COMAU Project

Management Office

evolution

Roberto Checcozzo

COMAU PMO Europe

(2)

Agenda

About COMAU

Birth of PMO in COMAU

Lessons learned

(3)

About COMAU

Our mission

ROBOTICS & AUTOMATION BODY SHOP TECHNOLOGIES FINAL ASSEMBLY SYSTEMS POWERTRAIN MACHINING & ASSEMBLY MAINTENANCE SERVICES Comau is a global Supplier of industrial automation systems and integrated maintenance services

for the manufacturing sector.

With its extensive range

of solutions for welding and body assembly systems, as well as machining and mechanical assembly systems, it is one of the leading players in the market.

(4)

About COMAU

39 years of growth and experience

1973 - SOME COMPANIES OF THE TURIN AREA CREATE CONSORZIO MACCHINE UTENSILI

1977 - COMAU INDUSTRIALE SET UP WITH MECHANICAL AND BODY (WELDING, ASSEMBLY AND HANDLING) DIVISIONS

1978 -COMAU S.p.A.ESTABLISHED, INCORPORATING COMAU INDUSTRIALE ACTIVITIES

1995 - 97 - COMAU DEUTSCHLAND, DO BRASIL, ARGENTINA, FRANCE AND INDIA ESTABLISHMENT

1998 - COMAU SERVICE SET UP

1999 - ACQUISITION OF RENAULT AUTOMATION IN FRANCE AND PICO IN USA, MEXICO, GERMANY, UK AND SOUTH AFRICA

2000 - 03 - COMAU CHINA, ROMÂNIA AND RUSSIA ESTABLISHMENT

2009 - COMAU AEROSPACE SET UP

2011 – COMAU ADAPTIVE SOLUTIONS SET UP

FIAT 500 2009

(5)

About COMAU

… not only automotive

SOLAR PANELS AUTOMATIC ASSEMBLY DEFENSE AUTOMATIC WELDING AND ASSEMBLY AUTOMOTIVE HIGH DENSITY AUTOMATION AEROSPACE AUTOMATIC DRILLING AND RIVETING

Comau is nowadays expanding its presence in diversified markets

(6)

About COMAU

Group Network

DETROIT TEPOTZOTLAN BELO HORIZONTE CORDOBA LUTON TRAPPES CASTRES ORADEA MOSCOW PUNE SHANGHAI TURIN TYCHY COLOGNE

(7)

About COMAU

References

AEROSPACE AUTOMOTIVE

ENERGY

HEAVY INDUSTRY PUBLIC

TRANSPORTATION

RECREATIONAL DEFENSE

(8)

Birth of PMO in COMAU

2007: PMO year zero

Comau business complexity increased frantically in the last 15 years, and a dramatic change was required.

At mid 2007, following the need of a better projects governance, a Corporate Contract & Project Management Organization was established in Comau to:

Manage multi-national projects with the right empowering and visibility Harmonize Project Management rules and tools worldwide

Manage Projects Portfolio

Allow experiences flow between different Countries and Businesses

Comau started the travel from a centric-multiclustered model to a collaborative-networked model

(9)

Four main areas of action were identified:

Organization Processes

Skills & Behaviors Communication

The Project Management Institute (PMI®) was chosen as a reference for Project Management practice and the PMBOK® as a guideline for Project Management Processes.

Birth of PMO in COMAU

(10)

The need to change

Lessons learned 2007-2011

After the analysis we discover that something was still missing…

Must reinforce the commonalities among BU and Countries:

Methodologies

Processes

Rules

Must reinforce the integration among the company functions

Strategy

Company-wide vision

Networks

Must reinforce the willingness to win

(11)

The need to change

New COMAU organization

BODY

WELDING POWERTRAIN

ROBOTICS

AEROSPACE

Europe

Asia – Pacific Area

USA ADAPTIVE SOLUTIONS Countries BUSINESS UNITS Latin America

(12)

Evolution of PMO

Contract and Project Management Office

PMO Role inside organization

Revision of the PMO organization

Update processes

Skills and Behaviours

(13)

PMO Role inside organization

Functions of the PMO

The position of the PMO in the organizational structure would have “naturally” defined some PMO benefit and functions…

Level 2 PMO supports several projects

under the same program

Level 3 PMO supports a

division or a department with all of its projects

Level 4

PMO supports the organization Level 5 PMO supports business strategy decisions and resources allocation at the enterprise level Level 1 PMO supports just one project

(14)

PMO Role inside organization

The role of the PMO

Board of Directors

(KPI’s, strategy, decision making process)

(15)

PMO Role inside organization

New missions for PMO

Defining, harmonizing and verifying global Project Management rules, methodologies and tools

Collecting and sharing best practices and lessons learned Enhancing the Project Management organization

Performing Project Management benchmarking with external organizations

Managing Comau Global Project Portfolio Database Monitoring company wide Project Management KPIs Evaluating the training needs of PM family

(16)

Analysis of Contracts •General Terms •Specific Topics Analysis of •Project Status •Risks Analysis of Contracts •Technical Contents •Annexes PMO organization

Integration in Contract and Project

Management Office

Claim Warning

(17)

PMO organization

(18)

Processes and policy

Revision and integration of PM processes

Revision of COMAU internal policy

Process revision and quality management

Portfolio Management

(19)

Skills and behaviors

COMAU PM Academy

In late 2007 Comau has created a Project, Program and Leadership Academy

Since 2008, the Comau PM Academy is a PMI® Registered Education Provider

(20)

Among the hard-skill courses provided by the Comau PM Academy:

PME – Project Management Essentials (2 days) PMF - Project Management Fundamentals (3 days) PMP® preparation Course (6 days)

Train the Trainer (2 days)

Training material is developed internally, based on PMI® standards, but carefully tailored to Comau’ specific business.

The training courses are held by Comau PMP® certified trainers with

on-Skills and behaviors

(21)

Since 2007, Comau has been encouraging its Project Managers and the Project Team members to pursue PMI® certification and become

PMP® – Project Management Professional

Certification is awarded based on:

clear track record of past project management experience (eligibility requirement)

project management education (eligibility requirement) multiple-choice exam

Skills and behaviors

(22)

Communication management

Book of Best Practices

Comau has also developed a

BOOK OF BEST PRACTICES

with the aim of sharing knowledge and exchange lessons-learned

(23)

Communication management

Global Contract and Project

Management Workshops

Face to face meeting

Share PMO activities in the various countries

Work, in dedicated sessions to address specific project management topics. Start-up projects and assign them to specific country.

(24)

Comau recognizes the importance for PMs to share knowledge and acquire an international experience

On this regard Comau Project Management Office is developing a

network of international correspondents of project-oriented organizations,:

Communication management

Benchmarking with external

organizations

(25)

Thank you

Transforming COMAU PMO as a solution for

sustainable business

(26)

Roberto Checcozzo

COMAU

[email protected]

Pho. +39 011 0049177

Mob. +39 334 6734607

References

Related documents

The Service Delivery Model for Developmental Social Services acknowledges the interdependent relationship between the main programmes of the Department, namely Social Security,

In case of a completed code inspection, the verification report documents the translation validation process whereas the traceability report maps the model elements

flash, html and rich media formats should be delivered also with substitute creative in one of the following graphic formats: jpg, gif, animated gif, in order to display

• When run as above, you will get a <username>.<epoch>.<jobid>.0 file • When run as above, you will get a <username>.<epoch>.<jobid>.0 file in

In Windows Server 2003, as in Windows 2000, every domain controller in every domain in every forest should also be a Domain Name Server because AD uses DNS to locate objects in

*Intracranial tumours may have undergone neurosurgery. **Chronic palsy indicates isolated non-progressive palsy of greater than I year duration with no identifiable

The main goal of the thesis is to identify the national ideology governing Gesar , and to show how the three main active sectors, which consist of the government,

More precisely, we de- rive a new stochastic method for solving SMPC by combin- ing two recent ideas used to improve convergence behavior of stochastic first order methods: