• No results found

Implementation of Environmental Monitoring System with PLC and SCADA

N/A
N/A
Protected

Academic year: 2020

Share "Implementation of Environmental Monitoring System with PLC and SCADA"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1. PLC structure
Fig. 4. Architecture of the Andromeda network
Table I   Daily Meteorological Data from one LMS 14/05/2014
Fig. 8. Hydrologic and meteorological parameters.

References

Related documents

In this investigation, the researcher indirectly examines the role of NCLB school choice by performing an in-depth investigation of the open enrollment program in a Minnesota school

An analysis of national reporting on local health and social care service

Dazu wurden die Mäuse ab Tag 80 nach Infektion mit 50 mg Substanz/ Körpergewicht für 40. Tage über

Any interference obtained was compared versus six replicates of extracted samples at the LLOQ level prepared in one of the plasma lots with the least interference at

Poor physical condition ( P = 0.000) and low motivation ( P = 0.011) were identified as barriers to exercise following burn injury, whereas time was a barrier prior to injury ( P

--- --- Service level Financial Capacity Continuity Availability Service Incident Problem Configuration Change Release Level management management management

“Reflections on the Political Economy of Artisanal Diamond Mining in Kono District, Sierra Leone.” In Small-scale Mining, Rural Subsistence and Poverty in West Africa, edited

Vadivel and Mohanarao Navuluri, Regular weakly closed sets in ideal topological spaces, Accepted in International Journal of Pure and Applied Mathematics. Vadivel and