• No results found

COMPANY PRESENTATION RD&S GROUP RD&S GROUP FOR SUSTAINABLE RESULTS

N/A
N/A
Protected

Academic year: 2021

Share "COMPANY PRESENTATION RD&S GROUP RD&S GROUP FOR SUSTAINABLE RESULTS"

Copied!
23
0
0

Loading.... (view fulltext now)

Full text

(1)

COMPANY

PRESENTATION

RD&S GROUP

(2)

MARKETS

Guyana

Surinam

Belgium

French Guyana

Netherlands

Indonesia

India

(3)

Certeco

SR

RD

&

S group

Buro CITE

NL

2 ChangeIT

NL

Founded in 2002

Itailor

2

SR

Buro CITE

SR

Scintillant

NL

Total workforce is 35 engineers and consultants

Founded in 2006

Founded in 2013

Founded in 2008

Founded in 2004

Founded in 2006

(4)

TECHNOLOGY PARTNERS

Waste management

Drinking water

solution

Sustainable parking solutions

Constructions

Re-use of materials

Waste to Energy solutions

Waste water treatment

Mobile drinking water

installation

Bridges

(5)

SERVICES

1. Structures

2. Engineering Public Space

3. Public Space Management

4. Employment Agency

5. Software Development & Business Intelligence

6. Urban Planning & Development

(6)

STRUCTURES

Schedule of requirements

Defining the requirements with the client

Sketching and Design

We optimize the design, strength and stability calculations.

Technical drawings and contract specifications

Based on the technical design, contract specifications are drawn up

Procurement and Construction

We organize the tender process up to the contract award

Application, management and maintenance

To ensure functionality and structural integrity regular maintenance is essential. We advise on managing construction maintenance and set up maintenance plans.

(7)

Bridges

Brigde over the Saramaccariver, in Suriname

Type

Dutch class 60 bridge, with 5 spans of 34 meters

Material

Concrete 34.00 34.00 34.00 34.00 34.00 34.00 34.00 238.00 ZIJAANZICHT BOVENAANZICHT 1 2 3 4 6 % 30.00 OPRIT 520 6 % OPRIT Ref. + 2.00 m Ref. + 1.80 Ref. + 4.04 m Ref. + 6.08 m H.H.W. bestrating ( 50 .00 m ) zie blad no 17 bestrating ( 50 .00 m ) zie blad no 17 Ref. - 0.20 Ref. 0.00 Ref. 0.00 Ref. - 0.60

(8)

Bridges

Brigde over the Saramacca canal, in Suriname

Type

Dutch class 60 bridge, with 3 spans of 75 meters

Material

Steel (galvanized) H.K.P. 5 .5 0 75.00 6 % 6 % r efer entielijn 75.00 30.00 75.00 30.00

(9)

River dikes

Commewijne river, near Paramaribo

Type

Rockfill and slope blocks. Length 900 m.

Material

Concrete and natural stones

1:2,7

Stortsteen

Houten perkoen palen Ø15 cm Lengte 300 cm , h.o.h. 30 cm

+0.75 NSP (ref.)

Teenschot 2 x 2"x 6" (hardhout). Planken in lengterichting aanbrengen met verspringende lassen. Elke plank aan elke perkoenpaal nagelen met gegalvaniseerde draadnagels 3".

Spijkerlat 11

2 " x 2". Geotextiel tweemaal om deze lat wikkelen.

Betonblokken 40 x 40 x 20 cm Geotextiel

Uitvullaag, min 5 cm en max. 7 cm dik.

+2.15 NSP +2.35 NSP

Rivierzijde

Dwarsdoorsnede huidige oeververdediging

Schaal 1: 100

Betonnen opsluitband 18 x 25 x 100 cm 300 cm

I

Aan te vullen met klei (volgens de gestelde eisen in het bestek)

1: 2

Geotextiel

Schelpzand 10 cm dik klinkzand 10 cm dik Herleggen betonblokken 40 x 40 x 20 cm

(10)

Which is a structural fiber and a plastic, this is

known as Fiber Reinforced Plastics, or FRP for

short. Like straw, the fiber provides the structure

and strength to the composite, while a plastic

polymer holds the fiber together. Common types of

fibers used in FRP composites are:

Fiberglass

Carbon Fiber

(11)

Retaining structures

Marowijne river near the border with French Guyana

Type

Steel scheetpiles. Length 350 m

Material

Steel 0. 00 m 2. 00 m 4. 00 m 6. 00 m 8. 00 m 10 .0 0 m Profiel Stalen damplank +2.15 NSP +2.35 NSP 300 cm 1: 2 Schelpzand 10 cm dik klinkzand 10 cm dik

ankerstaaf ankerblok, 1 m³ betonBlokken h.o.h. 5 m

-8.25 NSP 15,00 m

(12)

Cruise terminal

Suriname river , near Paramaribo

Type

Mooring platform

Material

Concrete M ONUM E NT 25 FE BTUARI O P E N B A R E P LATT EB RUG LOOD S EN K.N.S. M. STE IGER

S

U

R

I

N

A

M

E

R

I

V

I

E

R

(13)

ENGINEERING PUBLIC SPACE

Schedule of requirements

Defining the requirements with the client

Research and Design

We investigate the project location, deliver surveys and calculations. Based on the research data we make a design. We optimize the design, strength and stability calculations.

Technical drawings and contract specifications

Based on the technical design, contract specifications are drawn up

Procurement and Construction

We organize the tender process up to the contract award

Application, management and maintenance

To ensure functionality regular maintenance is essential. We advise on managing construction maintenance and set up maintenance plans.

(14)

Sewage works

Urban areas in Paramaribo

Type

Concrete drain pipes .Length 16.000 m.

Material

(15)

Road engineering

Highways and roads in urban areas. In different areas.

Type

Soilcement base with an asphalt toplayer

Material

(16)

Potable water container

Clean drinking water from:

Polluted freshwater, brackish or saltwater, water

wells, waste water

Production starting from 60.000 ltr per 24 hours

Characteristics

Mainly membrane technology

Chemical free purification process

Low maintenance costs

(17)

Unique selling points

User friendly and attractive parkingsystem

Light weight & fast build construction (1-3 months)

Less failure-cost due to integrated prefabrication

High residual value, re-usable and recyclable

Corrosion free and fire restistant coating

Maintenance friendly and sustainable concept

(18)

PUBLIC SPACE MANAGEMENT

We support clients in defining policy and

making management and maintenance plans

Policy and organization

• Vision on design, maintenance and community orientated

approach

• Integrated management systems for public space and

guidelines for public space design

• Analysis of maintenance costs and optimizing workflow

• Sustainable procurement

Management and maintenance

• Maintenance management plans

• Integrated maintenance plans

• Costs and funding of public space management

• Maintenance contracts and specifications

(19)

URBAN PLANNING & DEVELOPMENT

Several house designs

for Surinam market

(20)
(21)
(22)
(23)

COMPANY

PRESENTATION

RD&S GROUP

References

Related documents

 Maintenance and administration of Council's Open Windows Contract Management System to ensure its accuracy and currency in respect of all Council tender processes and

For the full year, we expect to deliver organic revenue growth in the mid single digits range, an improvement in the margin to give strong adjusted operating profit and cash

In 2020 Novian Systems UAB eliminated the impairment of Andmevara AS EUR-64 thousand (additional deferred income tax income EUR 10 thousand) and impairment of Acena UAB EUR -27

When the money supply follows a random walk ( γ = 1), a money supply shock has no effect on the nominal interest rate, leading to a fall in the real rate but an equal rise in

and Secretary-Elect Amy Stone; Associate Professor and Program Director of Integrated Information Technology, School of Hotel, Restaurant and Tourism Management Elizabeth

In other cases, these misconceptions originated from the lack of knowledge that most people have when it comes to being able to effectively use the power of influence and

Technology, security, safety, durability and ergonomics are all key priorities in the realization of incident and control centres.. Trust and reliability are uncompromisingly