• No results found

Prioritisation of Maintenance Policies for Upstream Equipment in A Typical Quarry Using Decision Maintenance Grid (DMG)

N/A
N/A
Protected

Academic year: 2020

Share "Prioritisation of Maintenance Policies for Upstream Equipment in A Typical Quarry Using Decision Maintenance Grid (DMG)"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1:  Cost per operating unit time vs. operating time (Samanta et al, 2002).
Figure 3: Design Maintenance Grid (DMG)(Adapted from Labib, 2004)
Table 2: Availability Values for the studied equipment in CPN Quarry Month  DR EXC TR
Table 3: Failure Frequency of studied equipment at the upstream section of CPN Quarry The failure analysis of the equipment in thequarryis presented in Tables 3 and Figures 4

References

Related documents

We combined two different somatic variant callers with different algo- rithms, Strelka and VarScan 2, and evaluated performance using whole exome sequencing data obtained from

KNX offers load management solutions that permit the adaptation of conventional electric loads and electric loads from HVAC sys- tems, white goods and electric vehicles according

Our study suggests that final year medical students were significantly more likely to pass a station in the OSCE if undertaken on a later day compared to students

In the life insurance sector, until 31 March 2012, AIB distributed Ark Life insurance products through its branch network under a distribution agreement (“the Ark Life

business mileage (but not his personal miles) Island on Monday morning and drives to Albany Because Bill’s reimbursement was included and expenses daily. to exhibit the

Aesthetics and Advantages of Sustainable Landscapes Sustainable Plantings Native Plants Green Roofs Living Walls Rain Gardens Turf Alternatives Water Management Detention Ponds..

Third, the co-occurrence in text captions can have a combined influence with the two previous points; if a given word is correctly learned by the model because it is well represented

For Calabi–Yau fourfolds with Picard–Fuchs operators of non-minimal order the large volume asymptotics of integral quantum periods does not determine all integration