Remove and replace in their entirety the Fee Forms with the attached Revisions:
Fee Form
Proposer must enter a fee for all items in each category. Fees must include all labor, parts, materials, supplies, overhead, profit etc. per Section 5.3.1.
.
Carpentry (Labor Cost to remove & replace, repair or install)
#1: 2 X 4 x 8 Stud wall per linear foot $
#2: 2 X 4 rafter or stud per linear foot $
#3: 2 X 6 rafter, stud or joist per linear foot $
#4: 2 X 8 rafter or joist per linear foot $
#5: Plywood/OSB (3/4”) subfloor per square foot $
#6: Cabinets per liner foot $
#7: Counter tops per liner foot $
#8: Interior trim and baseboards per linear foot $
#9: Exterior trim & fascia per linear foot $
#10: Remove & replace windows $
#11: Remove & replace exterior door w/frame $
#12: Remove & replace exterior door w/frame $
#13: Remove & replace exterior door only $
#14: Remove & replace interior door only $
#15: Remove & replace exterior door frame only $ #16: Remove & replace exterior door frame only $
#17: Install fiberglass bat insulation, per square foot $
#18: Remove & replace single pane window glass only $ #19: Remove & replace double pane window glass only $
Plumbing (Labor Cost to remove & replace, repair or install)
#1: Kitchen sink, each $
#2: Kitchen Faucet with/without spray, each $
#3: Bathroom sink, each $
#4: Bathroom faucet, each $
#5: Commode complete, each $
#6: Flush valve and flapper, each $
#7: Tank with new valve & flapper, each $
#8: Flexible water supply line to sink or commode, each $
#9: Supply stop ¼ turn ball valve type, each $
#10: New faucet cartridge, each $
#11: New gas water heater (40gal), each $
#12: New electric water heater (40gal), each $
#13: Remove & replace gas flex supply line $
#14: Remove & replace gas stop each $
#15: Remove & replace exterior faucet each $
#16: Install new drain kits per sink $
Painting (Labor Cost to remove & replace, repair or install) #1: Prime & paint interior walls & ceilings, per square foot $ #2: Prime & paint interior trim & baseboard, per linear foot $
#3: Pressure clean per square foot $
#4: Prime & paint exterior walls & soffits, per square foot $
#6: Paint steel picket fence per square foot $
#7: Paint/stain wooden fence per square foot $
#8: Sand & scrape per square foot $
#9: Paint/Stain cabinets per square foot $
Sheetrock (Labor Cost to remove & replace, repair or install)
#1: Repair damaged sheetrock per square foot $
#2: Texture to match existing pattern, per square foot $
#3: Tape & float sheetrock per square foot $
#4: Install sheetrock (new work) per square foot $
Electrical (Labor Cost to remove & replace, repair or install)
#1: Install switches and sockets, per each $
#2: Replace/Install light fixtures per each $
#3: Extend/relocate existing circuits, per linear foot $
#4: Install new circuits (12-2 w/grnd), per linear foot $
#5: Install new circuits (10-3 w/grnd), per linear foot $
#6: Install new conduit, per linear foot $
#7: Install new circuit breakers, each $
#8: Replace circuit panel, each $
Welding
#1: Welding per hour $
Roofing (Labor Cost to remove & replace, repair or install)
#1: Remove & replace 20 yr 3 tab shingles per square $ #2: Remove & replace 30 yr 3 tab shingles per square $ #3: Remove & replace #15 felt paper per square $ #4: Remove & replace #30 felt paper per square $ #5: Remove & replace valley flashing per liner foot $ #6: Remove & replace ridge vent per liner foot $ #7: Remove & replace drip edge per liner foot $
#8: Install new 12” turbine vent each $
#9: Install new 12” static vent each $
#10: Install new 12”X6” soffit vents each $
Tile & Flooring (Labor Cost to remove & replace, repair or install) #1: Replace damaged ceramic floor tile per square foot $ #2: Replace damaged ceramic wall tile per square foot $ #3: Replace damaged VCT floor tile per square foot $ #4: Replace damaged peel & stick floor tile per square foot $ #5: Replace cement tile backer board per square foot $
#6: Replace damaged laminate flooring per square foot $
#7: Remove & Install new vinyl cove base per linear foot $ #8: Remove & Install new wood cove base per linear foot $
Rain Gutters (Labor Cost to remove & replace, repair or install) #1: Repair existing gutters/downspouts per linear foot $ #2: Remove & Replace existing gutters/downspouts per
Linear foot $
#3: Install new gutters/downspouts per linear foot $
#4: Install Leaf Guards per linear foot $
Bonding Fee (Required for projects over $50,000)
#1: Bond Fee %
In performing this contract, the contractor(s) shall comply with any and all applicable federal, state or local laws including but not limited to: Occupational Safety & Health, Equal Employment Opportunity, Immigration and Naturalization, The Americans with Disabilities Act, State Tax and Insurance Law, and the Fair Housing Act. Initials________
Signature & Addenda Acknowledgements
Addendum #1 Date Addendum #2 Date Addendum #3 Date Signature Date
Printed Name Company
E-mail address if available