• No results found

APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT. City, State, Zip Code:

N/A
N/A
Protected

Academic year: 2021

Share "APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT. City, State, Zip Code:"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

(1)

APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

APPLICANT INSTRUCTIONS: For all applications, complete Parts 1,2,3,4 and 5

of this form. For electrical work complete Part 5. For plumbing work, complete Part 6. For mechanical work complete Part 7. For other permits, complete Part 8. The Site Plan (Part 10) is to be shown on page 4 or attached hereto. Parts 11-18 (pages 5 & 6) are for department use only.

All Contractors working on the site this application refers to MUST be licensed with the City.

Processing times for applications could take 7 to 10 days.

Building Department staff have up to 72 hours to schedule inspections. Please plan accordingly.

OFFICE USE ONLY

Date Received_________________ Permit No. ___________ PERMIT FEE COST $ _____________

Type of Permit: Building (B) Electrical (E) Plumbing (P) Mechanical (M) Other (O)

1. PROPERTY INFORMATION

Street Address Parcel #: Zoning:

Subdivision Lot #: Parcel Type: Residential (R) Industrial (I)

Commercial (C) Other (O)

2. OWNER INFORMATION

NAME:

(Last, First Middle Initial) Phone #:

Street Address: City, State, Zip Code:

3. CONTRACTOR(S) INFORMATION

Name of Contractor Address License #:

Applicant (Not Owner) Architect/Engineer General Contractor Excavation Concrete Carpentry Electrical Plumbing Sewer Mechanical Roofing Masonry Drywall / Lathing Sprinkler Paving Fire Alarm

I hereby certify that I am the owner of record of the named property, or that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his/her authorized agent and I agree to conform to all applicable laws of this jurisdiction. In addition, if a permit for work described in this application is issued, I certify that the code official or the code official’s authorize representative shall have the authority to enter areas covered by such permit at any reasonable hour to enforce the provisions of the code(s) applicable to such permit.

Signature of Applicant: Date:

Responsible Party Performing Work: Date:

CITY OF WAYNESVILLE

PUBLIC WORKS & BUILDING DEPARTMENT

100 Tremont Center

Waynesville, MO. 65583

Phone: 573-774-6171

(2)

BUILDING PERMIT APPLICATION – CONTINUED

4. PROJECT SPECIFICS

Est. Start Date: Est. Finish Date: Est. Building Cost/Value:

Improvement Type Proposed Use Institutional Other

New Construction Theatre Group Home Parking Garage

Addition Night Club Hospital Carport

Alteration Restaurant Jail Motor Fuel Service

Repair/Replacement Church Mercantile Repair Garage

Demolition Other Assembly Hotel Public Utility

Relocation Business Multi-Family HPM

Foundation Only Educational

.

BOCA Two Family

Change of Use Only Grades 1-12 CABO Single Family

Factory Storage

Moderate Hazard Moderate Hazard

Low Hazard Low Hazard

Structural Frame (Check all those applicable) Exterior Walls (Check all those applicable

Steel Concrete Other Steel Concrete Other

Masonry Wood Masonry Wood

Any structural assemblies fabricated off-site:

Yes No

Please furnish all applicable information that applies to the job site:

Square feet of Street Frontage Number of Stories Square feet of Lot Area Feet of Front Setback Number of Bedrooms Square feet of Building Area Feet of Rear Setback Number of Full Baths Square feet of Parking Area Feet of Left Setback Number of Partial Baths Square feet Living Area Feet of Right Setback Number of Garages Square feet of Basement Number of

Feet Above Grade

Number of Windows Square feet of Garage Area Number of New Residential Units Number of Fireplaces Square feet of Office/Sales Number of Existing Residential Units Number of Enclosed Parking Square feet of Service Area Number of Elevators/Escalators Number of Outside Parking Square feet of Manufacturing

5. ELECTRICAL PERMIT APPLICATION

Est. Start Date: Est. Finish Date: Est. Electrical Work

Value/Building Cost:

Total Service Amps: Number of Service Outlets:

Number of Circuits: __________ Wire __________ Wire __________ Wire

(3)

BUILDING PERMIT APPLICATION – CONTINUED

5. ELECTRICAL PERMIT APPLICATION – cont.

Power Devices Output/Load No.

Utility Service Revisions:

.

6. PLUMBING PERMIT APPLICATION

Est. Start Date: Est. Finish Date: Est. Plumbing Work

Value/Building Cost:

Enter the number of fixtures being installed, replaced or repaired:

Tub/Shower Drinking fountains Back flow preventers

Shower stalls Floor drains Water pumps

Lavatories Water heaters Roof Openings

Toilets Water Softeners Parking Lot Drains

Urinals Sewage Ejectors Inside Downspouts

Sinks Sump Pumps Swimming Pools

Laundry Tubs Grease Traps Dishwashers

Garbage Disposals Bidets

Standpipes

Yes No

Number of hose outlets

Fire Sprinklers

Yes No

Number of heads

Lawn Sprinklers

Yes No

Number of heads

Public Water

Yes No Public Sewer

Yes No

Average Daily Use:

Water Service Size: ____________ inches

Water Meter Size: _____________ inches

Utility Service Revisions:

7. MECHANICAL PERMIT APPLICATION

Est. Start Date: Est. Finish Date: Est. Electrical Work

Value/Building Cost:

Enter the number of new or replacement units:

Forced Air Furnace Incinerator Air Handling Unit

Unit Heater Boiler Heat Pump

Gas/Oil Conversion Coil Unit Air Cleaner

(4)

BUILDING PERMIT APPLICATION – CONTINUED

7. MECHANICAL PERMIT APPLICATION – cont.

Gravity Furnace Split System A/C Hazardous Exhaust System

Solid Fuel Appliances A/C Compressor Electric Furnace

Type of Healing Fuel:

(Check one) _____ Gas (1) _____ Oil (2) _____ Electric (3) _____ Coal (4) _____ Wood (5) _____ Other (6)

Utility Service Revisions:

8. OTHER REQUIRED PERMIT APPLICATION(S)

Est. Start Date: Est. Finish Date: Est. Value/Building Cost:

Permit Type: Description of Work:

The following forms shall be completed and returned to the Building Department for the issuing of a building permit:

Completed Building Permit Application along with two (2) sets of plans. Plans will include Framing,

Mechanical, Plumbing and Electrical plans along with landscaping.

Processing times for permits can range from 7 to 10 days after submission of proper paperwork and any supporting documents. Paperwork not completed in its entirety will be

returned. This may cause a delay in the application review and issuance of the appropriate permits.

(5)

9. SITE PLAN

(Show lot lines, easements, work layout and dimensions)

(6)

Applicants should realize a more detailed and complete plan, which complies with code requirements.

This will require less time to review and approve.

One set of plans are required for the City of Waynesville.

One set of plans will remain on the job site for all inspections.

It is the applicant’s responsibility to be familiar with and comply with the 2006 edition of ICC One and

Two-Family Dwelling Code, adopted by the City of Waynesville.

SITE PLAN

1.

A scaled plan of the lot or property where the proposed construction will be located.

2.

All lot dimensions will be shown.

3.

All easements, restrictions, (i.e., Floodplain, etc.), encumbrances also will be illustrated. It is the

applicant’s responsibility to determine these items and document them properly.

4.

The proposed construction will be shown along with existing building, if any.

5.

If a new connection to a City sewer is proposed, the location of the existing sewer is to be

shown along with its size and elevation at the point of proposed connection. This elevation can

be either actual or relative to the lowest floor to be served by the sewer.

6.

If a new connection to a City water main is proposed, the location of the existing main is to be

shown along with its size and the point of proposed connection.

7.

Driveway location, the diameter, length and location of a storm water culvert if required.

8.

Area of the lot or property and copy of the subdivision plat where the lot is located.

9.

A prominent North arrow will be shown on the plan.

FOUNDATION PLAN

1.

Components of the foundation, specifications, dimensions, and all special details

explaining the proposed foundation are to be shown and listed.

2.

If a basement is proposed, the elevation of the basement floor will be given.

3.

The plan will be drawn at the scale of ¼” = 1’-0”.

FLOORS

1.

All rooms and areas of the floors will be dimensioned and labeled with their intended

use.

2.

The dead and live loads used to determine the size and spacing of floor joists and

supporting beams will be provided.

(7)

4.

The plan will be drawn at the scale of ¼” = 1’-0”.

ROOF FRAMING

1.

If manufactured trusses are to be used, a truss plan signed and sealed by a

professional engineer licensed by the State of Missouri is required.

2.

If the roof framing will be built with traditional rafters, the size, location and spacing will

be shown on the site plan. Any special connections or framing will be shown in

separate detail. The roof framing plan will be the same scale as the floor plan.

CROSS SECTIONS

1.

A sufficient number of views or sections through the proposed structure, illustrating all

foundation, framing and finish components, shall be provided at the same drawing scale as the

floor plan.

PLUMBING PLAN

1.

Either a schematic or scale plan of the fixtures and supply, drain, waste water and vent pipes to

be installed. If a scale plan is provided, it will be the same scale as the floor plan.

2.

The type, material, classification and inside diameter of all piping will be shown or given

on the plan.

ELECTRICAL PLAN

1.

A scale plan of the electrical devices, outlets and switches to be installed. The plan will

detail how the components are connected and controlled. The plan will be drawn at the

same scale as the floor plan.

2.

The type, number and gage of all wiring to be installed will be shown or given on the

plan.

3.

The amperage and voltage of all installed electrical devices will be shown or given on

the plan.

Any special type of construction or out of the ordinary improvements will require

special details. These details will be need to be documented and illustrated to allow

(8)

FOR DEPARTMENT USE ONLY

Date Application Received: Application Reviewed By:

FLOODPLAIN EVALUATION

Flood Map # & Date: Lowest Floor Elevation:

Flood Zone: Base Flood Elevation:

ZONING PLAN EVALUATION

Zoning District: Map Number

Lot Area (from page 2): Lot coverage (%):

Lot Area per room: Encroachments:

Off Street Parking Spaces: _______________ Required _______________ Provided

Signs: __________ Number Size of each Sign: ______________ _____________ ______________ _____________

Planning Commission Approval

Yes

No Board of Zoning Appeals Approval

Yes

No

PLAN REVIEW RECORD

Plans Review Required Check Plan Review Fee Date Plans

Started By Date Plans Approved By Notes BUILDING $ PLUMBING $ MECHANICAL $ ELECTRICAL $ OTHER $

TOTAL

$

ADDITIONAL PERMITS REQUIRED Permit of Approval Check Date

Obtained

Number By Permit or Approval Check Date Obtained

Number By

CURB OR SIDEWALK CUT USE OF PUBLIC AREAS

BOILER PLUMBING

ELEVATOR ROOFING

ELECTRICAL SIGN OR BILLBOARD

FURNACE STREET GRADES

GRADING SEWER

(9)

PROJECT DOCUMENTS (DRAWINGS & CALCULATIONS TYPE

DRAWINGS/REPORT

SUBMITTED SIGNED AND SEALED DATE REVISION DATE Site Plan Soil Report Architectural Drawings Structural Drawings Mechanical Drawings Electrical Drawings Job Specifications Structural Connect Drawings Structural Calculations Special Inspection Data Sprinkler Drawings Sprinkler Calculation

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No OTHER DEPARTMENT APPROVALS

Signature Date Signature Date

Fire Health & Sanitation

Public Works Water

Zoning & Planning Architectural Review

Environmental Management

VALIDATION

Building Permit

Date Number Permit/Insp. Fee

Electrical Permit

Date Number Permit/Insp. Fee

Plumbing Permit

Date Number Permit/Insp. Fee

Mechanical Permit

Date Number Permit/Insp. Fee

Other

Date Number Permit/Insp. Fee

Prepared by: _____________________________________ Approved by: ____________________________________ Date: ___________________________

Plan Review Fee (from Plan Review Record)

Certificate of Occupancy Fee Other Fee(s)

References

Related documents

The minimum lot size for any multifamily dwelling consisting of more than three (3) dwelling units shall be nine thousand (9,000) square feet plus the number of square

While not expanding to offer AFS services to extract more money from lower income filers, Block should none the less attempt to assist these individuals in breaking the poverty

New Residential Units (number) Fireplaces (number) Office/Sales (sq. ft) Existing Residential Units (number) Enclosed Parking (number) Service (sq. ft)

In particular, it has been argued that Pre-Pottery Neolithic B, or PPNB, society tried to maintain an egalitarian form and resist the hierarchical tendencies in- herent in

maximum of two electrons so the third electron in a lithium atom must go into the next available orbital of higher energy. This will be further from the nucleus in the

The verse mentions the addition of 3,000 to the number of disciples that were

12.5 Solving Equations Involving Addition and

Anomalies on geostationary satellites, particles fluxes and Anomalies on geostationary satellites, particles fluxes and correlation between them during different phases of solar