Equipment Productivity Forecasting Model for Multi-storey Building Construction Through Regression Analysis

N/A
N/A
Protected

Academic year: 2020

Share "Equipment Productivity Forecasting Model for Multi-storey Building Construction Through Regression Analysis"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1.Input Data
Figure 2.Regression Analysis
Table 6. The actual and the predicted productivity
Figure 6.Comparison of predicted and actual productivity

References

Related documents

In light of the policy on refugee children and international human rights and refugee law standards, the UNHCR issued updated Guidelines on Protection and Care

If a person is injured by the collapse of a building or other construction erected on a lot, or by the breaking away of the portion thereof, or if some other dam- age has been

Haploid production of Australian wheat (Triticum aestivum L.) cultivars through wheat x maize (Zea mays L.) crosses. Production of haploid plants from ten hybrids of bread

Funding Agency: Transforming Youth Recovery Title of Project: Health Education Resource Center. Project Director: Davidson, Eric –

Загальні компетентності (ЗК) ЗК 1 - Здатність володіти культурою мислення, здатністю до узагальнення, аналізу, сприйняття інформації, постанови мети і вибору

This enables real-time simultaneous and proportional control multi of multiple degrees of 133 freedom (DOFs) in myoelectric robotic limbs... Model-based Myoelectric

This project was a pre- and post-intervention evidence-based project. The aim of the project was to improve RN compliance with dressing change and Curos cap use on CVCs. The

• Audio test (HA telecoil mode): measure the magnetic fi elds emitted by the phone using a T-coil probe.. A 6-axis robot is necessary to reach the measurement