• No results found

The Analysis of Peculiar Control Parameters of Artificial Bee Colony Algorithm on the Numerical Optimization Problems

N/A
N/A
Protected

Academic year: 2020

Share "The Analysis of Peculiar Control Parameters of Artificial Bee Colony Algorithm on the Numerical Optimization Problems"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. Control parameters used in the experiments.
Figure 1. The means of 30 runs for the Sphere function. (a) Population size = 100; (b) Population size = 50; (c) Population size = 20
Figure 3. The means of 30 runs for the Griewank function. (a) Population size = 100; (b) population size = 50; (c) Population size = 20
Figure 4. The means of 30 runs for the Ackley function. (a) Population size = 100; (b) Population size = 50; (c) Population size = 20

References

Related documents

Field experiments were conducted at Ebonyi State University Research Farm during 2009 and 2010 farming seasons to evaluate the effect of intercropping maize with

Knowledge and use of insecticide treated nets as a malaria preventive tool among pregnant women in a local government area of Lagos state,

Centers for Disease Control and Prevention; EHR: Electronic health record; EMR: Electronic medical record; GHC: Group health centre; ITS: [Niagara Region] information

It was decided that with the presence of such significant red flag signs that she should undergo advanced imaging, in this case an MRI, that revealed an underlying malignancy, which

19% serve a county. Fourteen per cent of the centers provide service for adjoining states in addition to the states in which they are located; usually these adjoining states have

National Conference on Technical Vocational Education, Training and Skills Development: A Roadmap for Empowerment (Dec. 2008): Ministry of Human Resource Development, Department

29-31 juli Ecco tour - Made in Denmark Tour Qualifier Silkeborg Ry GC 29/7-1/8 Belgian International Lady & Amateur Championship Hulencourt GC 30/7-1/8 Czech International

The Scrum Team then moves into the next Agile Phase, Sprint Planning, where the user stories from the Product Backlog will be further broken down into detailed tasks within a