COMPANY
PRESENTATION
RD&S GROUP
MARKETS
Guyana
Surinam
Belgium
French Guyana
Netherlands
Indonesia
India
Certeco
SRRD
&
S group
Buro CITE
NL2 ChangeIT
NLFounded in 2002
Itailor
2
SR
Buro CITE
SRScintillant
NLTotal workforce is 35 engineers and consultants
Founded in 2006
Founded in 2013
Founded in 2008
Founded in 2004
Founded in 2006
TECHNOLOGY PARTNERS
Waste management
Drinking water
solution
Sustainable parking solutions
Constructions
Re-use of materials
Waste to Energy solutions
Waste water treatment
Mobile drinking water
installation
Bridges
SERVICES
1. Structures
2. Engineering Public Space
3. Public Space Management
4. Employment Agency
5. Software Development & Business Intelligence
6. Urban Planning & Development
STRUCTURES
•
Schedule of requirements
Defining the requirements with the client
•
Sketching and Design
We optimize the design, strength and stability calculations.
•
Technical drawings and contract specifications
Based on the technical design, contract specifications are drawn up
•
Procurement and Construction
We organize the tender process up to the contract award
•
Application, management and maintenance
To ensure functionality and structural integrity regular maintenance is essential. We advise on managing construction maintenance and set up maintenance plans.
•
Bridges
Brigde over the Saramaccariver, in Suriname
•
Type
Dutch class 60 bridge, with 5 spans of 34 meters
•
Material
Concrete 34.00 34.00 34.00 34.00 34.00 34.00 34.00 238.00 ZIJAANZICHT BOVENAANZICHT 1 2 3 4 6 % 30.00 OPRIT 520 6 % OPRIT Ref. + 2.00 m Ref. + 1.80 Ref. + 4.04 m Ref. + 6.08 m H.H.W. bestrating ( 50 .00 m ) zie blad no 17 bestrating ( 50 .00 m ) zie blad no 17 Ref. - 0.20 Ref. 0.00 Ref. 0.00 Ref. - 0.60•
Bridges
Brigde over the Saramacca canal, in Suriname
•
Type
Dutch class 60 bridge, with 3 spans of 75 meters
•
Material
Steel (galvanized) H.K.P. 5 .5 0 75.00 6 % 6 % r efer entielijn 75.00 30.00 75.00 30.00•
River dikes
Commewijne river, near Paramaribo
•
Type
Rockfill and slope blocks. Length 900 m.
•
Material
Concrete and natural stones
1:2,7
Stortsteen
Houten perkoen palen Ø15 cm Lengte 300 cm , h.o.h. 30 cm
+0.75 NSP (ref.)
Teenschot 2 x 2"x 6" (hardhout). Planken in lengterichting aanbrengen met verspringende lassen. Elke plank aan elke perkoenpaal nagelen met gegalvaniseerde draadnagels 3".
Spijkerlat 11
2 " x 2". Geotextiel tweemaal om deze lat wikkelen.
Betonblokken 40 x 40 x 20 cm Geotextiel
Uitvullaag, min 5 cm en max. 7 cm dik.
+2.15 NSP +2.35 NSP
Rivierzijde
Dwarsdoorsnede huidige oeververdediging
Schaal 1: 100Betonnen opsluitband 18 x 25 x 100 cm 300 cm
I
Aan te vullen met klei (volgens de gestelde eisen in het bestek)
1: 2
Geotextiel
Schelpzand 10 cm dik klinkzand 10 cm dik Herleggen betonblokken 40 x 40 x 20 cm
Which is a structural fiber and a plastic, this is
known as Fiber Reinforced Plastics, or FRP for
short. Like straw, the fiber provides the structure
and strength to the composite, while a plastic
polymer holds the fiber together. Common types of
fibers used in FRP composites are:
•
Fiberglass
•
Carbon Fiber
•
Retaining structures
Marowijne river near the border with French Guyana
•
Type
Steel scheetpiles. Length 350 m
•
Material
Steel 0. 00 m 2. 00 m 4. 00 m 6. 00 m 8. 00 m 10 .0 0 m Profiel Stalen damplank +2.15 NSP +2.35 NSP 300 cm 1: 2 Schelpzand 10 cm dik klinkzand 10 cm dikankerstaaf ankerblok, 1 m³ betonBlokken h.o.h. 5 m
-8.25 NSP 15,00 m
•
Cruise terminal
Suriname river , near Paramaribo
•
Type
Mooring platform•
Material
Concrete M ONUM E NT 25 FE BTUARI O P E N B A R E P LATT EB RUG LOOD S EN K.N.S. M. STE IGERS
U
R
I
N
A
M
E
R
I
V
I
E
R
ENGINEERING PUBLIC SPACE
•
Schedule of requirements
Defining the requirements with the client
•
Research and Design
We investigate the project location, deliver surveys and calculations. Based on the research data we make a design. We optimize the design, strength and stability calculations.
•
Technical drawings and contract specifications
Based on the technical design, contract specifications are drawn up
•
Procurement and Construction
We organize the tender process up to the contract award
•
Application, management and maintenance
To ensure functionality regular maintenance is essential. We advise on managing construction maintenance and set up maintenance plans.
•
Sewage works
Urban areas in Paramaribo
•
Type
Concrete drain pipes .Length 16.000 m.
•
Material
•
Road engineering
Highways and roads in urban areas. In different areas.
•
Type
Soilcement base with an asphalt toplayer
•
Material
•
Potable water container
•
Clean drinking water from:
•
Polluted freshwater, brackish or saltwater, water
wells, waste water
•
Production starting from 60.000 ltr per 24 hours
•
Characteristics
•
Mainly membrane technology
•
Chemical free purification process
•
Low maintenance costs
•
Unique selling points
•
User friendly and attractive parkingsystem
•
Light weight & fast build construction (1-3 months)
•
Less failure-cost due to integrated prefabrication
•
High residual value, re-usable and recyclable
•
Corrosion free and fire restistant coating
•
Maintenance friendly and sustainable concept
PUBLIC SPACE MANAGEMENT
•
We support clients in defining policy and
making management and maintenance plans
•
Policy and organization
• Vision on design, maintenance and community orientated
approach
• Integrated management systems for public space and
guidelines for public space design
• Analysis of maintenance costs and optimizing workflow
• Sustainable procurement
•
Management and maintenance
• Maintenance management plans
• Integrated maintenance plans
• Costs and funding of public space management
• Maintenance contracts and specifications