• No results found

ADDENDUM NO. 2 ISSUE DATE: 01/28/13. This Addendum shall become and form a part of the RFP for: Note please review carefully!

N/A
N/A
Protected

Academic year: 2021

Share "ADDENDUM NO. 2 ISSUE DATE: 01/28/13. This Addendum shall become and form a part of the RFP for: Note please review carefully!"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

ADDENDUM NO. 2 ISSUE DATE: 01/28/13

This Addendum shall become and form a part of the RFP for: RFQ 484-021813: Right of Way Valuation Services

Note please review carefully!

In the event of a conflict between previously released information and the information contained herein, the latter shall control.

NOTE: A signed acknowledgment of this addendum (this page) MUST be attached to your PROPOSAL

Firm Name ______________________________________________________

Signature ______________________________ Date ___________________

Typed Name and Title _______________________________________________ Georgia Department of Transportation (GDOT)

Attn: Kip Marshall One Georgia Center 600 W. Peachtree Street, NW

19th Floor Atlanta, Georgia 30308

This Addendum, including all articles and corrections listed below, shall become and form a part of the original RFP package and shall be taken into account in preparing your proposal.

(2)

EXHIBIT 2 FEE PROPOSAL FORM

(MUST BE SUBMITTED IN SEPARATE SEALED ENVELOPE)

Date: .

Proposing Firm: .

Contact:______________________________ ________________ _________________________ (Telephone) (Fax) (E-mail)

Re: RFQ-RFP 484-021813 – Right of Way Valuation Services

Appraiser

Level Categories Description Fee Weight

Subtotal

1 Level 1

Category

1.1 388-C Report only $ 20%

$

2

Category

1.2 388-C Report with Specialty Reports $ 20%

$

3 a. Class 1 Sign - Less than 5 cabinets $ 20%

$

4 b. Class 2 Sign - More than 5 cabinets $ 20%

$

5 c. Class 3 Sign - Billboards $ 20%

$

6 d.

Class 1 Trade Fixture - Small Commercial

(per Business Owner or Tenant) $ 20%

$

7 e.

Class 2 Trade Fixture - Large Commercial

(per Business Owner or Tenant) $ 20%

$

8 f.

Class 3 Trade Fixture - Small

Industrial/Manufacturing $ 20%

$

9 g.

Class 4 Trade Fixture - Large

Industrial/Manufacturing $ 20%

$

10 h.

Class 5 Trade Fixture - Agricultural (i.e.

Chicken Houses, Horse Farm $ 20%

$

11 i. Class 1 Cost to Cure - Fencing $ 20%

$

12 j.

Class 2 Cost to Cure - Landscaping &

Irrigation $ 20%

$

13 k.

Class 3 Cost to Cure - Subdivision Entry

Features (Residential or Commercial) $ 20%

$

14 l.

Class 4 Analysis – Septic/Well

Vaults/Private Utilities $ 20%

$

15 m.

Class 4 Cost to Cure - Septic/Well

Vaults/Private Utilities $ 20%

$

16 n.

Class 5 Cost to Cure - Detention/Farm

Ponds/Irrigation $ 20%

$

17 o.

Class 6 Cost to Cure -

Parking/Maneuverability (minor impact) $ 20%

$

18 Level 2 Category 2.1 388-N Vacant Land $ 35%

$

19 Category 2.2 388-N Vacant Land $ 35%

$

20 a. Class 1 Sign - Less than 5 cabinets $ 35%

$

(3)

22 c. Class 3 Sign - Billboards $ 35%

$

23 d. Class 1 Cost to Cure - Fencing $ 35%

$

24 e.

Class 2 Cost to Cure - Landscaping &

Irrigation $ 35%

$

25 f.

Class 3 Cost to Cure - Subdivision Entry

Features (Residential or Commercial) $ 35%

$

26 g.

Class 4 Analysis – Septic/Well

Vaults/Private Utilities $ 35%

$

27 h.

Class 5 Cost to Cure - Septic/Well

Vaults/Private Utilities $ 35%

$

28 i.

Class 6 Cost to Cure - Detention/Farm

Ponds/Irrigation $ 35%

$

29 j.

Class 7 Cost to Cure -

Parking/Maneuverability (minor impact) $ 35%

$

30

Category 2.3

388-N Residential Improved (w/o Proximity

Damages) $ 35%

$

31 a. Class 1 Sign - Less than 5 cabinets $ 35%

$

32 b. Class 2 Sign - More than 5 cabinets $ 35%

$

33 c. Class 3 Sign - Billboards $ 35%

$

34 d.

Class 5 Trade Fixture - Agricultural (i.e.

Chicken Houses, Horse Farm $ 35%

$

35 e. Class 1 Cost to Cure - Fencing $ 35%

$

36 f.

Class 2 Cost to Cure - Landscaping &

Irrigation $ 35%

$

37 g.

Class 3 Cost to Cure - Subdivision Entry

Features (Residential or Commercial) $ 35%

$

38 h.

Class 4 Analysis – Septic/Well

Vaults/Private Utilities $ 35%

$

39 i.

Class 5 Cost to Cure - Septic/Well

Vaults/Private Utilities $ 35%

$

40 j.

Class 6Cost to Cure - Detention/Farm

Ponds/Irrigation $ 35%

$

41 k.

Class 7 Cost to Cure -

Parking/Maneuverability (minor impact) $ 35%

$

42 l.

Class 8 Cost to Cure -

Parking/Maneuverability (major impact) $ 35%

$

43

Category 2.4

388-N Residential Improved (w/Proximity

Damages) $ 35%

$

44 a. Class 1 Sign - Less than 5 cabinets $ 35%

$

45 b. Class 2 Sign - More than 5 cabinets $ 35%

$

46 c. Class 3 Sign - Billboards $ 35%

$

47 d.

Class 5 Trade Fixture - Agricultural (i.e.

Chicken Houses, Horse Farm $ 35%

$

48 e. Class 1 Cost to Cure - Fencing $ 35%

$

49 f.

Class 2 Cost to Cure - Landscaping &

Irrigation $ 35%

$

50 g.

Class 3 Cost to Cure - Subdivision Entry

Features (Residential or Commercial) $ 35%

(4)

51 h.

Class 4 Analysis – Septic/Well

Vaults/Private Utilities $ 35%

$

52 i.

Class 5 Cost to Cure - Septic/Well

Vaults/Private Utilities $ 35%

$

53 j.

Class 6 Cost to Cure - Detention/Farm

Ponds/Irrigation $ 35%

$

54 k.

Class 7 Cost to Cure -

Parking/Maneuverability (minor impact) $ 35%

$

55 l.

Class 8 Cost to Cure -

Parking/Maneuverability (major impact) $ 35%

$

56 Level 3 Category 3.1 388-N Non-Residential Improved $ 35%

$

57 Category 3.2 388-N Non-Residential Improved $ 35%

$

58 a. Class 1 Sign - Less than 5 cabinets $ 35%

$

59 b. Class 2 Sign - More than 5 cabinets $ 35%

$

60 c. Class 3 Sign - Billboards $ 35%

$

61 d.

Class 1 Trade Fixture - Small Commercial

(per Business Owner or Tenant) $ 35%

$

62 e.

Class 2 Trade Fixture - Large Commercial

(per Business Owner or Tenant) $ 35%

$

63 f.

Class 3 Trade Fixture - Small

Industrial/Manufacturing $ 35%

$

64 g.

Class 4 Trade Fixture - Large

Industrial/Manufacturing $ 35%

$

65 h.

Class 5 Trade Fixture - Agricultural (i.e.

Chicken Houses, Horse Farm $ 35%

$

66 i. Class 1 Cost to Cure - Fencing $ 35%

$

67 j.

Class 2 Cost to Cure - Landscaping &

Irrigation $ 35%

$

68 k.

Class 3 Cost to Cure - Subdivision Entry

Features (Residential or Commercial) $ 35%

$

69 l.

Class 4 Analysis – Septic/Well

Vaults/Private Utilities $ 35%

$

70 m.

Class 5 Cost to Cure - Septic/Well

Vaults/Private Utilities $ 35%

$

71 n.

Class 6 Cost to Cure - Detention/Farm

Ponds/Irrigation $ 35%

$

72 o.

Class 7 Cost to Cure -

Parking/Maneuverability (minor impact) $ 35%

$

73

Category

3.3 388-N Non-Residential Improved $ 35%

$

74 a. Class 1 Sign - Less than 5 cabinets $ 35%

$

75 b. Class 2 Sign - More than 5 cabinets $ 35%

$

76 c. Class 3 Sign - Billboards $ 35%

$

77 d.

Class 1 Trade Fixture - Small Commercial

(per Business Owner or Tenant) $ 35%

$

78 e.

Class 2 Trade Fixture - Large Commercial

(per Business Owner or Tenant) $ 35%

(5)

79 f.

Class 3 Trade Fixture - Small

Industrial/Manufacturing $ 35%

$

80 g.

Class 4 Trade Fixture - Large

Industrial/Manufacturing $ 35%

$

81 h.

Class 5 Trade Fixture - Agricultural (i.e.

Chicken Houses, Horse Farm $ 35%

$

82 i. Class 1 Cost to Cure - Fencing $ 35%

$

83 j.

Class 2 Cost to Cure - Landscaping &

Irrigation $ 35%

$

84 k.

Class 3 Cost to Cure - Subdivision Entry

Features (Residential or Commercial) $ 35%

$

85 l.

Class 4 Analysis – Septic/Well

Vaults/Private Utilities $ 35%

$

86 m.

Class 5 Cost to Cure - Septic/Well

Vaults/Private Utilities $ 35%

$

87 n.

Class 6 Cost to Cure - Detention/Farm

Ponds/Irrigation $ 35%

$

88 o.

Class 7 Cost to Cure -

Parking/Maneuverability (minor impact) $ 35%

$

89 p.

Class 8 Cost to Cure -

Parking/Maneuverability (major impact) $ 35%

$

90 q.

Class 9 Cost to Cure -

UST's/Dispensers/Canopies (i.e. site

structures) $ 35%

$

91 r.

Class 10 Cost to Cure - Building Cut-offs,

Total Site Redevelopment $ 35%

$

92 Level 4 Category 4.1 388-N Non-Residential Improved $ 10%

$

93 Category 4.2 388-N Non-Residential Improved $ 10%

$

94 a. Class 1 Sign - Less than 5 cabinets $ 10%

$

95 b. Class 2 Sign - More than 5 cabinets $ 10%

$

96 c. Class 3 Sign - Billboards $ 10%

$

97 d.

Class 1 Trade Fixture - Small Commercial

(per Business Owner or Tenant) $ 10%

$

98 e.

Class 2 Trade Fixture - Large Commercial

(per Business Owner or Tenant) $ 10%

$

99 f.

Class 3 Trade Fixture - Small

Industrial/Manufacturing $ 10%

$

100 g.

Class 4 Trade Fixture - Large

Industrial/Manufacturing $ 10%

$

101 h.

Class 5 Trade Fixture - Agricultural (i.e.

Chicken Houses, Horse Farm $ 10%

$

102 i. Class 1 Cost to Cure - Fencing $ 10%

$

103 j.

Class 2 Cost to Cure - Landscaping &

Irrigation $ 10%

$

104 k.

Class 3 Cost to Cure - Subdivision Entry

Features (Residential or Commercial) $ 10%

$

105 l.

Class 4 Analysis – Septic/Well

Vaults/Private Utilities $ 10%

(6)

106 m.

Class 5 Cost to Cure - Septic/Well

Vaults/Private Utilities $ 10%

$

107 n.

Class 6 Cost to Cure - Detention/Farm

Ponds/Irrigation $ 10%

$

108 o.

Class 7 Cost to Cure -

Parking/Maneuverability (minor impact) $ 10%

$

109

Category

4.3 388-N Non-Residential Improved $ 10%

$

110 a. Class 1 Sign - Less than 5 cabinets $ 10%

$

111 b. Class 2 Sign - More than 5 cabinets $ 10%

$

112 c. Class 3 Sign - Billboards $ 10%

$

113 d.

Class 1 Trade Fixture - Small Commercial

(per Business Owner or Tenant) $ 10%

$

114 e.

Class 2 Trade Fixture - Large Commercial

(per Business Owner or Tenant) $ 10%

$

115 f.

Class 3 Trade Fixture - Small

Industrial/Manufacturing $ 10%

$

116 g.

Class 4 Trade Fixture - Large

Industrial/Manufacturing $ 10%

$

117 h.

Class 5 Trade Fixture - Agricultural (i.e.

Chicken Houses, Horse Farm $ 10%

$

118 i. Class 1 Cost to Cure - Fencing $ 10%

$

119 j.

Class 2 Cost to Cure - Landscaping &

Irrigation $ 10%

$

120 k.

Class 3 Cost to Cure - Subdivision Entry

Features (Residential or Commercial) $ 10%

$

121 l.

Class 4 Analysis – Septic/Well

Vaults/Private Utilities $ 10%

$

122 m.

Class 5 Cost to Cure - Septic/Well

Vaults/Private Utilities $ 10%

$

123 n.

Class 6 Cost to Cure - Detention/Farm

Ponds/Irrigation $ 10%

$

124 o.

Class 7 Cost to Cure -

Parking/Maneuverability (minor impact) $ 10%

$

125 p.

Class 8 Cost to Cure -

Parking/Maneuverability (major impact) $ 10%

$

126 q.

Class 9 Cost to Cure -

UST's/Dispensers/Canopies (i.e. site

structures) $ 10%

$

127 r.

Class 10 Cost to Cure - Building Cut-offs,

Total Site Redevelopment $ 10%

$

*Note- A total of all fees quoted multiplied by the stated weighting will be used for evaluation purposes only.

Total*- This is the number that will be used for evaluation purposes.

(7)

NOTE: Updates will be paid at the indicated percentage of the appropriate fee. This information will not be used for evaluation purposes but is provided for information regarding how the resulting contract will be administered specifically for updates. 128 Updates

Category 5.1

Update less than 3 months (25% of Initial

Cost) 25%

129

Category 5.2

Update 4 months to 8 months (50% of

Initial Cost) 50%

130

Category 5.3

Update 9 months to 12 months (75% of

References

Related documents

Figure 31. Figure 31: Experimental application of simplified EPN method to predict corrosion rate Step 1: Set-up three electrode test. The set-up for this experiment consists of

Given the role of the mass media in framing social reality, the present study focuses on the coverage of issues of corruption by focusing on the roles of ownership patterns and

– The insurer cedes only the risks exceeding a given amount (retained line) and for each risk the proportion of premium corresponding to the ceded risk exposure. – It allows

BASE BID DISCRIPTION: Project includes the replacement of high bay lighting fixtures and installation of lighting control panel as noted on documents. Work includes all

Regarding the Water Infrastructure Improvements Service Area contract – does that include water, wastewater and stormwater infrastructure improvement projects or is it

Reduction in monthly premiumfor completing all of these Wellness Activities by November 18, 2015 TOTAL monthly employee-only premium Consumer-Directed Health Plan (CDHP) with

Per Section 2.8 of the solicitation, “the selected Proposer shall be responsible for providing on-site and on-call technical support services to ensure optimal performance of

Question: Does Saint Louis Public School District seek a mobile application to accompany the new website, or create the website in a responsive manner so that it renders on all