vegetation to be cleared, outside of timber removal?

Yes No

4.1.2 Soil Disturbance

Will there be any areas of soil disturbance, including clearing, grubbing, excavation and levelling?

Yes No

Is the area to be excavated a Brownfield site or has the potential to be contaminated?

Yes No

Is there potential for disturbance of archaeological, paleontological fossils or historical artifacts?

Yes No

4.1.3 Riparian Encroachment

Will any works be completed within or adjacent to the riparian zone of any water body? If your project is within 30 meters of a watercourse and you intend to: disturb soil, remove plants, construct, install works for flood protection, develop drainage systems or service sewer or water systems the Riparian Areas Regulation may affect your development.

Yes No

4.1.4 Pesticides and Herbicides

Will there be any use of pesticides or herbicides during construction, operations and/or maintenance?

Yes No

4.1.5 Visual Impacts

Will there be any adverse effects of the projects, and any potential adverse effects on sight lines to the project area from surrounding areas likely to be used for scenic viewing by residents or other users?

(9)

Page 9 of 13 Management Plan

No

4.1.6 Archaeological Sites

Are there any known or high potential (Arch Procedure) archaeological sites within the project area?

Yes No

Have you conducted an AIA or engaged an archaeologist to assist with your investigations?

Yes No

4.1.7 Construction Methods and Materials

Identify the types of construction materials, the methods used, their impacts, and any mitigations:

Construction Material/Method Impacts Mitigations

none

Add Field

4.2 Atmospheric Impacts

4.2.1 Sound, Odor, Gas or Fuel Emissions

Will the project construction or operation cause any of the following to disturb wildlife or nearby residents:

Sound? Yes No

Explain the current conditions, source, type and range of emission. Provide a description of atmospheric effects from proposed construction, operation, and decommissioning phases. Also include proposed mitigation measures to manage or mitigate adverse effects.

Emission Source Current Conditions Project Impacts Proposed Mitigations /

Management

Snowmobiles

There is current snowmobile use in all of the proposed tenure area's valleys. There is also ongoing industrial clearcut logging in all of the valleys.

noise and carbon emmissions

Carbon offsets will be purchased for all of the user days. We are looking into electric snowmobiles and vehicles and would like to employ them ASAP.

Automobiles

There is current automobile use in all of the proposed tenure area's valleys. There is also ongoing industrial clearcut logging in all of the valleys.

noise and carbon emmissions

Carbon offsets will be purchased for all of the user days. We are looking into electric snowmobiles and vehicles and would like to employ them ASAP. Add Field

(10)

Page 10 of 13

Management Plan

Odor? Yes No

Gas? Yes No

Fuel Emissions? Yes No

Explain the current conditions, source, type and range of emission. Provide a description of atmospheric effects from proposed construction, operation, and decommissioning phases. Also include proposed mitigation measures to manage or mitigate adverse effects.

Emission Source Current Conditions Project Impacts Proposed Mitigations /

Management

Snowmobiles/automobiles

There is current automobile/ snowmobile use in all of the proposed tenure area's valleys. There is also ongoing industrial clearcut logging in all of the valleys.

noise and carbon emmissions

Carbon offsets will be purchased for all of the user days. We are looking into electric snowmobiles and vehicles and would like to employ them ASAP. Add Field

4.3 Aquatic Lands

4.3.1 Drainage Effects

Will the project result in changes to land drainage?

Yes No

4.3.2 Public Access

Will the project result in changes to public access?

Yes No

Describe the potential effect or impact and include plans for mitigation/management:

Effect Potential Impacts Proposed Mitigations / Management

Plan

Positive public impact

Increased public access through free youth tours and locals' deals. Professionally set skin tracks that would avoid avalanche hazard

exposure and would be open to public use.

Increased public access through free youth tours and locals' deals. Professionally set skin tracks that would avoid avalanche hazard

exposure and would be open to public use.

Add Field

4.3.3 Flood Potential

Will the project result in a potential for flooding?

(11)

Page 11 of 13

Management Plan

4.4 Fish and Wildlife Habitat

4.4.1 Disturbance to Fish/Wildlife and Fish/Wildlife Habitat

Will the project result in adverse effects to wildlife or wildlife habitat?

(BC Wildlife Act)

Yes No

Will the project (construction or operations phase) occur in and around streams, lakes, estuarine or marine environments?

Yes No

Is the project (construction or operations phase) likely to increase erosion or sedimentation?

Yes No

Will the project (construction or operations phase) require water diversion?

Yes No

Will the project threaten or endanger species at risk in the area?

Species At Risk Act

(12)

Page 12 of 13

Management Plan

5.0 Socio-Community

5.1 Land Use

Describe the current community setting on or near the project area, including the location of non-aboriginal and aboriginal communities or known use areas.

Slocan village and the Slocan Valley are rural areas that are transitioning from resource extraction communities to a more modern paradigm, where people work in a variety of fields and tourism is becoming a more powerful economic driver. This area is the unceded territory of the Sinixt People and we acknowledge their continued presence and existence here. We also acknowledge other First Nations may hold unceded claims to this area While we can not undo what has been done, we can try to foster a culture of understanding and respect for their traditional ways and lands, through education and respect for the beautiful area in which we live and operate.

Hurley Holdings intends to offer free youth trips and locals' deals in order to be inclusive of local backcountry users.

Backcountry recreation is exploding in popularity and there is a tremendous influx of new users. Education and guided backcountry experiences are necessary to help form responsible backcountry travel practices and decrease the number of accidents that will take places amongst the new user group.

This tenure application will also provide local employment for Hurley Holdings' employees and subcontractors, as well as create a positive economic contribution to the local economy with both the spin off of guest spending at local businesses and Hurley Holdings' employees having a living wage in the Slocan Valley. We intend to lodge our guests with local lodging businesses and will try to encourage them to support local businesses during their stay.

The Slocan Valley is becoming a recreational destination and creating a positive, and ecologically minded tourism industry from the outset is a forward thinking approach. Hurley Holdings builds in carbon offset credits into the price of their trips. They also commit three percent of their profits to local agriculture and sustainable endeavors in the Slocan Valley.

5.1.1 Land Management Plans and Regional Growth Strategies

Are there any land and resource management plans, coastal plans, provincial, regional growth strategies or local

government plans with zoning, or management policies or use restrictions in place that could limit or preclude your proposed use of the land? (Please refer to the Union of BC Municipalities (UBCM), and check the websites of the municipality, regional

district or other organization with jurisdiction including your project area.)

Yes No

5.2 Socio-Community Conditions

5.2.1 Adjacent Users or Communities

Is the project likely to restrict public access, or the ability, or the ability of adjacent land owners or tenure holder to access their property or tenures?

Yes No

5.2.2 Existing Services

Provide a description any increased demand on fire protection and other health facilities and emergency services arising from your Project, including proposed management or mitigation measures.

We have operational Wildlife Management, Risk Management, Safety and Avalanche Safety plans in place and use only fully certified ACMG guides for our trips We are professional risk managers and operate within the margins of our industry's operational risk band. We employ LNT principles and respect government health and safety regulations.

Our guides are certified wilderness first aid and are equipped with first aid kits when they are in the field. They also carry VHF radios and In-reach emergency communication devices. We operate with set check-in times and morning and evening guides' meetings, as well as daily avalanche forecasts.

(13)

Page 13 of 13

Management Plan

References

Related documents

For the open ocean the RSS retrieval product [Wentz and Meissner, 2007] for the atmospheric parameters of WSP, total water vapor, cloud liquid water and sea surface temperature

Jesus called the crowd with his disciples, and said to them, “If any want to become my followers, let them deny themselves and take up their cross and follow

2012– Mentoring committee, International Association of Relationships Research (IARR) 2012– Awards committee, International Association of Relationships Research (IARR) 2012–

Ini menunjukkan bahwa Orang Dengan HIV/AIDS (ODHA) yang diberikan hipno- terapi memiliki penurunan tingkat depresi, kecemasan dan stres yang lebih signifikan

As the growth of vocational institutions providing higher education is a major international development in the field of higher education (HE) (Trow, 2006) an- swering questions

Design of the dynamic monitoring test with the terrestrial radar interferometry with a real aperture antenna (TInRAR) technology: (a) picture of the IBIS-FS radar

Contractor, or Customer for a Self-Installation project, must provide an original signed Incentive Application Form, as well as a signed Site Access Agreement allowing access for

The distinctive advantages of NTS in including all major travel indicators, travel modes, and trip purposes, and the consistent approach used for survey design and data