The CHINA market for Waste-to-Energy

Ivan Christiaens

Keppel Seghers Belgium NV

6th CEWEP Congress 2012

Waste-to-Energy

Energy & Resource Efficiency 6-7 September 2012, in Würzburg

(2)

info@cewep.eu www.cewep.eu

(3)

info@cewep.eu www.cewep.eu

(4)

info@cewep.eu www.cewep.eu

Market worldwide 2008-2010

(5)

info@cewep.eu www.cewep.eu

Market size outside Europe

(2008-2010)

(6)

info@cewep.eu www.cewep.eu

Growth in WTE capacity in China,

2001-2009

(7)

info@cewep.eu www.cewep.eu

(8)

info@cewep.eu www.cewep.eu

(9)

info@cewep.eu www.cewep.eu

China 12

th

five year plan (2011-2015)

• RMB 3.1 trillion (400 billion €) investment in the

‘environment protection’ related area.

• 800 billion RMB (100 billion €) for WtE plants.

(10)

info@cewep.eu www.cewep.eu

(11)

info@cewep.eu www.cewep.eu

Typical Combustion Diagram 500 TPD

B C D E F A LHV min 4605kJ/kg 1100kcal/kg LHV nom 6490kJ/kg 1550kcal/kg LHV max 8374kJ/kg 2000kcal/kg 70 % = 26,3 MWth 100 % = 37,6 MWth 110 % = 41,3 MWth 70 % = 14,6 tph 100 % = 20,8 tph 110 % = 22,9 tph G H I 90 % = 33,9 MWth 20 25 30 35 40 45 10 12 14 16 18 20 22 24 Th er m a l c a pac it y ( M W th )

Waste throughput (ton/h)

ABCDEF = normal operating area

ABGHIF = temporary overload area

(12)

info@cewep.eu www.cewep.eu

(13)

info@cewep.eu www.cewep.eu

Contractual emission standards

Suzhou II Jinan Bai Ge Hu Binhai Chengdu Bao An II EU 2000/76 EC unit

daily average daily average daily average daily average

daily

average daily average

daily average 30 min average sample period

Dust 30 30 25 10 10 10 10 30 mg/Nm³, dry, 11%O2

HCl 50 (1) 50 (1) 50 10 10 10 10 60 mg/Nm³, dry, 11%O2

HF 2 (1) 2 (1) 1 1 1 1 1 4 mg/Nm³, dry, 11%O2

Sox (as SO2) 260 (1) 260 (1) 180 50 50 50 50 200 mg/Nm³, dry, 11%O2

Nox (as NO2) 400 (1) 380 (1) 200 200 200 200 200 400 mg/Nm³, dry, 11%O2

CO 100 100 80 50 50 50 50 mg/Nm³, dry, 11%O2

TOC 20 20 20 10 10 10 20 mg/Nm³, dry, 11%O2

Hg 0,1 0,1 0,1 0,05 (2) 0,05 (2) 0,05 (2) 0,05 mg/Nm³, dry, 11%O2

Cd 0,1 0,1 0,1 0,05 (2) (3) 0,05 (2) (3) 0,05 (2) (3) 0,05 (3) mg/Nm³, dry, 11%O2

Pb 1,6 1,6 1,6 0,5 (2) 0,5 (2)

0,5 mg/Nm³, dry, 11%O2

As, Cr, Co, Cu,… 6 6 6 0,5 (2) 0,5 (2) 0,5 (2) mg/Nm³, dry, 11%O2

PCDD/F 0,1 0,1 0,1 0,1 0,1 0,1 0,1 ng/Nm³, dry, 11%O2

Flue gas opacity 1 1 1 1 1 Ringelmann

Notes

(1) : hourly average

(2) : average over sample period (30 min - 8h) (3) : Cd + Tl

(14)

info@cewep.eu www.cewep.eu

Key Chinese players

Mainly state owned enterprises doing

– Investment

– Organising the construction (project management) – O&M

(15)

info@cewep.eu www.cewep.eu

Shenzhen Energy

Client: Shenzhen Energy

Capacity: 2 x 400 tonnes/day + 3 x 400 tonnes/day

Start-up : 2004

(16)

info@cewep.eu www.cewep.eu

Shenzhen Energy

Client: Shenzen Energy

Capacity: 4 x 750 tonnes/day

Start-up: 2012

(17)

info@cewep.eu www.cewep.eu

China Everbright International

Client: China Everbright International

Capacity: several plants of 2 x 400 tonnes/day, 2 x 350 TPD

Start-up: Operational since 2008

(18)

info@cewep.eu www.cewep.eu

China Everbright International

Client: China Everbright International

Capacity: 4 x 500 tonnes/day

Start-up: Operational since 2011

(19)

info@cewep.eu www.cewep.eu

Cost Analysis

• Investment amount

– 30.000 - 45.000 €/ton per day

• O&M cost

(20)

info@cewep.eu www.cewep.eu

Gate fees

• Gate fees :

– Typical cities : 6 – 15 €/ton

(21)

info@cewep.eu www.cewep.eu

Gate fees

(22)

info@cewep.eu www.cewep.eu

Electricity Revenue

• Gross electricity generation ranges from 280 to

330 kWh/ton waste.

• Electricity tariffs are high (8,3 € cent/kWh) but

limited to 280 kWh/ton waste

(23)

info@cewep.eu www.cewep.eu

Revenue Analysis

• Electricity income is 70-85% of the revenue.

• Tipping fee is 15-30% of the revenue

(24)

info@cewep.eu www.cewep.eu

Tendencies in the Chinese market

• Short delivery times

– Construction period : 18-24 months

– Grate delivery time : 4-8 months

(25)

info@cewep.eu www.cewep.eu

CECIC

Client: CECIC

Capacity: 3 x 400 tonnes/day

Start-up: On hold for several years

(26)

info@cewep.eu www.cewep.eu

Tendencies in the Chinese market

•More localisation & local competition

•Chinese technology suppliers becoming active

overseas

•Chinese project developers show interest to go

(27)

info@cewep.eu www.cewep.eu

Tendencies in Chinese market

(28)

info@cewep.eu www.cewep.eu

IP protection in CHINA

(29)

info@cewep.eu www.cewep.eu

The Hong Kong market

ƒ HK generates 18,000t MSW daily, 13,300t (74%) are landfilled, the rest recycled.

ƒ 3 operational landfills scheduled to close in the years to come.

ƒ HK Govt plans 2 WTEs

ƒ First WTE project in Hong Kong

ƒ Capacity first WTE plant : 2800 TPD

ƒ Offshore land reclamation +coastal protection works

(30)

References

Related documents

Dose escalation studies of cytarabine, daunorubicin, and etoposide with and without multidrug resistance modulation with PSC-833 in untreated adults with acute myeloid leukemia

Previous work has mainly focused on loosely coupling GNSS with vision [43], or deeply coupling the tracking modules of a GNSS receiver with a vision-aided inertial system, to reduce

Title Gravity is relative…-1998 Technique Zeefdruk op Mulberry papier Size in cm 85 * 105

With a view to preparing the merger of Real Software nv and Dolmen Computer Applications nv, the Dolmen Board of Directors unanimously agreed on 10 April 2008 to co-opt TM

F43 Specialized construction activities 64742-88-7 Solvent naphtha (petroleum), medium aliph... residues

- Global Online Retail Market Size & Forecast - India Online Retail Market Size & Forecast - Online Retail Market: Segment Wise Forecast - Distribution Structure &

[r]

Index Terms — Geophysical model function (GMF), Global Navigation Satellite System Reflectometry (GNSS-R), machine learning, neural networks, TechDemoSat-1 (TDS-1), wind speed..