APPENDIX A
BID FORM ITB #201433
(a) The Contractor shall fill out the table below of rates that will be charged for work completed under this Contract. This Bid Table shall be included within the proposal submitted to the City. (b) There is no guarantee regarding the amount of work that will be completed under this contract. (c) Any items not listed or described in the Bid Table will be negotiated between the City and the
Contractor at the time of need. Once a negotiated price is established, it will be used for the remainder of the contract.
F.O.B. Destination (Placement anywhere within the City of Winchester or City owned facilities):
The City is requesting delivered and placed per ton rates to furnish all labor, equipment, materials, transportation and traffic control, and these rates shall be binding upon award. Any bidder who enters a $0.00 per ton rate or leaves it blank shall be considered non-responsive.
PRICE SCHEDULE A—Asphalt Placement
Monday—Friday, 6:00 am—8:00 pm
Asphalt Mix Estimated
Type of Placement Unit Cost ($/Ton) Total Cost($)
Type Quantity
~o
SM-9.SAL Final Surface Course 10,000 tons Leveling (“scratch”)
Course [Prior to
SM-9.5AL 4,000 tons ~
5
3cç9qoo,
Placement of Final Surface_Course]
BM-25.OA Base Course 1,000 tons
.St~
‘~3,
SZDO.
PRICE SCHEDULE B—Asphalt Placement
Night Paving or Weekends Monday—Friday, 8:00 pm—6:00 am
Saturday—Sunday, Anytime (both am and pm)
Asphalt Mix Estimated
Type of Placement Unit Cost ($/Ton) Total Cost($)
Type Quantity
SM-9.SAL Final Surface Course 3,000 tons
‘
~9 7
i4
9
ç~
Leveling (“scratch”)
Course [Prior to 1,000 tons
~?9t ~J~SZ~
~‘~‘SM -9 .5AL
Placement of Final Surface_Course]
~, TOTAL-PRICE SCHEDULE B (Nights and Weekends)
‘3(c’J,
~
PRICE SCHEDULE C—Asphalt Planing (Milling)
Note: Prices shall include hauling asphalt millings to City Yards (301 E. Cork Street) and placed in a pile for future use by the City.
Estimated
Item Unit Cost ($/sq. yd.) Total Cost
($)
Quantity 30,000 sq. yds.
Asphalt Pavement Planing (Milling) (Up to 2-inch
s.c
/O~
c-c~o.
depth removal) 10,000 sq. yds.
(2-inchto4-
:3 ~
Asphalt Pavement Planing (Milling) inch depth removal)
~.(,
TOTAL-PRICE SCHEDULE C (Asphalt Planing)
/
L_J’3
~
BID SUMMARY—ASPHALT PLACEMENT
TOTAL-PRICESCHEDULEA
‘~Q
TOTAL- PRICE SCHEDULE B (Nights and Weekends)
~f
~TOTAL-PRICE SCHEDULE C (Asphalt Planing)
/ c~(
3,
coo
.a~
TOTALFORALL(A+B÷C)
j~77~2.oo
—OPTIONAL-PRICE SCHEDULE D—Asphalt Materials Only
(Prices shall be for City to pick up material at the contractor’s plant)
Note: Providing pricing for this schedule is optional. The City may award separate contracts for asphalt placement and asphalt materials.
Estimated
Item . Unit Cost ($/ton) Total Cost ($)
Quantity
Hot Mix Asphalt: SM-9.5AL 1,000 tons ,
5a(.)
-Hot Mix Asphalt: BM-25.0A 400 tons ~ U,
(~
00
•
TOTAL-PRICE SCHEDULE D (Asphalt Materials Only)
/
00
(o~D
Qi.jO~~~‘~—~~‘z
Specify Location of Contractor’s Asphalt Plant:
C.
Ie~_j’.6CG,OJC~~
~
~
~‘(COMPANY NAME:
LLI- L.
C
~
ô~i
ADDRESS:
~
//(~cb~
P,k~ S~h
J~Ics~,
(P~o.i~
TELEPHONE NUMBER:
~Y(2
-~o&3
— ~E-MAIL ADDRESS:
~
(~j4~€.(
~ ~
(2c~—f
~p~4~-ii
~+~;
~ - C~—O vY~NAME AND TITLE:
(~ \S~P~~
~ ~. ____DATE:
(~
~
/SIGNATURE: ~
—I
I
Bysigning thisbidsheet, bic~ier ac~kdov~.A(ecJ~ies that he completely understandsallspecifications and the General and Special conditidns. Failureto c~ompletely fillout the BidForm (bothpages) willresult in a non-responsive bid.
APPENDIX A
BID FORM ITB #201433
(a) The Contractor shall fill out the table below of rates that will be charged for work completed under this Contract. This Bid Table shall be included within the proposal submitted to the City. (b) There is no guarantee regarding the amount of work that will be completed under this contract. (c) Any items not listed or described in the Bid Table will be negotiated between the City and the
Contractor at the time of need. Once a negotiated price is established, it will be used for the remainder of the contract.
F.O.B. Destination (Placement anywhere within the City of Winchester or City owned facilities):
The City is requesting delivered and placed per ton rates to furnish all labor, equipment, materials, transportation and traffic control, and these rates shall be binding upon award. Any bidder who enters a $0.00 per ton rate or leaves it blank shall be considered non-responsive.
PRICE SCHEDULE A—Asphalt Placement
Monday—Friday, 6:00 am—8:00 pm
Asphalt Mix Estimated
Type of Placement Unit Cost ($/Ton) Total Cost($)
Type Quantity
SM-9.5AL Final Surface Course 10,000 tons
~
1≤~(~8I ~,SO1L ~
Leveling (“scratch”) Course [Prior to
SM-9.5AL 4,000 tons
~
1$Placement of Final Surface_Course]
BM-25.OA Base Course 1,000 tons
~‘(~,9
°° L~IE 000TOTAL-PRICESCHEDULEA
‘~J~ O~1~j
~PRICE SCHEDULE B —Asphalt Placement Night Paving or Weekends Monday—Friday, 8:00 pm—6:00 am
Saturday—Sunday, Anytime (both am and pm)
Asphalt Mix Estimated I
Type of Placement Unit Cost ($/Ton) Total Cost($)
Type Quantity
SM-9.5AL Final Surface Course 3,000 tons
$7~
,‘~S
~ 2l~ ~
Leveling (“scratch”) Course [Priorto
SM-9.5AL 1,000 tons S
Placement of Final
7~4~~5
~7’1~
~5O ~
Surface_Course]
TOTAL- PRICE SCHEDULE B (Nights and Weekends) $
PRICE SCHEDULE C—Asphalt Planing (Milling)
Note: Prices shall include hauling asphalt millings to City Yards (301 E. Cork Street) and placed in a pile for future use by the City.
Item Estimad Unit Cost ($/sq. yd.) Total Cost($)
30,000 sq. yds.
Asphalt Pavement Planing (Milling) (Up to 2-inch ~
~
~fi(~,9~oo°°
depth removal) 1
10,000 sq. yds.
. . .
(2-inchto4-Asphalt Pavement Planing (Milling) inch depth
~3
3L4
sy
#33~
~
°~removal)
TOTAL-PRICE SCHEDULE C (Asphalt Planing)
41)o3~
2.00. ~
BID SUMMARY
—ASPHALT PLACEMENT
TOTAL- PRICESCHEDULEA
~~/c~q Iob~°
TOTAL-PRICE SCHEDULE B (Nights and Weekends)
.11
~Q3
~I~0
TOTAL-PRICE SCHEDULE C (Asphalt Planing) -~
/O3~ 20D
.° ~>OPTIONAL-PRICE SCHEDULE D—Asphalt Materials Only
(Prices shall be for City to pick up material at the contractor’s plant)
Note: Providing pricing for this schedule is optional. The City may award separate contracts for asphalt placement and asphalt materials.
Item ~ Unit Cost ($/ton) Total Cost
($)
Hot Mix Asphalt: SM-9.5AL 1,000 tons
~ /5
*‘~L,Z, ISO.°°
HotMixAsphalt: BM-25.OA 400tons ~
15
ê~qc,.
O,~0TOTAL PRICE SCHEDULE D (Asphalt Materials Only)
117
~fwe
t-4ue
Specify Location of Contractor’s Asphalt Plant:
tu ~4Lk~s1t~a v’ft
4o~LCOMPANYNAME:
5~up~c~4
,&
ADDRESS:
WI
L~r~ ~ ~~ie 2ZL~f~7TELEPHONENIJMBER:
S~tO~
~G,23L13j
~f
1Z-L
E-MAIL ADDRESS: ,1’\~J
E354
4~-~.p~’rwy
NAME AND TITLE: ~
~
~z~2
DATE:
/Zo-r~2
//
SIGNATURE:
~1’~_f:~::.:::’
J1~2f4~1__
By signing this bid sheet, bidder acknowledges that he completely understands all specifications and the General and Special conditions. Failure to completely fill out the Bid Form (both pages) will result in a non-responsive bid.
APPENDIX A
BID FORM
ITB #201433
(a) The Contractor shall fill out the table below of rates that will be charged for work completed under this Contract. This Bid Table shall be included within the proposal submitted to the City. (b) There is no guarantee regarding the amount of work that will be completed under this contract. (c) Any items not listed or described in the BidTable will be negotiated between the City and the
Contractor at the time of need. Once a negotiated price is established, it will be used for the remainder of the contract.
F.O.B.Destination (Placement anywhere within the City of Winchester orCity owned facilities):
The City is requesting delivered and placed per ton rates to furnish all labor, equipment, materials,
transportation and traffic control, and these rates shall be binding upon award. Any bidder who enters a
$0.00per ton rate or leavesit blank shall be considered non-responsive. PRICE SCHEDULE A—Asphalt Placement
Monday—Friday, 6:00am—8:00pm
Asphalt Mix Estimated
Type of Placement Unit Cost ($/Ton) Total Cost
($)
Type Quantity
SM-9.5AL Final Surface Course 10,000 tons
Sb’
gy
0o
~
~
ôo~
Leveling (“scratch”)
SM-9,5AL Course [Prior to 4,000tons ~ 0 ~
Placement of Final
Surface_Course]
BM-25.OA Base Course 1,000tons • 0 C’ ~
OOC)
PRICE SCHEDULE B—Asphalt Placement Night Paving or Weekends Monday—Friday, 8:00 pm—6:00 am
Saturday—Sunday, Anytime (both am and pm)
Asphalt Mix Estimated
Type of Placement Unit Cost ($/Ton) Total Cost($)
Type Quantity
SM-9.5AL Final Surface Course 3,000 tons ,~ ~
~
0O 0
Leveling (“scratch”)
SM-9.5AL Course [Prior to 1,000 tons ~ ~ ,00
$
cc~
O
Placement of FinalSurface_Course]
TOTAL-PRICE SCHEDULE B (Nights and Weekends) ~
33~
/PRICE SCHEDULE C—Asphalt Planing (Milling)
Note: Prices shall include hauling asphalt millings to City Yards (301 E. Cork Street) and placed in a pile for future use by the City.
Item ~ Unit Cost ($/sq. yd.) Total Cost
($)
30,000 sq. yds. ~Asphalt Pavement Planing (Milling) (Up to 2-inch
1
0
o o
depth removal)I
10,000 sq. yds.
Asphalt Pavement Planing (Milling) (2-inch to 4-
~j
~
~
removal)TOTAL-PRICE SCHEDULE C (Asphalt Planing)
\Q
0
BID SUMMARY—ASPHALT PLACEMENT
TOTAL-PRICE SCHEDULE A ~
1,,
c2.(QO/ 000
TOTAL-PRICE SCHEDULE B (Nights and Weekends) ~.33~,
c~ô
o
TOTAL-PRICE SCHEDULE C (Asphalt Planing)
) 03,
00 0
TOTAL FORALL(A+B+C)
~1
OPTIONAL-PRICE SCHEDULE D—Asphalt Materials Only
(Prices shall be for City to pick up material at the contractor’s plant)
Note: Providing pricing for this schedule is optional. The City may award separate contracts for asphalt placement and asphalt materials.
Estimated
Item Unit Cost ($/ton) Total Cost
($)
QuantityHot Mix Asphalt: SM-9,5AL 1,000 tons ~ (g~~ . 00 ~
Hot Mix Asphalt: BM-25.OA 400 tons ~
(ç~
~,.~
,~~
~..o o
TOTAL-PRICE SCHEDULE D (Asphalt Materials Only) ~
~,
//‘p
~~rmf5Tr~iC
t,4~cJ~:
Specify Location of Contractor’s Asphalt Plant: ~ ~
COMPANY NAME:
42.T~o~
(OAT~J CO.,
~ADDRESS:
~3~1 l~ 0
U~ lAsJ £
04Z
-~u LL~ S, ~,Eh&
p.C)
J
~$
TELEPHONE NUMBER:
(‘?o3)
‘~‘~
—i;ss
E-MAIL ADDRESS:
~VF
THU
Z(J)AJ≤T. CO
~&
NAMEANDTITLE:
E~3~D
I4~AO≤O~/i~
?s.rJc-~J--r
By signing this bid sheet, bidder acknowledges that he completely understands all specifications and the General and Special conditions. Failure to completely fill out the Bid Form (both pages) will result in a non-responsive bid.