Purpose
Purpose
Explain how planned order
Explain how planned order dependent requirements are reduced in repetitive manufacturing if reporting pointdependent requirements are reduced in repetitive manufacturing if reporting point backflush is used for production. This
backflush is used for production. This document refers to the explanation and example described document refers to the explanation and example described in SAP Notein SAP Note 459960
459960..
This document is also a continuation of the document
This document is also a continuation of the document Reporting point backflush in REM processReporting point backflush in REM process..
Master data setting
Master data setting
See master data settings in the documentSee master data settings in the document Reporting point backflush in REM processReporting point backflush in REM process
Only the following settings are changed: Only the following settings are changed:
1.
1. MM01 MM01 : Cr: Create one eate one more more component component material NG_REM_RAW2. material NG_REM_RAW2. Refer tRefer to the o the material material NG_REM_RAW.NG_REM_RAW. 2.
2. CS02 : Add it tCS02 : Add it to the BOM of ao the BOM of assembssembly materly material NG_REMial NG_REM_FERT._FERT.
3.
Generated by Jive on 2014-12-01+01:00
2
2. MB1C : Post GR with movement type 561 for material NG_REM_RAW and NG_REM_RAW2, qty = 100. 3. MD02 : Run MRP for material NG_REM_FERT.
4. MD04 : Check the MRP result. 2 planned orders with order type PE (Run Schedule Quantity) are created.
Planned order 40725 : qty = 100 << referred as PO1 Planned order 40726 : qty = 50 << referred as PO2
Generated by Jive on 2014-12-01+01:00
3
MFBF Posting steps and results
1. Backflush: Reporting point 10: PO1: 10 pcsGenerated by Jive on 2014-12-01+01:00
4
Result :
Component NG_REM_RAW of PO1 is reduced by qty = 10. Check MD13 of planned order 47025:
2. Backflush: Reporting point 20: PO1: 5 pcs Result :
Component NG_REM_RAW2 of PO1 is reduced by qty = 5. Check MD13 of planned order 47025:
Generated by Jive on 2014-12-01+01:00
5
3. Backflush: Reporting point 10: PO2: 5 pcs
Result:
Component NG_REM_RAW and NG_REM_RAW2 of PO1 is no longer reduced. Component NG_REM_RAW of PO2 is reduced by qty = 15.
Component NG_REM_RAW2 of PO2 is reduced by qty = 5. Check MD13 of planned order 47026:
4. Backflush: Reporting point 10: PO2: 45 pcs Result:
Component NG_REM_RAW of PO1 is reduced by qty = 10. Component NG_REM_RAW of PO1 is reduced by qty = 0. Component NG_REM_RAW of PO2 is reduced by qty = 50. Component NG_REM_RAW2 of PO2 is reduced by qty = 5.
Generated by Jive on 2014-12-01+01:00
6
requirements
SAP Note 423771 explains the dependent requirements are not adjusted after reversing a reporting point backflush.
There are 2 options to re-distribute the dependent requirements:
• During the next reporting point backflush for the same material, the dependent requirements with the
reporting point stocks and the planned order are compared and adjusted if necessary.
• With report RMSERI35 you can explicitely check and adjust the dependent requirements, without
having to carry out a reporting point backflush.
As an example, try to cancel the last reporting point confirmation in step 4. Check MF12:
Generated by Jive on 2014-12-01+01:00
7
Check MF26: (Adjusted)
Check table RESB : (Not changed)
Re-distribute dependent requirements by report RMSERI35:
Generated by Jive on 2014-12-01+01:00
8
Conclusion:
After a cancellation of reporting point backflush, if you don't carry out a new backflush or re-distribute
dependent requirements by report RMSERI35, dependent requirements could be wrongly reduced compared with the real production. Field RESB-ENMNG could be wrong compared to CEZP-LMVRG and WIP quantities. You should follow the rules listed in SAP Note 423771 to avoid wrong production in the system.
Modification of the reduction logic
As explained above, the withdrawal quantities of all dependent requirements are initialized completely for all planned orders that can be taken into account according to the offsetting logic of the repetitive manufacturing profile and are set up again according to the cumulated reporting point quantities after the confirmation. Dependent requirements which are already reduced may be initialized after a new reporting point backflush.
To prevent it the modification SAP Note 543590 provides the posibility to prevent the re-distribution of dependent requirements.
As an example let's compare it with last backflush in step 4.
Before posting step 4, Table RESB:
Generated by Jive on 2014-12-01+01:00
9
Change the parameter AM61B_DREQ_REDISTRIBUTE to '1' or '2', post step 4, Table RESB:(Reduction of PO1 dependent requirements is NOT changed)
For more details about the parameter AM61B_DREQ_REDISTRIBUTE, see note 543590.
Reduction period calculation
You can set what planned orders are considerd and the reduction period in the REM profile, t-code OSP2.
Generated by Jive on 2014-12-01+01:00
10
FORM PLAF_REDUCTION_GR_GI
Where reduction period is calculated: Program LBARMF0E
Form READ_PLAFZ
Related notes