PARTITION THAT LIMITS SMOKE TRANSMISSION DESCRIPTION
SYMBOL
1/2 HOUR FIRE PARTITION 1 HOUR FIRE PARTITION 2 HOUR FIRE PARTITION 3 HOUR FIRE PARTITION
1 HOUR FIRE AND SMOKE BARRIER 2 HOUR FIRE AND SMOKE BARRIER FIRE RATED PARTITION LINETYPES
AIR CONDITIONING UNIT - DX
AIR COOLED CONDENSING UNIT DESIGNATION BI-POLAR IONIZATION
DEDICATED OUTSIDE AIR HANDLING UNIT CEILING CASSETTES
HEAT RECOVERY UNIT MODE CHANGEOVER UNIT EXHAUST FAN DUCTED VRF UNIT SYMBOL DESCRIPTION AC-X ACCU-X BPI-X DOAS-X CC-X HRU-X MCU EF-X DU-X EQUIPMENT DESIGNATIONS SYMBOL DESCRIPTION REFRIGERANT LIQUID RL REFRIGERANT SUCTION RS REFRIGERANT VENT RV PIPING SYMBOLS PIPE GUIDE SYMBOL DESCRIPTION PIPE HANGER PIPE SLIDE PIPE ANCHOR PUMP S
PIPING COMPONENTS AND SPECIATIES
DESCRIPTION SYMBOL
HUMIDITY SENSOR
TEMPERATURE SENSOR
AIR FLOW
TRANSFER AIR FLOW (CFM INDICATED)
SUPPLY AIR DIFFUSER
RETURN AIR GRILLE
EXHAUST AIR GRILLE
FIRE DAMPER
COMBINATION FIRE / SMOKE DAMPER
VOLUME DAMPER
BACK DRAFT DAMPER
AUTOMATIC ISOLATION DAMPER
SMOKE DAMPER
FLEXIBLE CONNECTION
DUCTWORK W/ SOUND LINING
HORIZONTAL ACCESS DOOR
RECTANGULAR BRANCH TAKE-OFF
BELL MOUTH BRANCH TAKE-OFF
ROUND BRANCH TAKE-OFF
ROUND DUCT DROP OFF BOTTOM
DUCT TRANSITION
SQUARE TO ROUND TRANSITION
DUCTWORK CHANGE IN ELEVATION (UP OR DOWN)
SUPPLY / OUTSIDE AIR DUCT RISER
RETURN AIR DUCT RISER
EXHAUST / RELIEF AIR DUCT RISER
ROUND DUCT RISER
AIR DEVICE IDENTIFIER SMOKE DETECTOR SD UP/DN FSD BDD VD FD SD AIR DEVICE TYPE CFM XX X 100 CFM
CARBON DIOXIDE SENSOR H
T
C
DUCTWORK SYMBOLS
SMOKE DETECTOR (IONIZATION) DUCT SMOKE DETECTOR
D I
N
N
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-001
Mechanical Notes, Symbols
and Abbreviations
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
NOTE: THIS IS A STANDARD ABBREVIATION LIST. SOME ABBREVIATIONS MAY NOT APPEAR ON THE ACCOMPANYING DRAWINGS.HWR HOT WATER RECIRCULATION
HZ HERTZ
IA INSTRUMENT AIR
ICW INDUSTRIAL COLD WATER
IHR INDUSTRIAL HOT WATER RECIRCULATION IHW INDUSTRIAL HOT WATER
IN INCH, INCHES INV EL INVERT ELEVATION
KW KILOWATTS
L LONG, LENGTH
LA LABORATORY AIR
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LBS/HR POUNDS PER HOUR LN LIQUID NITROGEN LP LIQUID PROPANE
LPG LIQUID PETROLEUM GAS
LPR LOW PRESSURE STEAM RETURN LPS LOW PRESSURE STEAM SUPPLY
LV LABORATORY VENT, LABORATORY VACUUM LW LABORATORY WASTE
LWT LEAVING WATER TEMPERATURE
MA MEDICAL AIR
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR MCC MOTOR CONTROL CENTER
MEQ MECHANICAL EQUIPMENT
MH-# MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS MO MOTOR OIL PIPING
MOD MOTOR OPERATED DAMPER
MPR MEDIUM PRESSURE STEAM RETURN MPS MEDIUM PRESSURE STEAM SUPPLY MV MEDICAL VACUUM
N NITROGEN
NA, N/A NOT APPLICABLE
NC NOISE CRITERIA, NORMALLY CLOSED NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NG NATURAL GAS
NO NORMALLY OPEN, NITROUS OXIDE
No NUMBER
NOM NOMINAL
NPSH NET POSITIVE SUCTION HEAD NPW NON-POTABLE WATER
O OXYGEN
OA OUTSIDE AIR
OD OVERFLOW DRAIN OED OPEN ENDED DUCT
OF OVERFLOW
OS&Y OUTSIDE STEM AND YOKE
P&ID PROCESS AND INSTRUMENTATION DIAGRAM
PA PLANT AIR
PC PUMPED CONDENSATE
PCHR PRIMARY CHILLED WATER RETURN PCHS PRIMARY CHILLED WATER SUPPLY PCP PUMP CONTROL PANEL
PCR PUMPED CONDENSATE RECIRCULATION PCWR PROCESS COOLING WATER RETURN PCWS PROCESS COOLING WATER SUPPLY PD PRESSURE DROP, PUMP DISCHARGE
PG PILOT GAS
PGR PROCESS GLYCOL WATER RETURN PGS PROCESS GLYCOL WATER SUPPLY
PH PHASE
PHR PRIMARY HEATING RETURN PHS PRIMARY HEATING SUPPLY PIV POST INDICATING VALVE PPH POUNDS PER HOUR
PRV PRESSURE REDUCING VALVE, PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PW POTABLE WATER
RA RETURN AIR, RELIEF AIR RAF RETURN AIR FAN
RD REFRIGERANT DISCHARGE RDR ROOF DRAIN
RH RELATIVE HUMIDITY RHR REHEAT WATER RETURN RHS REHEAT WATER SUPPLY RI REMOVE AND REINSTALL RL REFRIGERANT LIQUID
ROR REVERSE OSMOSIS WATER RETURN ROS REVERSE OSMOSIS WATER SUPPLY RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RV RELIEF VENT, REFRIGERANT VENT RX REMOVE EXISTING
SA SUPPLY AIR, SHOCK ARRESTOR SAN SANITARY, SOIL, WASTE
SCHR SECONDARY CHILLED WATER RETURN SCHS SECONDARY CHILLED WATER SUPPLY SD STORM DRAIN, SMOKE DETECTOR
SF SQUARE FOOT
SHR SECONDARY HEATING WATER RETURN SHS SECONDARY HEATING WATER SUPPLY SL SOUND LINING
SP STATIC PRESSURE SPR SPRINKLER LINE SQ FT SQUARE FOOT SS STAINLESS STEEL SSUL SODIUM SULFITE STDR STORM DRAIN
SW SOFT WATER
TS TAMPER SWITCH
TSP TOTAL STATIC PRESSURE
TW TREATED WATER
TWR TEMPERED WATER RETURN TWS TEMPERED WATER SUPPLY
TYP TYPICAL
ΔT TEMPERATURE DIFFERENCE UCD UNDERCUT DOOR
UL UNDERWRITERS LABORATORIES
V VACUUM, VOLTS
VD VOLUME DAMPER
VENT VENTILATION
VFD VARIABLE FREQUENCY DRIVE VPD VACUUM PUMP DISCHARGE VSD VARIABLE SPEED DRIVE VTR VENT THROUGH ROOF
W WATTS, WIDE
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
WH WALL HYDRANT
WWF WELDED WIRE FABRIC WWM WELDED WIRE MESH
# NUMBER, POUND $ DOLLAR % PERCENT & AND + PLUS - MINUS
/ DIVIDE BY, PER < LESS THAN = EQUALS, EQUAL TO > GREATER THAN x MULTIPLY BY, BY x" INCHES, INCH x' FEET, FOOT ± PLUS OR MINUS
≤ LESS THAN OR EQUAL TO ≥ GREATER THAN OR EQUAL TO
@ AT
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
ACV AUTOMATIC CONTROL VALVE AD ACCESS DOOR, AREA DRAIN
AF ANTIFREEZE
AFF ABOVE FINISHED FLOOR
AR ARGON GAS
ATC AUTOMATIC TEMPERATURE CONTROL BAS BUILDING AUTOMATION SYSTEM BBD BOILER BLOWDOWN
BCWR BEARING COOLING WATER RETURN BCWS BEARING COOLING WATER SUPPLY BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER BHP BRAKE HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
BO BLOW OFF
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR BV BALANCING VALVE
CA CONTROL AIR
CBD CONTINUOUS BLOWDOWN
CC CAMPUS CONDENSATE
CCMS CENTRAL CONTROL AND MONITORING SYSTEM CD CONDENSATE DRAIN
CF CHEMICAL FEED
CFM CUBIC FEET PER MINUTE CHEL CHELANT
CHR CHILLED WATER RETURN CHS CHILLED WATER SUPPLY
CHX CHILLED WATER HEAT EXCHANGER
CO CLEANOUT
CO2 CARBON DIOXIDE
CS CLEAN STEAM
CT COMBUSTION TURBINE
CW COLD WATER, DOMESTIC CITY WATER CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY °C DEGREE(S) CELSIUS
D DEEP, DRAIN WATER DB DECIBEL, DRY BULB DDC DIRECT DIGITAL CONTROL DESIG DESIGNATION
DHR DISTRIBUTION HEATING WATER RETURN DHS DISTRIBUTION HEATING WATER SUPPLY DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY DIA, Ø DIAMETER
DIR DEIONIZED WATER RETURN DIS DEIONIZED WATER SUPPLY
DL DOOR LOUVER
DN DOWN
DSP DRY SPRINKLER PIPE
DTR DUAL TEMPERATURE RETURN DTS DUAL TEMPERATURE SUPPLY DW DISTILLED WATER
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE ED EQUIPMENT DRAIN
EJ EXPANSION JOINT ELEV ELEVATION
EMS ENERGY MANAGEMENT SYSTEM EQ EQUIPMENT, EQUALIZING ESP EXTERNAL STATIC PRESSURE
ETC ETCETERA
EVAC GAS EVACUATION
EWT ENTERING WATER TEMPERATURE
EX EXISTING
#2FOR NUMBER 2 FUEL OIL RETURN #2FOS NUMBER 2 FUEL OIL SUPPLY #6FOR NUMBER 6 FUEL OIL RETURN #6FOS NUMBER 6 FUEL OIL SUPPLY
F FIRE LINE
F&T FLOAT AND THERMOSTATIC TRAP FC FLEXIBLE CONNECTION
FD FIRE DAMPER, FOUNDATION DRAIN FDR FLOOR DRAIN
FDV FIRE DEPARTMENT VALVE FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION FIN/FT FINS PER FOOT
FIN/INCH FINS PER INCH
FM FLOWMETER
FMF FLOWMETER FITTING
FO FUEL OIL
FOF FUEL OIL FILL
FOO FUEL OIL OVERFLOW FOR FUEL OIL RETURN FOS FUEL OIL SUPPLY FOSUCT FUEL OIL SUCTION FOT FUEL OIL TRANSFER FOTP FUEL OIL TRANSFER PUMP FOV FUEL OIL VENT
FPM FEET PER MINUTE FPS FEET PER SECOND
FS FLOW SWITCH
FT FOOT, FEET
FW FEED WATER
FWR FEED WATER RECIRCULATION FWS FEED WATER SUCTION
°F DEGREE(S) FAHRENHEIT
G NATURAL GAS
GAL GALLON, GALLONS
GEN GENERATOR
GHR GLYCOL HEATING RETURN GHS GLYCOL HEATING SUPPLY GPH GALLONS PER HOUR GPM GALLONS PER MINUTE
GR AUTOMOTIVE LUBRICATION PIPING
H HIGH
HB HOSE BIB
HED HOSE END DRAIN VALVE
HP HORSEPOWER
HPR HIGH PRESSURE STEAM RETURN HPS HIGH PRESSURE STEAM SUPPLY HR HEATING WATER RETURN HRR HEAT RECOVERY RETURN HRS HEAT RECOVERY SUPPLY
HRSG HEAT RECOVERY STEAM GENERATOR HS HEATING WATER SUPPLY
HT HEIGHT
HTHR HIGH TEMPERATURE HEATING WATER RETURN HTHS HIGH TEMPERATURE HEATING WATER SUPPLY
XX CONTROL AND INSTRUMENTATION LEGEND
H AMD CT DPT PT- HT- TT-DPS M PT M SD FZ- D- SP S- BFM- V- P-SYSTEM HLHT-T SIGNAL TYPE (AI,BI,AO,BO) POINT NUMBER M VFD ES BDD ATMD AMS LPS SPACE HUMIDISTAT TEMPERATURE TRANSMITTER DUCT OR PIPE THERMOMETER
CURRENT TRANSDUCER
PRESSURE GAGE WITH BALL VALVE PRESSURE TRANSMITTER HUMIDITY TRANSMITTER MAGNAHELIC GAGE METER PRESSURE TRANSMITTER FREEZESTAT SMOKE DETECTOR
CONTROL OR ISOLATION DAMPER
MANUAL SWITCH - START/STOP, FAN SPEED, OCCUPIED/UNOCCUPIED
BUILDING FLOW METER
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
AIR MONITORING DEVICE WITH PRESSURE TRANSMITTER
DIFFERENTIAL PRESSURE SWITCH OR SENSOR
STATIC PRESSURE SENSING STATION DIFFERENTIAL PRESSURE TRANSMITTER
COIL OR DOMESTIC WATER CIRCULATION PUMP
INDICATION INPUT POINT
NORMALLY OPEN
NORMALLY OPEN CONTACT
NO
COMMON
TWO POSITION
MOTOR OPERATED DAMPER C MOD 2 POS NORMALLY CLOSED NC DDC POINT IDENTIFIER ANALOG INPUT BINARY INPUT ANALOG OUTPUT BINARY OUTPUT -AI AO BI BO HIGH LIMIT HUMIDITY TRANSMITTER
SPACE THERMOSTAT
MOTOR
UNINTERUPTIBLE POWER SUPPLY (UPS)
DIRECT DIGITAL CONTROL PANEL (DDCP)
WORKSTATION/MONITOR PRESSURE INDICATOR
VARIABLE FREQUENCY DRIVE
OXYGEN DEPLETION SENSOR OS
END SWITCH
COUNTER BALANCE/GRAVITY BACKDRAFT DAMPER
IP68 22mm DIAMETER RED, YELLOW, OR GREEN LED STATUS INDICATORS
IP68 22mm DIAMETER KEY SWITCHES, KEYED ALIKE. "ON" TO THE RIGHT
DIGITAL PRESSURE, TEMPERATURE OR HUMIDITY INDICATION DEVICE
VISIBLE OXYGEN DEPLETION ALARM
AUDIBLE OXYGEN DEPLETION ALARM REFRIGERANT MONITOR
RM
AIRFLOW TEMPERATURE MEASURING DEVICE AIR MONITORING STATION
ROOM PRESSURE SENSOR LOW PRESSURE SWITCH
ABBREVIATIONS DEVICE DESIGNATIONS
SPS-X-X STATIC PRESSURE SENSOR DESIGNATION
V-X-X VALVE DESIGNATION
TEMPERATURE TRANSMITTER DESIGNATION TT-X-X
HT-X-X HUMIDITY TRANSMITTER DESIGNATION
D-X-X DAMPER DESIGNATION
CONTROLS SYMBOLS
DESCRIPTION
SYMBOL SYMBOL DESCRIPTION
DDCP UPS PI
N
N
Philadelphia, PA 19127
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-002
Mechanical Controls and
Instrumentation Legend
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
TEMPERATURE CONTROL NARRATIVES
A. GENERAL NOTES
1. THE CONTROL NARRATIVES DESCRIBE THE GENERAL OPERATIONAL INTENT OF THE CONTROL SYSTEMS. PROVIDE ALL HARDWARE, SOFTWARE, DEVICES, EQUIPMENT AND WIRING AS REQUIRED TO PERFORM THE OPERATIONAL INTENT DESCRIBED BY THE VARIOUS CONTROL NARRATIVES AND TO FULLY INTERFACE WITH THE BUILDING MANAGEMENT SYSTEM (BMS).
2. THE CONTROL DIAGRAMS INDICATE THE GENERAL ARRANGEMENT OF SYSTEM COMPONENTS TO THE EXTENT THAT THEY AFFECT PROCESS FLOW OR CONTROL. NOT ALL REQUIRED COMPONENTS ARE SHOWN ON THE CONTROL DIAGRAMS. FOR INSTANCE, EACH AIR HANDLING UNIT ONLY SHOWS ONE DISCHARGE ISOLATION DAMPER EVEN THOUGH MULTIPLE DAMPER SECTIONS AND/OR OPERATORS ARE REQUIRED BY THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
THOROUGHLY REVIEW ALL CONTRACT DOCUMENTS TO ASCERTAIN THE FULL SCOPE OF THEIR WORK.
3. UNLESS OTHERWISE NOTED, SIZE ALL AUTOMATIC CONTROL VALVES FOR MAXIMUM TEN (10) FEET WATER PRESSURE DROP AT THE MAXIMUM DESIGN FLOW RATE. 4. REFER TO DRAWINGS FOR LOCATIONS OF ALL TERMINAL UNITS, ROOM THERMOSTATS AND HUMIDISTATS, PANELS, DAMPERS, VALVES, AND EQUIPMENT; WHERE
SUCH DEVICES ARE NOT INDICATED, HOWEVER ARE REQUIRED BY THE CONTROL NARRATIVES TO ACHIEVE THE INTENDED OPERATION, THEY SHALL BE PROVIDED AND LOCATED IN THE FIELD WHERE DIRECTED BY THE ARCHITECT/ENGINEER.
5. THE FIRE ALARM SYSTEM PROVIDER SHALL PROVIDE ALL DETECTION DEVICES (HEAT/SMOKE) AS REQUIRED BY THE CONTRACT DOCUMENTS AND CODES AND REGULATIONS. THE MECHANICAL CONTRACTOR SHALL INSTALL ALL DETECTION DEVICES INCLUDING REQUIRED CONTROL AND POWER WIRING REQUIRED FOR MECHANICAL SYSTEMS. DETECTION DEVICES SHALL PROVIDE AUTOMATIC SHUTDOWN OF THE HVAC SYSTEMS IN ACCORDANCE WITH CODES AND REGULATIONS. 6. LOCAL AIR HANDLING UNIT DUCT MOUNTED SMOKE DETECTORS PROVIDED AS PART OF THE FIRE ALARM SYSTEM SHALL, ON THE DETECTION OF THE PRODUCTS OF
COMBUSTION, SHUTDOWN THE SUPPLY FAN. THESE DEVICES SHALL HAVE VOLT-FREE CONTACTS HARD WIRED BY THE CONTROLS CONTRACTOR IN THE MOTOR STARTER CIRCUIT TO SHUT DOWN THE SUPPLY AND RETURN FANS AND SEND AN ALARM SIGNAL TO THE BMS WHEN THEY ARE ACTIVATED.
7. ALL PUMPS AND FANS, AS INDICATED, SHALL BE PROVIDED WITH A DIFFERENTIAL PRESSURE SENSOR INSTALLED AROUND THE PUMP OR FAN. SENSOR SHALL PROVIDE STATUS INDICATION FOR PUMP OR FAN OPERATION. CURRENT TRANSDUCERS WITH VA MEMORY MAY BE USED INSTEAD OF DIFFERENTIAL PRESSURE SENSORS WHERE INDICATED OR NOTED.
8. ADJUSTABLE FREEZESTATS SHALL BE PROVIDED AT ALL PREHEAT COILS AND SHALL DE-ENERGIZE THEIR RESPECTIVE AIR HANDLING SYSTEM WHEN THEIR SETTING OF 35°F IS REACHED. FREEZESTATS FOR WATER COILS SHALL BE INSTALLED IN THE COIL LEAVING AIR STREAM. FREEZESTATS SHALL BE HARD WIRED IN THE MOTOR STARTER CIRCUIT AND SEND AN ALARM SIGNAL TO THE BMS WHEN THEY ARE ACTIVATED.
9. ALL TEMPERATURE, HUMIDITY, AND PRESSURE SETPOINTS SHALL BE FULLY ADJUSTABLE THROUGH THE BMS. FINAL SYSTEM SETPOINTS SHALL BE CONFIRMED THROUGH SYSTEM COMMISSIONING AND FIXED PRIOR TO BUILDING OCCUPANCY. THEREAFTER SETPOINTS SHALL BE ADJUSTABLE THROUGH THE BMS BY TRAINED MAINTENANCE STAFF.
10. ALL TWO POSITION DAMPERS AND VALVES SHALL BE PROVEN OPEN BY THE USE OF END SWITCHES WHERE INDICATED ON THE CONTROL SCHEMATICS. 11. ALL CONTROL DEVICES LOCATED WITHIN CHEMICAL OR MEDICAL GAS STORAGE AREAS SHALL BE SUITABLY RATED FOR EACH SPECIFIC APPLICATION.
12. REFER TO INDIVIDUAL INPUT/OUTPUT SUMMARY SCHEDULES FOR ADDITIONAL CONTROL DEVICES NOT SPECIFICALLY DESCRIBED IN THE CONTROL NARRATIVES. INPUT/OUTPUT SUMMARY SCHEDULES ARE MINIMUM REQUIREMENTS; PROVIDE ALL REQUIRED POINTS FOR COMPLETE OPERATION OF THE SYSTEMS.
13. ALL VARIABLE FREQUENCY DRIVES (VFD) FOR FANS AND PUMPS SHALL BE SOFT STARTED AT MINIMUM SPEED AND INCREASED TO REQUIRED OPERATING SPEED BY THE BMS.
14. EACH SUPPLY, RETURN, BOOSTER AND ISOLATION EXHAUST FAN SHALL BE EQUIPPED WITH AN INLET AIR MONITORING DEVICE (AMD), PROVIDE TWO FOR DWDI FANS. THE BMS SHALL CONTINUOUSLY MONITOR THE AIRFLOW RATE FOR EACH FAN. AMD'S FOR ISOLATION EXHAUST FANS SHALL BE OF A MATERIAL SUITABLE FOR THE INTENDED AIRSTREAM.
15. PROVIDE MANUAL ON/OFF KEY SWITCHES WITH INDICATING PILOT LIGHTS, FAN RELAYS AND WIRING TO ALL BUILDING FANS. KEY SWITCHES SHALL BE LOCATED ON A PANEL PROVIDED BY THE FIRE ALARM VENDOR. THE CONTROL CONTRACTOR MUST LIAISE WITH THE FIRE ALARM VENDOR AND ELECTRICAL CONTRACTOR TO COORDINATE THE REQUIREMENTS. SWITCHES SHALL OVERRIDE ALL SYSTEM SAFETIES TO ALLOW EMERGENCY OPERATION.
16. UPON FAILURE OF ANY DIRECT DIGITAL CONTROL (DDC) UNIT, AN ALARM SHALL BE INDICATED ON THE BMS AND THE SYSTEM SHALL AUTOMATICALLY REVERT TO THE DEFAULT CYCLE. ALL MOTORS AND SUPPLY/RETURN FANS SHALL REMAIN IN THEIR LAST COMMANDED STATE, AT WHICH TIME THE NORMAL SEQUENCE OF OPERATIONS SHALL RESUME FOR SELECTED FANS AND PUMPS ONCE THE DDC UNIT IS RESTORED TO SERVICE.
17. IN GENERAL, HEATING CONTROL VALVES SHALL FAIL OPEN, STEAM CONTROL VALVES SHALL FAIL CLOSED, CHILLED AND CONDENSER WATER CONTROL VALVES SHALL FAIL CLOSED. ISOLATION DAMPERS AT FANS AND AIR UNITS SHALL FAIL CLOSED.
18. STAND-BY COMPONENTS SUCH AS CONVERTORS, CHILLERS, COOLING TOWERS AND PUMPS SHALL BE ALTERNATED INTO OPERATION EVERY 500 HOURS. THE BMS SHALL ALARM FOR CHANGE OVER; ACTUAL CHANGE OVER SHALL BE INITIATED BY TRAINED MAINTENANCE PERSONNEL THROUGH THE BMS.
19. IN GENERAL, ALL HEADERED FANS AND PUMPS UNDER AUTOMATIC CONTROL SHALL START BEHIND CLOSED DAMPERS OR VALVES TO AN ADJUSTABLE SPEED OF 25 TO 30 HERTZ. WHEN THE VFD'S CONFIRM THIS SPEED THROUGH THE BMS ISOLATION DAMPERS/VALVES SHALL OPEN, WHEN END SWITCHES HAVE PROVEN
DAMPERS/VALVES OPEN THE RESPECTIVE FAN OR PUMP SHALL COME UNDER CONTROL AT REQUIRED OPERATIONAL SPEED. UNDER HAND OPERATION, DAMPER/VALVES SHALL REMAIN CLOSED UNTIL SPEED IS RAMPED TO 25 HERTZ. THE VFD SHALL NOT ALLOW IN EXCESS OF 25 HERTZ UNTIL RESPECTIVE END SWITCHES HAVE BEEN PROVEN OPEN. UNDER BYPASS CONDITIONS, DAMPER/VALVES SHALL OPEN VIA HARD WIRED RELAYS.
20. HVAC SYSTEM CONTROLS SHALL NOT FAIL AND LOCK OUT UPON LOSS OF TOTAL BUILDING POWER (SUCH AS UNDER EMERGENCY CONDITIONS WITH A MAJOR POWER OUTAGE) AND LOSS OF POWER SHALL NOT BE ALARMED TO THE BMS. THE CONTROLS CONTRACTOR SHALL PROVIDE LOCAL UPS UNITS FOR EACH CONTROL PANEL. IF POWER IS LOST TO INDIVIDUAL DEVICES TO THE BMS SHALL BE ALARMED FOR THE INDIVIDUAL COMPONENTS.
VD V D FD VD V D V D V D VD VD VD VD VD VD VD V D V D V D VD VD V D V D V D V D V D V D VD VD VD V D VD V D VD VD VD V D VD VD VD VD V D V D VD V D VD VD VD V D V D V D VD V D VD VD V D V D VD VD VD VD VD VD VD VD VD VD V D T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T VD V D V D V D VD VD V D V D VD V D VD VD VD VD VD V D V D V D V D VD V D V D VD V D VD V D VD V D VD VD V D V D V D V D T T T T T T T T T T T T V D VD V D T
M-502
M-101
1
M-501
M-101
3
6" EXHAUST VENT UP 302 150 302 150 14"x10" UP TO EF-3 301 50 6"x4" 301 501
4"Ø2
302 150 302 150 8"x6" 6"x4" 301 75 301 75 104 400 102 200 104 230 201 30 101 70 101 210 101110 102 125 102 125 101 25 101 150 14"x10" 101 170 101 100 101 100 201 25 201 20 201 20 201 20 202 130 102 130 12"x10" 12"x10" 6"Ø 6"Ø 4"Ø 6"Ø 8"x6" 6"x6" 4" Ø 4" Ø 4" Ø 4"Ø 4"Ø 4" Ø 4"Ø 8"x6" 12"x8" 12"x8" 6"Ø 6"Ø 12"x8" 46"x30" MANIFOLD CRAC-1 CRAC-2 40"x26" 14"x12" 14"x12" 108 1430 108 1430 108 1420 108 1430 108 1430 108 1430 108 1430 12"x8" 8"x8" 6"x4" 8"x8" 8"x8" 8" x6 " 12"x8" 12"x8" 6" Ø 4" Ø 204 375 101 70 101 70 101 70 201 70 201 70 20170 101 70 6" Ø 201 70 30"x14" 18"x12" 16"x10" 12"x8" 12"x8" 12"x8" 12"x8" 12"x8" 16 "x 10 " 12"x8" 36 "x 16 " 8"x6" 30"x14" 20"x12" 16 "x 12 " 16 "x 12 " 12 "x 8" 12"x8"12"x8" 12"x8" 12"x8" 104 420 104420 104420 104 420 104420 104400 30"x14" 14"x12" 18"x14" 14"x12" 18"x14" 12"x6" 206 560 205 570 104 425 104 425 104 425 104 425 16"x8" 104 425 104 425 104 425 104 425 12"x12" RETURN GRILLE3
CC-1 CC-2 CC-3 CC-4 CC-5 CC-6 CC-7 CC-8 CC-18 CC-17 CC-16 CC-15 CC-13 CC-9 CC-10 CC-14 CC-19 CC-20 CC-21 CC-22 CC-23 CC-24 CC-25 CC-26 CC-12 CC-29 CC-30 CC-31 CC-32 CC-34 CC-33 CC-40 CC-11 CC-28 CC-35 CC-36 CC-37 CC-38 CC-39 CC-41 CC-42 CC-45 CC-44 CC-43 14"x12" UP TO EF-2 8"x6" 301 50 DU-2 AC-1 16"x16" UP TO DOAS-4 DU-3 DU-4 DU-5 DU-6 104 480 104 480 104 480 104 480 104 480 104 480 EOC (48 WS) 123 TECH STOR. 150 OFFICE 142 COMMUNICATIONS CENTER 140 CLASSROOM/ PRESS 101 OFFICE 143 LOBBY 100 WOMEN'S RESTROOM R101 MEN'S RESTROOM R100 COPY/ FAX/ RECORD 140A KITCHENETTE 102 911 -I.D.F. 101B OPERATIONS 122 PLANNING 121 LOGISTICS 120 OFFICE 144 KITCHEN 130A DINING 130B VESTIBULE V-102 UNIVERSAL RESTROOM R102 UNIVERSAL RESTROOM R103 EQUIP. RACKS/ CRAC/ UPS 151 9-1-1 DIRECTOR 110I INNOVATION ROOM 115 COMM. OFFICE 110L COMM. OFFICE 110H COMM. OFFICE 110M COMM. OFFICE 110E COMM. OFFICE 110F COMM. OFFICE 110J COMM. OFFICE 110K EMA DIRECTOR 110C COMM. ADMIN 112 RECEPTION/ WAITING 110 EMA OFFICE 110A EMA OFFICE 110D ADMIN ASSIST./ RECEPTION 110B FITNESS 136 BREAK 130C CORRIDOR 135 BEDROOM 137C BEDROOM 137B BEDROOM 137A BEDROOM 137D COMM TRAINING/ SURGE (4WS) 141 QUIET ROOM 131 WOMEN'S RESTROOM R104 RESTROOMMEN'S R105 W/D 132 EOC STORAGE 154 RESTROOM/ SHOWER R133 RESTROOM/ SHOWER R134 KITCHENETTE 125 BREAKOUT 2 124 RECEPTION/ WAITING 114 CORRIDOR130 VESTIBULE V-100 TRAINING STORAGE 101A VESTIBULE V-101 CORRIDOR C-100 ELECTRICAL 155 CLASSROOM/ PRESS 1011
M-401 MECH/ PLUMB/ FIRE 152 CUST./ BUILDING MANAGER 153 AC-2 EA EC ED EF M EE H A B 8 7 9 11 13 E2 E3 E4 EB 6 E1 EG EH P Q L K J G F E D 1 2 2 3 4 5 C 10 12 14 N DVBF-1 206 560 206 560 205 570 16"x8" 206 560 302 130 302 80 301 70 8"x6" 6" x4 " 8"x4" 8"x4" 8"x4" 8"x4" 301 135 302 210 8"x4" 301 110 14"x10" UP TO EF-1 14"x10" 14 "x 10 " 12"x8" 10"x6" 10"x6" 10"x6" 8"x4" 8"x4" CC-47 302 230 CC-46 16"x14" 16 "x 14 " 12 "x 12 " 10"x6" MOD 12"x6"3
14"x10" 12"x8" 14"x6" 101 50 101 50 10"x6" 6"x4" 6" x4 " EUH-1M-501
M-101
1
M-501
M-101
2
12"x8" 12"x8" 12"x8" 12"x8" 12"x8" 12"x8" 12"x8" 12"x8"M-501
M-101
4
M-502
M-101
2
M-502
M-101
3
6"x4" 101 60 301 60 6"x4" 4"Ø 101 100 8"x4" 8"x4" 101120 8"x4" 6"Ø 6"x4" 6"Ø 6"Ø 6"Ø 12"x6" 8"x6" 6"Ø 4"Ø 8"Ø 6"Ø 12"x6"5
4
6
30"x14" 4"Ø 202 200 8"Ø6
16"x14" 8"x6" 10"x4" 12"x10" 12"x8" 30"x14"7
7
8
8
RA RA RA RA9
9
9
9
30"x14" 30"x14"10
10
10
10
10
DU-110
SA-1 SA-2 36 "x 16 "11
11
4"Ø 4"Ø 6"Ø 4"Ø 6" Ø 4"Ø 4"Ø 6" Ø 4"Ø 4"Ø6
4"Ø 4"Ø 4"Ø12
18"x14" 20"x12" 14 "x 12 " 20 "x 12 " 12"x8" CD C D 4"Ø 4"Ø 8"x4"13
13
8"x4" 6"x4" 6"x4" AC-3N
N
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-101
FIRST FLOOR PLAN
-HVAC
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
PROVIDE PREFINISHED DRYER VENT ON EXTERIOR WALL FOR DRYER VENT TERMINATION.1
PROVIDE 4"Ø DUCT DOWN AND CONNECT TO DRYER VENT CONNECTION. PROVIDE PRE-MANUFACTURED RECESSED DRYER CONNECTION BOX IN WALL.
2
0 SCALE: UNIT OF MEASURE: GRAPHIC SCALE 4 8 8 16 FEET 1/8" = 1'-0"PROVIDE 12"x12" RETURN GRILLE. MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 395 CFM.
3
1. ALL DUCTWORK SHALL BE INSTALLED AS TIGHT TO THE BOTTOM OF BEAMS AS POSSIBLE. CONTRACTOR SHALL UTILIZE BEAM POCKETS FOR DUCT CROSSES AS REQUIRED.
2. CONTRACTOR SHALL COORDINATE ALL HVAC, PLUMBING, HVAC PIPING, ELECTRICAL AND ALL EQUIPMENT BEFORE DUCT AND PIPING SYSTEMS ARE INSTALLED.
3. CONTRACTOR SHALL COORDINATE ALL DIFFUSERS AND VRF CASSETTES WITH ELECTRICAL LIGHTING.
SCALE: 1/8" = 1'-0"
1ST FLOOR HVAC DUCTWORK PLAN
MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 375 CFM.
4
MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 200 CFM.
5
PROVIDE 8"x4" O.E.D WITH WIRE MESH SCREEN. MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 100 CFM. CONTROL DAMPER SHALL BE TIED TO CLEAN AGENT FIRE SUPPRESSION PANEL. REFER TO CONTROL DRAWINGS FOR FURTHER DETAILS.
6
MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 1440 CFM.
7
MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 1250 CFM.
8
PROVIDE 40"x20" OED WITH WIRE MESH SCREEN.
9
PROVIDE SECONDARY CONDENSATE DRAIN PAN UNDER DUCT UNITS DU-1,2,3,4,5,6. PROVIDE SAFE-T SWITCH MODEL SS3 IN DRAIN PAN OR EQUAL. SAFE-T-SWITCH SHALL SHUT DOWN UNIT UPON DETECTION OF WATER.
10
PROVIDE 1/2" ARMAFLEX INTERIOR LINING ON RETURN DUCTWORK AND RETURN PLENUM FOR DUCTED UNITS DU-3,4,5,6.
11
CONTRACTOR SHALL PROVIDE FLEXIBLE DUCT CONNECTION IN 8"x6" EXHAUST DUCT BEFORE FIRE DAMPER IN RESTROOM CEILING.
12
MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 395 CFM.
VD VD V D V D V D VD V D VD VD V D V D VD VD VD VD VD VD VD VD VD V D V D V D V D T T T T T T T T T T T T V D VD V D T
M-502
M-101
1
M-501
M-101
3
EA EA EC ED EF M EE H A B 8 7 9 11 13 E2 E3 E4 EB 15 6 E1 EG EH P Q L K J G F E D 1 2 3 4 5 C 10 12 14 NM-501
M-101
1
M-501
M-101
2
M-502
M-101
2
M-502
M-101
3
6" EXHAUST VENT UP 104 420 104420 104420 104 420 104420 104400 206 560 205 570 104 425 104 425 104 425 104 425 104 425 104 425 104 425 104 425 CC-1 CC-2 CC-3 CC-4 CC-5 CC-6 CC-7 CC-8 CC-18 CC-17 CC-16 CC-15 CC-13 CC-9 CC-10 CC-14 CC-19 CC-20 CC-21 CC-22 CC-23 CC-24 CC-25 CC-26 CC-12 CC-29 CC-30 CC-31 CC-32 CC-34 CC-33 CC-40 CC-11 CC-28 CC-35 CC-36 CC-37 CC-38 CC-39 CC-41 CC-42 CC-45 CC-44 CC-43 DU-2 DU-3 DU-4 DU-5 DU-6 104 480 104 480 104 480 104 480 104 480 104 480 EOC (48 WS) 123 TECH STOR. 150 OFFICE 142 COMMUNICATIONS CENTER 140 CLASSROOM/ PRESS 101 OFFICE 143 WOMEN'S RESTROOM R101 MEN'S RESTROOM R100 COPY/ FAX/ RECORD 140A KITCHENETTE 102 911 -I.D.F. 101B OPERATIONS 122 PLANNING 121 LOGISTICS 120 OFFICE 144 KITCHEN 130A DINING 130B VESTIBULE V-102 UNIVERSAL RESTROOM R102 UNIVERSAL RESTROOM R103 EQUIP. RACKS/ CRAC/ UPS 151 9-1-1 DIRECTOR 110I INNOVATION ROOM 115 COMM. OFFICE 110L COMM. OFFICE 110H COMM. OFFICE 110M COMM. OFFICE 110E COMM. OFFICE 110F COMM. OFFICE 110J COMM. OFFICE 110K EMA DIRECTOR 110C COMM. ADMIN 112 RECEPTION/ WAITING 110 EMA OFFICE 110A EMA OFFICE 110D ADMIN ASSIST./ RECEPTION 110B FITNESS 136 BREAK 130C CORRIDOR 135 BEDROOM 137C BEDROOM 137B ? ? BEDROOM 137D COMM TRAINING/ SURGE (4WS) 141 QUIET ROOM 131 WOMEN'S RESTROOM R104 RESTROOMMEN'S R105 W/D 132 EOC STORAGE 154 RESTROOM/ SHOWER R133 RESTROOM/ SHOWER R134 KITCHENETTE 125 BREAKOUT 2 124 RECEPTION/ WAITING 114 CORRIDOR130 VESTIBULE V-100 TRAINING STORAGE 101A VESTIBULE V-101 CORRIDOR C-100 ELECTRICAL 155 CLASSROOM/ PRESS 101 CUST./ BUILDING MANAGER 153 206 560 206 560 205 570 206 560 CC-47 CC-46 BPI-2 BPI-1 BPI-4 BPI-3 BPI-6 BPI-5 CC-27 18"x14" DU-1 18"x14" 14"x12" 14"x12" 18"x14" 18"x14" 30"x14" 30"x14" 30"x14" 18"x12" 16"x10" 12 "x 8" 30"x14" 20"x12" 16 "x 12 " 16 "x 12 " 30"x14" 30"x14"2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
BPI-7BPI-7 BPI-7 BPI-7 BPI-7 BPI-7
BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7 BPI-7
1
BPI-71
BPI-71
BPI-7 BPI-7 BPI-7 BPI-7BPI-7 BPI-7 BPI-7 BPI-7
BPI-7 36 "x 16 " 36 "x 16 " 2100 ATMOS AIR 2100 2543 2543 CFM
DESIG SERVICE MAX TEMP (°F) ELEC. BASIS OF DESIGN REMARKS
150 120/1/60
150
TUBE SIZE (IN.)
10 BPI-1 DU-1 BPI-2 BPI-3 BPI-4 BPI-5 BPI-6 DU-2 DU-3 DU-4 DU-5 DU-6 10 15 15 15 15 200 200 200 200 WATTS 5 5 6 6 6 6 120/1/60 120/1/60 120/1/60 120/1/60 120/1/60 FC100 MATTERHORN 1002 ATMOS AIR MATTERHORN 1002 ATMOS AIR MATTERHORN 1002 ATMOS AIR MATTERHORN 1002 ATMOS AIR MATTERHORN 1002 ATMOS AIR
ADD ALTERNATE NO. 3 BIPOLAR IONIZATION SCHEDULE
2543 2543
77mm x 24mm x 9.5mm TURBULANT OR LAMINAR, 1 M/SEC
14°F - 158°F 12vDC +- 10% 20mA 5x10 ION/SEC ION OUTPUT : POWER SUPPLY: OPERATING TEMP: AIRFLOW: DIMENSIONS REMARKS :
SERVICE : VRF CEILING CASSETTE
BASIS OF DESIGN : STERIONIZER MODEL IWS-12-D1-AE OR EQUAL
INSTALLED IN SUPPLY DISCHARGE OF VRF CEILING CASSETTE. TYPICAL FOR ALL CASSETTES.
9
DESIGNATON : BPI-7
ADD ALTERNATE NO. 3 BIPOLAR IONIZATION CASSETTE DUTY
N
N
Philadelphia, PA 19127
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-101A
FIRST FLOOR PLAN
-HVAC ADD ALTERNATE 3
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
SCALE: 1/8" = 1'-0"
1ST FLOOR HVAC DUCTWORK - ADD ALTERNATE NO. 3
ADD ALTERNATE NO. 3 DRAWING NOTES:
CONTRACTOR SHALL PROVIDE STERIONIZER MODEL IWS-12-D1-AE BIOPOLOR IONIZATION MODEL OR EQUAL ON SUPPLY DISCHARGE OF ALL CEILING CASSETTES. MECHANICAL CONTRACTOR SHALL INSTALL IONIZATION MODULE IN SUPPLY DISCHARGE OF CEILING CASSETTE PER MANUFACTURERS RECOMMENDATIONS. IONIZATION DEVICE SHALL BE WIRED TO VRF CEILING CASSETTE TERMINAL BLOCK PER MANUFACTURERS
RECOMMENDATIONS.
1
ADD ALTERNATE NO. 3 GENERAL NOTES:
1. WORK ON THIS SHEET IS DUPLICATED FROM M-101 FOR VISUAL AND CLARIFICATION PURPOSES ONLY. CONTRACTOR SHALL PRICE BIPOLAR IONIZATION ELEMENTS ONLY AS PART OF ADD ALTERNATE NO. 3.
0 SCALE: UNIT OF MEASURE: GRAPHIC SCALE 4 8 8 16 FEET 1/8" = 1'-0"
CONTRACTOR SHALL PROVIDE ATMOS AIR BIOPOLOR IONIZATION SYSTEM IN DUCTED UNIT DU-1,2,3,4,5,6 RETURN DUCTWORK. REFER TO SCHEDULE FOR CAPACITY AND MODEL TYPE.
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
M-502
M-101
1
M-501
M-101
3
MCU MCU MCU MCU MCU DU-1 DU-2 DU-3 DU-5 RHR RS RL RHR RS RL MCU RHR RS RL MCU MCU MCU MCU MCU CRAC-1 CRAC-2 RL,RS,RHR UP TO HRU-1,2,3 RL,RS,RHR UP TO HRU-4 RL,RS,RHR UP TO HRU-5 RL,RS, UP TO DACCU-1, DACCU-2 CC-1 CC-2 CC-3 CC-4 CC-5 CC-6 CC-7 CC-8 CC-18 CC-17 CC-16 CC-15 CC-13 CC-9 CC-10 CC-14 CC-19 CC-20 CC-21 CC-22 CC-23 CC-24 CC-25 CC-26 CC-12 CC-29 CC-30 CC-31 CC-32 CC-34 CC-33 CC-35 CC-36 CC-37 CC-38 CC-39 CC-41 CC-42 CC-45 CC-44 CC-43 CC-40 CC-11 CC-281
AC-1 CC-46 CO2 CO2 CC-46 4" FD2
2
DINING 130B EOC (48 WS) 123 TECH STOR. 150 OFFICE 142 COMMUNICATIONS CENTER 140 CLASSROOM/ PRESS 101 OFFICE 143 LOBBY 100 WOMEN'S RESTROOM R101 MEN'S RESTROOM R100 COPY/ FAX/ RECORD 140A KITCHENETTE 102 911 -I.D.F. 101B OPERATIONS 122 PLANNING 121 LOGISTICS 120 OFFICE 144 KITCHEN 130A VESTIBULE V-102 UNIVERSAL RESTROOM R102 UNIVERSAL RESTROOM R103 EQUIP. RACKS/ CRAC/ UPS 151 CUST./ BUILDING MANAGER 153 MECH/ PLUMB/ FIRE 152 9-1-1 DIRECTOR 110I INNOVATION ROOM 115 COMM. OFFICE 110L COMM. OFFICE 110H COMM. OFFICE 110M COMM. OFFICE 110E COMM. OFFICE 110F COMM. OFFICE 110J COMM. OFFICE 110K EMA DIRECTOR 110C COMM. ADMIN 112 RECEPTION/ WAITING 110 EMA OFFICE 110A EMA OFFICE 110D ADMIN ASSIST./ RECEPTION 110B FITNESS 136 BREAK 130C CORRIDOR 135 BEDROOM 137C BEDROOM 137B BEDROOM 137A BEDROOM 137D COMM TRAINING/ SURGE (4WS) 141 QUIET ROOM 131 WOMEN'S RESTROOM R104 MEN'S RESTROOM R105 W/D 132 EOC STORAGE 154 RESTROOM/ SHOWER R133 RESTROOM/ SHOWER R134 KITCHENETTE 125 BREAKOUT 2 124 RECEPTION/ WAITING 114 CORRIDOR 130 VESTIBULE V-100 TRAINING STORAGE 101A VESTIBULE V-101 CORRIDOR C-100 ELECTRICAL 155 CLASSROOM/ PRESS 101 ELECTRICAL 102A EA EC ED EF M EE H A B 8 7 9 11 13 E2 E3 E4 EB 6 E1 EG EH P Q L K J G F E D 1 2 3 4 5 C 10 12 14 N CD CD CD C D CD CD CD CD CO22
M-401 1" CD UP/ DN REFER TO P-100 FOR CONTINUATION CD CD CD CD3
DU-63
3
DU-43
3
3
CD C D C D 1" 12"x12"x12" CATCH BASIN (TYP) 12"x12"x12" CATCHBASIN (TYP) 12"x12"x12" CATCH
BASIN (TYP) 1" 12"x12"x12" CATCH BASIN (TYP) 2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 3/4" 1" 1" 3/4" 1" 3/4" 1" 3/4" 3/4" 1" 1" 2" 3/4" 3/4"
M-501
M-101
1
M-501
M-101
2
M-501
M-101
4
M-502
M-101
2
M-502
M-101
3
CD C D C D 1/2" 1/2" 3/4" 1" 3/4" 1/2" 1/2" 1/2" 1" 1" 1" 1/2" 1/2" 1" 1/2"4
CO24
4
4
RL/ RS TO FROM ACCU-2 AC-2 RL, RS TO FROM ACCU-15
1/2" 1" C D6
MCU CO CO CO CO CO 1" CD 1" CD CD 1" 3/4"N
N
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-201
FIRST FLOOR PLAN
-HVAC PIPING
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN HVAC PIPING
GENERAL NOTES:
1. VRF SYSTEM LAYOUT IS FOR GRAPHIC PURPOSES ONLY. FINAL LAYOUT FOR VRF SYSTEM, EQUPMENT, PIPING AND ALL ASSOCIATED VALVE AND TRIM SHALL BE PER MANUFACTURERS RECOMMENDATIONS. FINAL LAYOUT, PIPING LENGTHS AND ALL EQUIPMENT SHALL BE VERIFIED BEFORE ANY EQUIPMENT AND PIPING IS PURCHASED.
2. CONTRACTOR SHALL COORDINATE HVAC, HVAC PIPING, PLUMBING, CONDENSATE AND PROVIDE A COORDINATED DRAWING BEFORE ANY DUCTWORK AND PIPING SYSTEMS ARE INSTALLED. ALL UTILTIES SHALL BE AS TIGHT TO STRUCTURAL AS POSSIBLE.
0 SCALE: UNIT OF MEASURE: GRAPHIC SCALE 4 8 8 16 FEET 1/8" = 1'-0"
DRAWING NOTES:
CONTRACTOR SHALL PROVIDE 2 HR RATED FIRE PROOF WALL PENTRATION PER ICC 500. REFER TO FIRE RESISTANT PIPE PENETRATION FOR FURTHER DETAILS.
1
3. ALL VRF CEILING CASSETTES CC-X HAVE INTEGRAL CONDENATE PUMP. EACH CASSETTE SHALL HAVE 3/4" CONDENSATE DRAIN PUMPED UP TO A MAXIMUM OF 20" AND SHALL BE GRAVITY DRAINED TO A COMMON HEADER AND DRAINED OPENSITE TO GRADE.
CONTRACTOR SHALL PROVIDE 1" CONDENSATE DRAIN FROM CRAC-1 AND CRAC-2 AND TERMINATE WITH INDIRECT CONNECTION AT 4" FLOOR DRAIN AT EXTERIOR WALL.
2
CONTRACTOR SHALL PROVIDE CONDENSATE DRAIN PAN UNDER DUCTED VRF UNITS DU-1,2,3,4,5,6. PROVIDE SAFETY FLOAT SWITCH IN CONDENSATE DRAIN PAN UNDER EACH UNIT. SAFETY FLOAT SWITCH SHALL DE-ENERGIZE UNITS IF WATER IS DETECTED IN THE DRAIN PAN AND ALARM BAS.
3
CONTRACTOR SHALL MOUNT CO2 SENSOR APPROXIMATELY 5'-0" AFF. CO2 SENSOR LOCATION SHALL BE COORDINATE WITH THERMOSTAT, ELECTRICAL SWITCHES, OUTLETS AND ANY OTHER WALL HANGING EQUIPMENT. CO2 SENSOR SHALL BE VAISALA MODEL GMW80 SERIES CARBON DIOXIDE MODEL OR EQUAL.
4
4. ALL REFRIGERANT PIPING FOR VRF SYSTEMS AND DX AC UNITS SHALL BE SIZED, ROUTED AND INSTALLED PER MANUFACTURERS RECOMMENDATIONS.
CONTRACTOR SHALL TIE 1" CD FROM DU-1 AND CC-46 INTO SW-1 4" STORM WATER PIPE.
5
CONTRACTOR SHALL TIE 1" CD FROM DU-2 AND CC-1 INTO SW-2 4" STORM WATER PIPE.
T T T T T T T T T EA EC ED EF M EE H 11 13 E2 E3 E4 EB 15 E1 EG EH L K J G F E D 10 12 14 N EOC (48 WS) 123 TECH STOR. 150 OFFICE 142 COMMUNICATIONS CENTER 140 OFFICE 143 OPERATIONS 122 PLANNING 121 LOGISTICS 120 OFFICE 144 UNIVERSAL RESTROOM R102 UNIVERSAL RESTROOM R103 EQUIP. RACKS/ CRAC/ UPS 151 CUST./ BUILDING MANAGER 153 MECH/ PLUMB/ FIRE 152 COMM TRAINING/ SURGE (4WS) 141 KITCHENETTE 125 BREAKOUT 2 124 CORRIDOR C-100 ELECTRICAL 155 1" CD UP REFER TO M-201 FOR CONTINUATION
1
1
1
1
1
1
1
2
1
LEAK DETECTIONPANEL1" CD UNDER RAISED FLOOR 2" CD, REFER TO CIVIL FOR CONTINUATION 1" 2"
N
N
Philadelphia, PA 19127
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-202
FIRST FLOOR PLAN
HVAC PIPING
-UNDERFLOOR
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
SCALE: 1/8" = 1'-0"
FIRST FLOOR HVAC PIPING - UNDER FLOOR
DRAWING NOTES:
CONTRACTOR SHALL PROVIDE TRACETEK LEAK DETECTION MONITORING SYSTEM OR EQUAL FOR 911 OPERATIONS SIDE OF THE BUILDING. LEAK DETECTION MONITOR SHALL BE INSTALLED ON WALL UNDER TV'S IN COMMUNICATIONS 140. LEAK DETECTION CABLING SHALL BE ROUTED UNDER FLOOR PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION PROCEDURES. A COMPLETE SYSTEM LAYOUT SHALL BE PROVIDED BY THE SUPPLIER AS PART OF THE SHOP DRAWING SUBMITTALS.
1
GENERAL NOTES:
1. ALL LEAK DETECTION CABLING SHOWN ON THIS PLAN IS LOCATED UNDER FLOOR RAISED FLOOR.
LEAK DETECTION PANEL SHALL BE HARDWIRED BACK TO FLOOR LEVEL NETWORK CONTROLLER. PROVIDE ALARM POINT FROM LEAK DETECTION PANEL TO BAS.
2
0 SCALE: UNIT OF MEASURE: GRAPHIC SCALE 4 8 8 16 FEET 1/8" = 1'-0"3
PROVIDE CLEANOUT AT TOP OF CONDENSATE RISER.
DOAS-3 DOAS-2 DOAS-1 EF-3 DOAS-4 DACCU-1 DACCU-2 RS,RL RHR DN RS,RL RHR DN RS,RL DN RS,RL DN HRU-1 HRU-2 HRU-4 HRU-5 EF-2 ACCU-1 HRU-3 RD-9 RD-8
1
1
1
2
ACCU-2 EA EC ED EF M EE H A B 8 7 9 11 13 E2 E3 E4 EB 15 6 E1 EG EH P Q L K J G F E D 1 2 3 4 5 C 10 12 14 N EF-1 6" DIA EXHAUST VENT W/ GOOSNECK AND BIRDSCREEN RL, RS DN TO ACU-1 IN IDF 101B RL, RS DN TO AC-2 IN ELECTRICAL 155 SOLAR DOMESTIC WATERHEATING PANELS. GROSS SURFACE 166 SQ. FT. RD-10 1" CD 1" CD
1
C D 1" RD-8 RL, RS DN TO ACU-3 IN IDF 101B ACCU-33
N
N
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-301
MECHANICAL ROOF
PLAN
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
SCALE: 1/8" = 1'-0"
MECHANICAL ROOF PLAN
0 SCALE: UNIT OF MEASURE: GRAPHIC SCALE 4 8 8 16 FEET 1/8" = 1'-0"
DRAWING NOTES:
1
CONTRACTOR SHALL ROUTE CONDENSATE FROM DOAS-1,2,3 ON ROOF AND TERMINATE WITH INDIRECT CONNECTION AT ROOF DRAIN RD-9.2
CONTRACTOR SHALL ROUTE CONDENSATE FROM DOAS-4 ON ROOF AND TERMINATE WITH INDIRECT CONNECTION AT ROOF DRAIN RD-83
CONTRACTOR SHALL INSTALL SOLAR PANELS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. SOLAR MANUFACTURER SHALL DETERMINE EXACT LOCATION, ANGLE AND HEIGHT OFF OF ROOF TO ACHIEVE OPTIMUM SOLAR GAINS FROM THE PANELS.FD T F D F D V D V D VD FD VD T
M-502
M-101
1
REFER TO M-101 FOR CONTINUATION EUH-1 CC-27 14"x12" 14"x12" 14 "x 12 " 14"x12" REFER TO M-101 FOR CONTINUATION 16 "x 14 " 16"x14" UP TO DOAS-3 14"x12" RA UP TO DOAS-2 14"x12" SA UP TO DOAS-2 14"x12" RA UP TO DOAS-1 14"x12" SA UP TO DOAS-1 MECH/ PLUMB/ FIRE 152 CUST./ BUILDING MANAGER 153 REFER TO M-101 FOR CONTINUATION M 13 E2 E1 EG EH 14 N 8"x4" 4"Ø 8"x4" 14"x 12"1
2
3
PLUMB/MECH/ FIRE 152 CUST./ BUILDING MANAGER 153 4" 3/4" 1 1/2" 2 1/2" 3/4" 3/4" CC-27 1/2" CD DN TO P-7 W/ INDIRECT CONNECTION HB DWH-1 SWST-1 SWST-2 RCP-3 RCP-1 RCP-2 4" REDUCED FLOW BACKFLOW PREVENTER 4" DCW DN, REFER TO P-100 FOR CONTINUATION CLEAN AGENT FIRE SUPPRESSION SYSTEM 3/4" REFER TO SHEET F-101 FOR CONTINUATION REFER TO SHEET P-201 FOR CONTINUATION REFER TO SHEET F-101 FOR CONTINUATION 6" F DN, REFER TO P-100 FOR CONTINUATION 6" REDUCED FLOW BACKFLOW PREVENTER P-7 4" SW DN,REFER TO P-100 FOR CONTINUATION 4" 6" REFER TO SHEET P-201 FOR CONTINUATION CO 2" 2" REFER TO SHEET F-101 FOR CONTINUATION M E2 E1 EG EH 14 N 4"FD 4" UP TO RD-9 F.D. SIAMESE CONNECTION 6" 4" MAIN DRAIN TERMINATION 2" D 2" D 2" D 2" HB TPS-12
4" UP TO RD-9N
N
Philadelphia, PA 19127
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-401
MECHANICAL ROOM
PART PLANS
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
0 SCALE: UNIT OF MEASURE: GRAPHIC SCALE 2 4 4 8 FEET 1/4" = 1'-0"SCALE: 1/4" = 1'-0"
M-401 M-101MECHANICAL ROOM PART PLAN - HVAC
1
SCALE: 1/4" = 1'-0"
M-401 F-101
MECHANICAL ROOM PART PLAN - PIPING
2
GENERAL NOTES:
1. REFER TO SANITARY/ VENT RISER DIAGRAM FOR ALL PIPE SIZES.
2. ALL SANITARY/ VENT PIPING SHALL BE SLOPED A MINIMUM 1/8" PER FOOT. ALL SANITARY AND VENT PIPING 2 1/2" AND SMALLER SHALL BE SLOPED 1/4" PER FOOT.
3. ALL CONDENSATE DRAIN PIPING SHALL BE ROUTED A MINIUM OF 1/8" PER FOOT.
DRAWING NOTES:
PROVIDE 4" FUNNEL DRAIN AT WALL. CONDENSATE FROM VRF CASSETTES SHALL BE ON WALL AND TERMINATED AT FUNNEL DRAIN WITH INDIRECT CONNECTION.
1
DRAWING NOTES:
PROVIDE FLEXIBLE DUCT CONNECTION IN MECHANICAL ROOM BEFORE FIRE DAMPER IN 16"x14" DUCT MAIN.
1
PROVIDE 8"x4" OPEN ENDED DUCT WITH WIRE MESH SCREEN. MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 100 CFM.
2
PROVIDE TRAP PRIMING STATION MODEL PPP PRIME-TIME TRAP PRIMING ASSEMBLY PTS-6OR EQUAL. CONTRACTOR SHALL PROVIDE 1/2" TRAP PRIMING LINES FROM TPS-1 TO MECHANICAL ROOM 152 FLOOR DRAIN AND FLOOR DRAINS UNDER THE RAISED FLOOR IN THE COMMS AND EOC AREAS OF THE BUILDING.
2
MANUAL VOLUME DAMPER SHALL BE BALANCED FOR 100 CFM.
First Level
0' - 0"
T.O.F.
-2' - 8"
HIGH ROOF LEVEL 22' - 0" E2 E3 E4 12"x8" 16"x36" 8"x12" 104 420 104400 16"x36" 1" CD 8"x12" 10"x16" 14"x30" 14"x30" DU-4 DU-4 RL, RS, RHR VD VD VD 1" CD 4" SW EOC (48 WS) 123
First Level
0' - 0"
T.O.F.
-2' - 8"
HIGH ROOF LEVEL
22' - 0"
T.O.F.
-2' - 8"
HIGH ROOF LEVEL
22' - 0"
E2 E3 E4 COMMUNICATIONS CENTER 140 104 480 104 480 104 480 Ø 12" 12"Ø 12"Ø 16"x36" DU-6 DU-5 14"x30" MCU 12"x10" 12"x10" RL,RS,RLR RL,RS,RLR VD VD VD 18"x18" 18"x18" 1" CD 1" CD RL,RS,RLR LEAK DETECTION SYSTEM PIPINGFirst Level
0' - 0"
HIGH ROOF LEVEL
22' - 0"
1 2 3 4 5 8"x12" 8"x12" Ø 12" Ø 12" 12"Ø 8"x12" 14"x12" 18"x14" Ø 12" 16"x8" 16"Ø 16"x8" 16"Ø VD VD VD VD VD VD 14"x12" 18"x14" 104 425 104 425 206 560 104425 104425 206560 CLASSROOM/ PRESS 101 CLASSROOM/ PRESS 101First Level
0' - 0"
LOW ROOF LEVEL
14' - 8"
HIGH PARAPET 23' - 4" 11 13 E1 10 DOAS-4 ACCU-1 RD-8 OD-8 RD-3 OD-3 102 200 6"x10" 18"x14" 18"x14" 14"x16" 14"x10" 3" 3" 16"x16" 3/4" DCW RL,RS,RLR 3" 3" DU-2 CC-1 104 400 3/4" DCW 1/2" DHWR 1/2" DWH RL,RS,RLR 1 1/2" V 12"x12" 14"x6" 12"x12" VESTIBULE V-100 LOBBY 100 VESTIBULE V-101 DU-1 ACCU-3N
N
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-501
MECHANICAL SECTIONS
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
SCALE: 1/4" = 1'-0"
M-501 M-101
MECHANICAL SECTION - EOC 123
1
SCALE: 1/4" = 1'-0"
M-501 M-101
MECHANICAL SECTION - COMMUNICATIONS 140
2
SCALE: 1/4" = 1'-0"
M-501 M-101
MECHANICAL SECTION - CLASSROOM/ PRESS 101
3
0 SCALE: UNIT OF MEASURE: GRAPHIC SCALE 2 4 4 8 FEET 1/4" = 1'-0"SCALE: 1/4" = 1'-0"
M-501 M-101MECHANICAL SECTION - LOBBY 100
First Level
0' - 0"
T.O.F.
-2' - 8"
LOW ROOF LEVEL
14' - 8"
LOW ROOF LEVEL 14' - 8" 13 E1 14 E2 E3 ELECTRICAL 155 MECH/ PLUMB/ FIRE 152 14"x10" 12"x14" 12"x14" 4" DWH-1 SWST-1 SWST-2 2" DHW 2" DHW EUH-1 4" F 3/4" DHWR 1 1/2" DWH 2 1/2" DCW RD-9 CO AC-2 2" CD 4" 4" 4" 14"x10" RL,RS 1/2" DCW,DHW RCP-3 RCP-2 2" DHW TO/ FROM SOLAR WATER PANELS 2" DCW 2" DHW 3/4" DHWR
DOAS-3 DOAS-2 DOAS-1
4" F RD-10 1" CD FROM DOAS-1 1" CD FROM DOAS-2,3 ACCU-2 4"
First Level
0' - 0"
LOW ROOF LEVEL
14' - 8"
T.O.F.
-2' - 8"
LOW ROOF LEVEL 14' - 8" 13 E1 14 E2 E3 E4 30"x40" 26"x40" 30"x46" DUCT MANIFOLD VD VD VD VD VD VD DACCU-1
HRU-1 HRU-2 HRU-3
CRAC-1 1" CD FROM CRAC-1 TO FLOOR DRAIN W/ INDIRECT CONNECTION 4"FD 4" 22"x22" 108 22"x22" 1430 1430108 1430108 1430108 1430108 1430108 1420108 22"x22" 22"x22" 22"x22" 22"x22" 22"x22" VD RL,RS MCU MCU RD-8 1" CD CC-29 4"Ø CC-30 RS,RL,RHR TO CC-29, CC-32, CC-34 RS,RL,RHR TO CC-30, CC-31, CC-33 1 1/4" DCW 1 1/4" DWH 3/4" DHWR 14"x12" RL,RS,RLR TO VRF SYSTEM 2" V OFFICE 144 COMMUNICATIONSCENTER 140 EQUIP. RACKS/ CRAC/ UPS 151 RS,RL,RHR TO ADMIN VRF SYSTEM 2" 4" LEAK DETECTION PIPING
First Level
0' - 0"
8 7 9 6 RD-6 6" 6" SD FROM OD-6 6" SD FROM RD-6 CC-20 1/2" CD 3/4" CD 1/2" MCU 101 170 4"x10" 8"x6" 4"Ø RS,RL TO CC-20 KITCHEN 130AN
N
Philadelphia, PA 19127
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-502
MECHANICAL SECTIONS
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
SCALE: 1/4" = 1'-0"
M-502 M-101
MECHANICAL SECTION - MECHANICAL ROOM 152
1
0 SCALE: UNIT OF MEASURE: GRAPHIC SCALE 2 4 4 8 FEET 1/4" = 1'-0"SCALE: 1/4" = 1'-0"
M-502 M-101MECHANICAL SECTION - EQUIPMENT/ RACKS 151
2
SCALE: 1/4" = 1'-0"
M-502 M-101
MECHANICAL SECTION - KITCHEN 130A
XX CONTROL AND INSTRUMENTATION LEGEND
H AMD CT DPT PT- HT- TT-DPS M PT M SD FZ- D- SP S- BFM- V- P-SYSTEM HLHT-T SIGNAL TYPE (AI,BI,AO,BO) POINT NUMBER M VFD ES BDD ATMD AMS LPS SPACE HUMIDISTAT TEMPERATURE TRANSMITTER DUCT OR PIPE THERMOMETER
CURRENT TRANSDUCER
PRESSURE GAGE WITH BALL VALVE PRESSURE TRANSMITTER HUMIDITY TRANSMITTER MAGNAHELIC GAGE METER PRESSURE TRANSMITTER FREEZESTAT SMOKE DETECTOR
CONTROL OR ISOLATION DAMPER
MANUAL SWITCH - START/STOP, FAN SPEED, OCCUPIED/UNOCCUPIED
BUILDING FLOW METER
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
AIR MONITORING DEVICE WITH PRESSURE TRANSMITTER
DIFFERENTIAL PRESSURE SWITCH OR SENSOR
STATIC PRESSURE SENSING STATION DIFFERENTIAL PRESSURE TRANSMITTER
COIL OR DOMESTIC WATER CIRCULATION PUMP
INDICATION INPUT POINT
NORMALLY OPEN
NORMALLY OPEN CONTACT
NO
COMMON
TWO POSITION
MOTOR OPERATED DAMPER C MOD 2 POS NORMALLY CLOSED NC DDC POINT IDENTIFIER ANALOG INPUT BINARY INPUT ANALOG OUTPUT BINARY OUTPUT -AI AO BI BO HIGH LIMIT HUMIDITY TRANSMITTER
SPACE THERMOSTAT
MOTOR
UNINTERUPTIBLE POWER SUPPLY (UPS)
DIRECT DIGITAL CONTROL PANEL (DDCP)
WORKSTATION/MONITOR PRESSURE INDICATOR
VARIABLE FREQUENCY DRIVE
OXYGEN DEPLETION SENSOR OS
END SWITCH
COUNTER BALANCE/GRAVITY BACKDRAFT DAMPER
IP68 22mm DIAMETER RED, YELLOW, OR GREEN LED STATUS INDICATORS
IP68 22mm DIAMETER KEY SWITCHES, KEYED ALIKE. "ON" TO THE RIGHT
DIGITAL PRESSURE, TEMPERATURE OR HUMIDITY INDICATION DEVICE
VISIBLE OXYGEN DEPLETION ALARM
AUDIBLE OXYGEN DEPLETION ALARM REFRIGERANT MONITOR
RM
AIRFLOW TEMPERATURE MEASURING DEVICE AIR MONITORING STATION
ROOM PRESSURE SENSOR LOW PRESSURE SWITCH
ABBREVIATIONS DEVICE DESIGNATIONS
SPS-X-X STATIC PRESSURE SENSOR DESIGNATION
V-X-X VALVE DESIGNATION
TEMPERATURE TRANSMITTER DESIGNATION TT-X-X
HT-X-X HUMIDITY TRANSMITTER DESIGNATION
D-X-X DAMPER DESIGNATION
CONTROLS SYMBOLS
DESCRIPTION
SYMBOL SYMBOL DESCRIPTION
DDCP UPS PI
N
N
p: 215 482 7440
f: 215 482 7441
www.sgarc.com
Consultants:
Professional Seal:
Owner:
Drawing Title:
Drawing Number:
DATE:
SG PROJECT NUMBER:
ISSUED FOR:
NO. DESCRIPTION DATE
True
Project
N
ew
C
on
st
ru
ct
io
n
of
:
Key Plan:
57 Grant Drive, Suite E
Pittsboro, NC 27312
p: 919 533 6472
www.mhaworks.com
Civil: MEP: Structural Engineer:WITHERSRAVENEL
115 Mackenan Drive
Cary, NC 27511
(919) 469-3340
RMF ENGINEERING
5520 Research Park, Suite 300
Baltimore, MD 21228
(410) 576-0505
153 East King Street, Suite 211-212
Lancaster, PA 17602
(717) 299-8965
SCHRADERGROUP
M-601
MECHANICAL
CONTROLS
C
ha
th
am
C
ou
nt
y
E
m
er
ge
nc
y
O
pe
ra
tio
ns
a
nd
C
om
m
un
ic
at
io
ns
C
en
te
r
11
2
In
no
va
tio
n
W
ay
P
itt
sb
or
o,
N
C
2
73
12
02/08/2021
19-027
ISSUED FOR CONSTRUCTION
Chatham County, NC
A. GENERAL NOTES1. THE CONTROL NARRATIVES DESCRIBE THE GENERAL OPERATIONAL INTENT OF THE CONTROL SYSTEMS. PROVIDE ALL HARDWARE, SOFTWARE, DEVICES, EQUIPMENT AND WIRING AS REQUIRED TO PERFORM THE OPERATIONAL INTENT DESCRIBED BY THE VARIOUS CONTROL NARRATIVES AND TO FULLY INTERFACE WITH THE BUILDING MANAGEMENT SYSTEM (BMS).
2. THE CONTROL DIAGRAMS INDICATE THE GENERAL ARRANGEMENT OF SYSTEM COMPONENTS TO THE EXTENT THAT THEY AFFECT PROCESS FLOW OR CONTROL. NOT ALL REQUIRED COMPONENTS ARE SHOWN ON THE CONTROL DIAGRAMS. FOR INSTANCE, EACH AIR HANDLING UNIT ONLY SHOWS ONE DISCHARGE ISOLATION DAMPER EVEN THOUGH MULTIPLE DAMPER SECTIONS AND/OR OPERATORS ARE REQUIRED BY THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
THOROUGHLY REVIEW ALL CONTRACT DOCUMENTS TO ASCERTAIN THE FULL SCOPE OF THEIR WORK.
3. UNLESS OTHERWISE NOTED, SIZE ALL AUTOMATIC CONTROL VALVES FOR MAXIMUM TEN (10) FEET WATER PRESSURE DROP AT THE MAXIMUM DESIGN FLOW RATE. 4. REFER TO DRAWINGS FOR LOCATIONS OF ALL TERMINAL UNITS, ROOM THERMOSTATS AND HUMIDISTATS, PANELS, DAMPERS, VALVES, AND EQUIPMENT; WHERE
SUCH DEVICES ARE NOT INDICATED, HOWEVER ARE REQUIRED BY THE CONTROL NARRATIVES TO ACHIEVE THE INTENDED OPERATION, THEY SHALL BE PROVIDED AND LOCATED IN THE FIELD WHERE DIRECTED BY THE ARCHITECT/ENGINEER.
5. THE FIRE ALARM SYSTEM PROVIDER SHALL PROVIDE ALL DETECTION DEVICES (HEAT/SMOKE) AS REQUIRED BY THE CONTRACT DOCUMENTS AND CODES AND REGULATIONS. THE MECHANICAL CONTRACTOR SHALL INSTALL ALL DETECTION DEVICES INCLUDING REQUIRED CONTROL AND POWER WIRING REQUIRED FOR MECHANICAL SYSTEMS. DETECTION DEVICES SHALL PROVIDE AUTOMATIC SHUTDOWN OF THE HVAC SYSTEMS IN ACCORDANCE WITH CODES AND REGULATIONS. 6. LOCAL AIR HANDLING UNIT DUCT MOUNTED SMOKE DETECTORS PROVIDED AS PART OF THE FIRE ALARM SYSTEM SHALL, ON THE DETECTION OF THE PRODUCTS OF
COMBUSTION, SHUTDOWN THE SUPPLY FAN. THESE DEVICES SHALL HAVE VOLT-FREE CONTACTS HARD WIRED BY THE CONTROLS CONTRACTOR IN THE MOTOR STARTER CIRCUIT TO SHUT DOWN THE SUPPLY AND RETURN FANS AND SEND AN ALARM SIGNAL TO THE BMS WHEN THEY ARE ACTIVATED.
7. ALL PUMPS AND FANS, AS INDICATED, SHALL BE PROVIDED WITH A DIFFERENTIAL PRESSURE SENSOR INSTALLED AROUND THE PUMP OR FAN. SENSOR SHALL PROVIDE STATUS INDICATION FOR PUMP OR FAN OPERATION. CURRENT TRANSDUCERS WITH VA MEMORY MAY BE USED INSTEAD OF DIFFERENTIAL PRESSURE SENSORS WHERE INDICATED OR NOTED.
8. ADJUSTABLE FREEZESTATS SHALL BE PROVIDED AT ALL PREHEAT COILS AND SHALL DE-ENERGIZE THEIR RESPECTIVE AIR HANDLING SYSTEM WHEN THEIR SETTING OF 35°F IS REACHED. FREEZESTATS FOR WATER COILS SHALL BE INSTALLED IN THE COIL LEAVING AIR STREAM. FREEZESTATS SHALL BE HARD WIRED IN THE MOTOR STARTER CIRCUIT AND SEND AN ALARM SIGNAL TO THE BMS WHEN THEY ARE ACTIVATED.
9. ALL TEMPERATURE, HUMIDITY, AND PRESSURE SETPOINTS SHALL BE FULLY ADJUSTABLE THROUGH THE BMS. FINAL SYSTEM SETPOINTS SHALL BE CONFIRMED THROUGH SYSTEM COMMISSIONING AND FIXED PRIOR TO BUILDING OCCUPANCY. THEREAFTER SETPOINTS SHALL BE ADJUSTABLE THROUGH THE BMS BY TRAINED MAINTENANCE STAFF.
10. ALL TWO POSITION DAMPERS AND VALVES SHALL BE PROVEN OPEN BY THE USE OF END SWITCHES WHERE INDICATED ON THE CONTROL SCHEMATICS. 11. ALL CONTROL DEVICES LOCATED WITHIN CHEMICAL OR MEDICAL GAS STORAGE AREAS SHALL BE SUITABLY RATED FOR EACH SPECIFIC APPLICATION.
12. REFER TO INDIVIDUAL INPUT/OUTPUT SUMMARY SCHEDULES FOR ADDITIONAL CONTROL DEVICES NOT SPECIFICALLY DESCRIBED IN THE CONTROL NARRATIVES. INPUT/OUTPUT SUMMARY SCHEDULES ARE MINIMUM REQUIREMENTS; PROVIDE ALL REQUIRED POINTS FOR COMPLETE OPERATION OF THE SYSTEMS.
13. ALL VARIABLE FREQUENCY DRIVES (VFD) FOR FANS AND PUMPS SHALL BE SOFT STARTED AT MINIMUM SPEED AND INCREASED TO REQUIRED OPERATING SPEED BY THE BMS.
14. EACH SUPPLY, RETURN, BOOSTER AND ISOLATION EXHAUST FAN SHALL BE EQUIPPED WITH AN INLET AIR MONITORING DEVICE (AMD), PROVIDE TWO FOR DWDI FANS. THE BMS SHALL CONTINUOUSLY MONITOR THE AIRFLOW RATE FOR EACH FAN. AMD'S FOR ISOLATION EXHAUST FANS SHALL BE OF A MATERIAL SUITABLE FOR THE INTENDED AIRSTREAM.
15. PROVIDE MANUAL ON/OFF KEY SWITCHES WITH INDICATING PILOT LIGHTS, FAN RELAYS AND WIRING TO ALL BUILDING FANS. KEY SWITCHES SHALL BE LOCATED ON A PANEL PROVIDED BY THE FIRE ALARM VENDOR. THE CONTROL CONTRACTOR MUST LIAISE WITH THE FIRE ALARM VENDOR AND ELECTRICAL CONTRACTOR TO COORDINATE THE REQUIREMENTS. SWITCHES SHALL OVERRIDE ALL SYSTEM SAFETIES TO ALLOW EMERGENCY OPERATION.
16. UPON FAILURE OF ANY DIRECT DIGITAL CONTROL (DDC) UNIT, AN ALARM SHALL BE INDICATED ON THE BMS AND THE SYSTEM SHALL AUTOMATICALLY REVERT TO THE DEFAULT CYCLE. ALL MOTORS AND SUPPLY/RETURN FANS SHALL REMAIN IN THEIR LAST COMMANDED STATE, AT WHICH TIME THE NORMAL SEQUENCE OF OPERATIONS SHALL RESUME FOR SELECTED FANS AND PUMPS ONCE THE DDC UNIT IS RESTORED TO SERVICE.
17. IN GENERAL, HEATING CONTROL VALVES SHALL FAIL OPEN, STEAM CONTROL VALVES SHALL FAIL CLOSED, CHILLED AND CONDENSER WATER CONTROL VALVES SHALL FAIL CLOSED. ISOLATION DAMPERS AT FANS AND AIR UNITS SHALL FAIL CLOSED.
18. STAND-BY COMPONENTS SUCH AS CONVERTORS, CHILLERS, COOLING TOWERS AND PUMPS SHALL BE ALTERNATED INTO OPERATION EVERY 500 HOURS. THE BMS SHALL ALARM FOR CHANGE OVER; ACTUAL CHANGE OVER SHALL BE INITIATED BY TRAINED MAINTENANCE PERSONNEL THROUGH THE BMS.
19. IN GENERAL, ALL HEADERED FANS AND PUMPS UNDER AUTOMATIC CONTROL SHALL START BEHIND CLOSED DAMPERS OR VALVES TO AN ADJUSTABLE SPEED OF 25 TO 30 HERTZ. WHEN THE VFD'S CONFIRM THIS SPEED THROUGH THE BMS ISOLATION DAMPERS/VALVES SHALL OPEN, WHEN END SWITCHES HAVE PROVEN
DAMPERS/VALVES OPEN THE RESPECTIVE FAN OR PUMP SHALL COME UNDER CONTROL AT REQUIRED OPERATIONAL SPEED. UNDER HAND OPERATION, DAMPER/VALVES SHALL REMAIN CLOSED UNTIL SPEED IS RAMPED TO 25 HERTZ. THE VFD SHALL NOT ALLOW IN EXCESS OF 25 HERTZ UNTIL RESPECTIVE END SWITCHES HAVE BEEN PROVEN OPEN. UNDER BYPASS CONDITIONS, DAMPER/VALVES SHALL OPEN VIA HARD WIRED RELAYS.
20. HVAC SYSTEM CONTROLS SHALL NOT FAIL AND LOCK OUT UPON LOSS OF TOTAL BUILDING POWER (SUCH AS UNDER EMERGENCY CONDITIONS WITH A MAJOR POWER OUTAGE) AND LOSS OF POWER SHALL NOT BE ALARMED TO THE BMS. THE CONTROLS CONTRACTOR SHALL PROVIDE LOCAL UPS UNITS FOR EACH CONTROL PANEL. IF POWER IS LOST TO INDIVIDUAL DEVICES TO THE BMS SHALL BE ALARMED FOR THE INDIVIDUAL COMPONENTS.