• No results found

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

N/A
N/A
Protected

Academic year: 2021

Share "ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

Procurement Department

ADDENDUM # 1

To: 1112-909-62-3698

RFP for: Various Construction Maintenance & Repair Services

Remove and replace in their entirety the Fee Forms with the attached Revisions:

(2)

Fee Form

Proposer must enter a fee for all items in each category. Fees must include all labor, parts, materials, supplies, overhead, profit etc. per Section 5.3.1.

.

Carpentry (Labor Cost to remove & replace, repair or install)

#1: 2 X 4 x 8 Stud wall per linear foot $

#2: 2 X 4 rafter or stud per linear foot $

#3: 2 X 6 rafter, stud or joist per linear foot $

#4: 2 X 8 rafter or joist per linear foot $

#5: Plywood/OSB (3/4”) subfloor per square foot $

#6: Cabinets per liner foot $

#7: Counter tops per liner foot $

#8: Interior trim and baseboards per linear foot $

#9: Exterior trim & fascia per linear foot $

#10: Remove & replace windows $

#11: Remove & replace exterior door w/frame $

#12: Remove & replace exterior door w/frame $

#13: Remove & replace exterior door only $

#14: Remove & replace interior door only $

#15: Remove & replace exterior door frame only $ #16: Remove & replace exterior door frame only $

#17: Install fiberglass bat insulation, per square foot $

#18: Remove & replace single pane window glass only $ #19: Remove & replace double pane window glass only $

(3)

Plumbing (Labor Cost to remove & replace, repair or install)

#1: Kitchen sink, each $

#2: Kitchen Faucet with/without spray, each $

#3: Bathroom sink, each $

#4: Bathroom faucet, each $

#5: Commode complete, each $

#6: Flush valve and flapper, each $

#7: Tank with new valve & flapper, each $

#8: Flexible water supply line to sink or commode, each $

#9: Supply stop ¼ turn ball valve type, each $

#10: New faucet cartridge, each $

#11: New gas water heater (40gal), each $

#12: New electric water heater (40gal), each $

#13: Remove & replace gas flex supply line $

#14: Remove & replace gas stop each $

#15: Remove & replace exterior faucet each $

#16: Install new drain kits per sink $

Painting (Labor Cost to remove & replace, repair or install) #1: Prime & paint interior walls & ceilings, per square foot $ #2: Prime & paint interior trim & baseboard, per linear foot $

#3: Pressure clean per square foot $

#4: Prime & paint exterior walls & soffits, per square foot $

(4)

#6: Paint steel picket fence per square foot $

#7: Paint/stain wooden fence per square foot $

#8: Sand & scrape per square foot $

#9: Paint/Stain cabinets per square foot $

Sheetrock (Labor Cost to remove & replace, repair or install)

#1: Repair damaged sheetrock per square foot $

#2: Texture to match existing pattern, per square foot $

#3: Tape & float sheetrock per square foot $

#4: Install sheetrock (new work) per square foot $

Electrical (Labor Cost to remove & replace, repair or install)

#1: Install switches and sockets, per each $

#2: Replace/Install light fixtures per each $

#3: Extend/relocate existing circuits, per linear foot $

#4: Install new circuits (12-2 w/grnd), per linear foot $

#5: Install new circuits (10-3 w/grnd), per linear foot $

#6: Install new conduit, per linear foot $

#7: Install new circuit breakers, each $

#8: Replace circuit panel, each $

(5)

Welding

#1: Welding per hour $

Roofing (Labor Cost to remove & replace, repair or install)

#1: Remove & replace 20 yr 3 tab shingles per square $ #2: Remove & replace 30 yr 3 tab shingles per square $ #3: Remove & replace #15 felt paper per square $ #4: Remove & replace #30 felt paper per square $ #5: Remove & replace valley flashing per liner foot $ #6: Remove & replace ridge vent per liner foot $ #7: Remove & replace drip edge per liner foot $

#8: Install new 12” turbine vent each $

#9: Install new 12” static vent each $

#10: Install new 12”X6” soffit vents each $

Tile & Flooring (Labor Cost to remove & replace, repair or install) #1: Replace damaged ceramic floor tile per square foot $ #2: Replace damaged ceramic wall tile per square foot $ #3: Replace damaged VCT floor tile per square foot $ #4: Replace damaged peel & stick floor tile per square foot $ #5: Replace cement tile backer board per square foot $

#6: Replace damaged laminate flooring per square foot $

#7: Remove & Install new vinyl cove base per linear foot $ #8: Remove & Install new wood cove base per linear foot $

(6)

Rain Gutters (Labor Cost to remove & replace, repair or install) #1: Repair existing gutters/downspouts per linear foot $ #2: Remove & Replace existing gutters/downspouts per

Linear foot $

#3: Install new gutters/downspouts per linear foot $

#4: Install Leaf Guards per linear foot $

Bonding Fee (Required for projects over $50,000)

#1: Bond Fee %

In performing this contract, the contractor(s) shall comply with any and all applicable federal, state or local laws including but not limited to: Occupational Safety & Health, Equal Employment Opportunity, Immigration and Naturalization, The Americans with Disabilities Act, State Tax and Insurance Law, and the Fair Housing Act. Initials________

Signature & Addenda Acknowledgements

Addendum #1 Date Addendum #2 Date Addendum #3 Date Signature Date

Printed Name Company

E-mail address if available

References

Related documents

In addition to all other remedies available to the Commonwealth under applicable state and federal laws, in the event a Contractor or their subcontractors fail to comply with

Established environmental risk factors that have been associated with myopia include extended near work and minimal outdoor exposure [ 9 – 11 ], and lifestyle in childhood is

The UK Corporate Governance Code recommends that ‘the board should satisfy itself that plans are in place for the orderly succession for appointments to the board and to

A nurse displaced through this process has a thirty (30) day layoff window and all of the options list under Article 8.8, Displaced Employees except number three (Low

assigned shift and continues working during the scheduled shift, all hours worked prior to the scheduled shift shall be paid at time and one-half (1½) the nurse’s regular rate of

Importantly, the opportunity also arises to align the development of database scripts and application code in source control, continuous integration (CI), and release management..

Objective: This document constitutes a request for information for an Inventory/Fixed Asset Management System (infrastructure assets and municipal maintenance programs)

The full functionality of the SYSPRO ERP application is available with SYSPRO BusinessLive, enabling users to access the software through the Internet. www.syspro.com