December 3
rd
, 2014
Jean Favreau, Research manager, Pointe-Claire
Presented by
Yu (Vivian) Li, Researcher, Vancouver
Value Maximization and Decision Support
(VMDS)
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations. © 2013 FPInnovations. Tous droits réservés. Reproduction et diffusion interdites. Les marques et les logos de FPInnovations sont des marques déposées de FPInnovations
Access to R&D knowledge from
400+ R&D Staff Covering the Full Forest Value Chain
2
Road &
Transportation
Fiber Supply
Inventory
Resource
Attributes
Harvesting
Systems
Wild Fire
Operations
EWP
Manufacturing
Manufacturing
Secondary
Advanced
Building System
Paper, Packaging &
Consumer Products
Cellulosic
Biomaterials
Market Pulp
Wood
Biomaterials
Biorefinery &
Energy
Environment &
Sustainability
PIT
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations. © 2013 FPInnovations. Tous droits réservés. Reproduction et diffusion interdites. Les marques et les logos de FPInnovations sont des marques déposées de FPInnovations
VMDS Program Objectives
Develop strong market pull industrial behavior
Direct the fiber at the right process facility at the right time in the
right form
Take advantage of the unique attribute of the fiber
Optimize the entire value chain from resource to market
Improve efficiency of the manufacturing sector
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations.
VMDS Main Research Themes
4
Better fibre supply for the
industry
Improved value-based modules
in FPInnovations DSS tools
Innovative tools to improve
product flow efficiency
Agile and efficient
manufacturing
Integration of NSERC VCO
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations. © 2013 FPInnovations. Tous droits réservés. Reproduction et diffusion interdites. Les marques et les logos de FPInnovations sont des marques déposées de FPInnovations
1. Better supply
5
Strategies to apply “the right
fibre is sent to the right mill at
the right time at the right
cost”
Complex planning decisions
with better planning tools
(e.g. net value of forest
stands, wood allocation,
scheduling, better forest
inventory)
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations.
BC Bioeconomy - Fort St. James study
Objective: map distribution of
different categories of fibre
(sawlog, pulpwood, biomass)
over large areas
Green stands, no Lidar tree
heights
211 plots
Sampling intensity: 200 m
(direction of main change) * 400
m. Total area approx. 2,000 ha
Digital air photos to be available
in 2015
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations.
Total sawlog volume (pine l.,
spruce, and balsam) at each
plot (m
3
/ha)
Digital Elevation
Model (TIN
representation) and
location of the 211
plots
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations.
Total sawlog volume
interpolated over the
study area (m
3
/ha)
Map depicting the probability
that sawlog volume > 200
m
3
/ha
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations. © 2013 FPInnovations. Tous droits réservés. Reproduction et diffusion interdites. Les marques et les logos de FPInnovations sont des marques déposées de FPInnovations
2. Value tools
9
Provide tools to help streamline supply
chains and maximize value from available
fibre
Develop practical, functional models for
the industry considering the entire value
chain
Provide tools to help companies evaluate
and leverage new bioproduct opportunities
Propose (“push”) new solutions to the
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations.
ForestPlan
Approach
Use ForestPlan to determine the
optimal harvest and log allocation
plan based on sawmill needs at
Tembec
Populate ForestPlan with forest,
road and sawmill data
Evaluate the impact of lumber
market fluctuations on log
allocation decisions to sawmills
Expected benefits
Potential benefits identified in a
case study on BC Coast are
approx. $1.5/m³
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations. © 2013 FPInnovations. Tous droits réservés. Reproduction et diffusion interdites. Les marques et les logos de FPInnovations sont des marques déposées de FPInnovations
3. Products flow
11
Solutions to provide efficient fibre flow
New tools to manage larger product mix
with shorter lead time and make
strategies to bring fibre from far or
remote areas
Better use of truck fleet and drivers to
supply mills and to overcome a lack of
manpower
Support implementation of efficient
multimodal transportation systems
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations. © 2013 FPInnovations. Tous droits réservés. Reproduction et diffusion interdites. Les marques et les logos de FPInnovations sont des marques déposées de FPInnovations
Transportation Logistics
12
Transportation interacting with upstream and downstream activities
Forest
Forest operations
Inventory
Transport
Mill
Demand
Information
Market
Three main decisions
1.
Allocation (Where)
2.
Routing (How)
3.
Scheduling (When)
Optimization
Simulation
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations. © 2013 FPInnovations. Tous droits réservés. Reproduction et diffusion interdites. Les marques et les logos de FPInnovations sont des marques déposées de FPInnovations
FPInterface
TM
13
GIS-based simulation model to assess hauling
cost. A tool to analyze tactical and operational
plans.
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations.
Determining the backhaul potential
by sector
Calculating the savings by
company/product
Identifying the best routes
Evaluating the viability of solutions
Establishing transport rates for
complex situations
Implementing in Canfor and
Resolute Forest Products
to
identify backhaul opportunities and
reduce transportation cost
Optimizes transport by:
FPInterface
TM --
MaxTour
Reduce 10-20 % of empty travel distances
Reduce 2-7 % of total transport cost
Mill A
Mill B
Mill C
Loaded
Truck 1
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations.
Truck Scheduler (TS)
Forest
Forest operations
Roadside Inventory
Transport
Mill
Market
TSC:
Truck Scheduler for Company
TSD: Truck Scheduler for Drivers
Optimizes transport by:
Minimizing queuing time (waiting time) for log trucks
Determining
the back haul opportunities
Increasing driver satisfactory of working hours/shifts
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are tr ademarks of FPInnovations.
Truck Scheduler:
Improve Log Truck Utilization
16
Forest to mill Mill to mill
D a sh b o a rd G a n tt C h a rt s C S V r e su lt s fi le s M a tr ix t ra v e l d ist a n ce C o n tr a ct o r a ssu m p ti o n s M o d e l p a ra m e te rs S u p p ly a n d d e m a n d Create CSV file Operational parameters Input
Driving time empty Driving time loaded
Driving time empty Driving time loaded
Contractor assumptions Contractor availability Mathematical parameters
Payload
Mill demand
Loader schedule
Supply sector Inventory
Dashboard
Truck Planning
Demand Plan
Import results
Inventory Plan Loader Plan (Mill)
Period KPIs Shifts Plan Shipment Plan Supply Loaders Transportation Plan Trucks KPIs Trucks Plan Optimize Mill Planning Site Planning Period : January
KPIs Dem. Satisf.
Fleet Utilization (Detailed)
Inventory
▲1 2 3 4 5 ▲1 2 3 4 5
0 Re07095 14190 21285 28280 0 Elko Saw millWh 1750200921501450 0 0 Wh0 156 503 5091865 0 Radium Saw millWh 2846229426502988 0 1 Re0 0113115622493 0 Radium Saw millRe 12226 12500 11550 11702 0 2 Re05762 11174 16986 22748 0 Canal Flats Saw millRe 11905 15826 11550 11350 0
Fleet Utilization Trend 3 Re0 171 242 413 534 0 Kootenay OperationPu 2850290028001950 0 4 Re0 126 2 128 254 0 Kootenay OperationRe 6261850800 250 0 5 Re0245047007400 10100 0 Elko PulpPu 2600280032501200 0 7 Re0324364869729 12972 0 0 0 0 0 0 0 12 Re0268653728058 10744 0 0 0 0 0 0 0 1030 Re0 187 474 511 748 0 0 0 0 0 0 0 ▼ ▼ 89% Logistics Dashboard Hours / Truck Mill Supply 62 h/Week Av. Trsp Cost 5,75 $/m³ Fleet Utilz. 25% Comments/Notes : 20 25 30 35 1 2 3 4 0 10000 20000 30000 40000 50000 60000 70000
Attained Vol Missed Vol 0 20000 40000 60000 80000 100000 120000
Attained Vol Missed Vol
0 50 100 150 200 K335K249K334K188 K T1 55K153K517 K T580 K1 07A K30 7AK333 K T1 15K439 K51 6AK147K513K504K102 K T1 18 K18 6A K43 3AK501 KT2 4K331 K T131 K1 49AK313K146K242K189K141 K T610K151K332K231 K T577 KT2 3 KT14 2A K43 2AK431 K50 6AKT21 K T130 KT0 2 32,5 40 12,75 12,75 0
DRIVING EMPTY (%) DRIVING LOADED (%) LOADING (%) UNLOADING (%) WAITING (%) 0% 10% 20% 30% 40% 50%
Loaders Utlization Ratio
Dashboard
Dock Scheduling
Truck Scheduling
Determine the
schedule of trucks
over a period of time
(e.g. one week) in
Weyerhaeuser to:
Minimize transportation
cost (loaded and empty
trips)
Minimize the cost
associated with waiting
time of trucks and
loaders at the mill and in
the forest.
www.fpinnovations.ca
Follow us on
© 2014 FPInnovations. All rights reserved. Copying and redistribution prohibited. ® FPInnovations, its marks and logos are trademarks of FPInnovations.