CSAH 6 Reconstruction - Phase I (Earthwork) $420,000 $1,065,000 $1,485,000

730th & CSAH 6 - Wright County 2.5 Miles

CSAH 9 Reclaim & Pave $428,202 $428,202

McLeod County - CSAH 18 1.0 Miles

CSAH 1 Reclaim & Pave $988,279 $988,279

SCL - TH 7 3.0 Miles

County-Wide HSIP GIWR Pavement Markings $14,713 $132,420 $147,133

Various CSAH Routes

County-Wide HSIP 6" Edgeline $9,378 $84,403 $93,781

Various CSAH Routes

590th Ave Replace BR 92618 $10,000 $440,000 $450,000

Cedar Mills Township

355th St Overlay - Forest Prairie TWP

650th Ave - CSAH 2 0.9 Miles 650th Ave Overlay - Forest Prairie TWP

355th St - 375th St 2.0 Miles

675th Ave Overlay - Forest Prairie TWP $400,000 $400,000

340th St - CD 20 3.3 Miles

647th Ave Reclaim & Pave - Forest Prairie TWP

TH 55 - Meeker-Stearns St. 1.0 Miles

Meeker-Stearns Reclaim & Pave - Forest Prairie TWP

0.5 Mi E of 647th Ave - CSAH 2 2.0 Miles

647th Ave Pave Reclaimed Road - Forest Prairie TWP $240,000 $240,000

TH 55 - Meeker-Stearns St. 1.0 Miles

Meeker-Stearns Pave Reclaimed Road - Forest Prairie TWP $575,000 $575,000

0.5 Mi E of 647th Ave - CSAH 2 2.0 Miles

367th St Overlay - Forest Prairie TWP $90,000 $90,000

650th Ave - Dead End 0.6 Miles

(2)

CSAH 6 Reconstruction - Phase II (Paving) $586,000 $629,000 $1,215,000

730th & CSAH 6 - Wright County 2.5 Miles

CSAH 6 Notch-Widen & Blade Level/Overlay $120,000 $70,000 $40,000 $230,000

Simons Ave West - 730th Ave 0.8 Miles

CSAH 1 Notch-Widen & Blade Level/Overlay $2,325,000 $2,325,000

TH 7 - CSAH 11 15.5 Miles

CSAH 21 Replace BR 92554 $130,000 $120,000 $250,000

Pleasure Drive Replace BR L8370 $10,000 $120,000 $130,000

Litchfield Township

County-Wide HSIP Intersection Lighting $12,000 $108,000 $120,000

Various CSAH Intersections

(3)

CSAH 21 Reclaim & Pave $1,000,000 $1,000,000

TH 15 - ECL 3.2 Miles

CSAH 4 City Reconstruction & Paving $400,000 $400,000

US 12 - Dassel North City Limits 0.6 Miles

CSAH 4 Notch-Widen & Overlay $350,000 $80,000 $430,000

US 12 - 255th Street 2.5 Miles

CSAH 14 Reclaim & Pave $1,300,000 $500,000 $1,250,000 $3,050,000

McLeod County - US 12 8.8 Miles

CSAH 14 Replace BR 90979 $80,000 $60,000 $140,000

County-Wide HSIP 6" Edgeline $11,500 $103,500 $115,000

Various CSAH Routes

County-Wide HSIP GIWR Pavement Markings $29,512 $265,608 $295,120

Various CSAH Routes

Darwin-Dassel Replace Parking Lot Pavement $360,000 $360,000

Truck Stop

2022 FUNDING SUMMARY

$2,771,012

$980,000

$1,610,000

$0

$369,108

$0

$60,000

$5,790,120

Pending Funding Approval Pending Funding Approval Pending Funding Approval

(4)

CSAH 16 Replace BR 90936 $80,000 $60,000 $140,000

CSAH 23 Reclaim & Pave $1,000,000 $1,000,000

Kandi - TH 4 3.2 Miles

CSAH 28 Reclaim & Pave $1,000,000 $1,000,000

Kandi - TH 4 3.2 Miles

120th Street Replace BR 90959 $10,000 $90,000 $100,000

Cosmos Township

240th Street Replace BR L5814 $10,000 $110,000 $120,000

Dassel Township

TH 15 - MnDOT Reclaim & Pave 14.4 Miles $9,400,000 $9,400,000

US 12 - Stearns County

TH 4 - MnDOT Reclaim & Pave 9.0 Miles $5,300,000 $5,300,000

Cosmos - 0.5 MI S of CSAH 23

US 12 - MnDOT Mill & Overlay/Micro Mill & UTBWC 6.1 Miles $1,900,000 $1,900,000

Holcome Ave. - CSAH 14

(5)

CSAH 34 Reclaim & Pave $700,000 $700,000

US 12 - TH 24 1.7 Miles

CSAH 3 Re-align at Middle Fork Crow River $225,000 $225,000

0.3 Miles

CSAH 34 Replace BR 7230 $400,000 $350,000 $750,000

County-Wide HSIP 6" Edgeline $9,200 $82,800 $92,000

250th Street Replace BR L5980 $10,000 $110,000 $120,000

Dassel Township

340th Street Replace BR 90996 $10,000 $110,000 $120,000

Union & Swede Grove Township

US 12 - MnDOT Major CPR & Diamond Grinding 10.3 Miles $4,900,000 $4,900,000

CSAH 14 - Cokato

2024 FUNDING SUMMARY

$1,334,200

$0

$20,000

$0

$82,800

$220,000

$350,000

$2,007,000

Pending Funding Approval

(6)

CSAH 3 Reclaim & Pave $660,000 $2,640,000 $3,300,000

Tri Cnty Road - TH 22 10.8 Miles

CSAH 31 Reclaim & Pave $1,600,000 $1,600,000

CSAH 11 - CSAH 16 5.0 Miles

CSAH 26 Re-Surfacing $250,000 $250,000

City of Cedar Mills 0.25 Miles

TH 4 - MnDOT Bridge Replacement $1,500,000 $1,500,000

2.6 Mi N of South County Line

2025 FUNDING SUMMARY

$2,260,000

$250,000

$1,500,000

$0 $2,640,000

$0

$0

$6,650,000

Pending Funding Approval

(7)
(8)

References

Related documents

These include risk, trust, perceived ease of use, perceived usefulness, technology readiness, preference for personal contact and demographic variables.. Key Words:

The most common variables measured to assess orthostatic vital signs in potentially hypovolemic patients include blood pressure and heart rate, measured with the patient in

Finally, Figure 3 represents the number of articles published on the front page (A1) over the six months of coverage for Newtown and Parkland. An interesting pattern is that there

With the recent sharp declines in world market price- for several agricultural products, marketing and pricing systems in many Sub-Saharan African countries have been

We measured microbial biomass carbon (MBC) and microbial biomass nitrogen (MBN) as well as potentially mineralizable carbon (PMC) and potentially mineralizable nitrogen (PMN)

Concentrations o f mercury and polychlorinated biphyenls in blood of Southern Beaufort Sea polar bears (Ursus maritimus) during spring: variations with lipids and stable

Thirdly, the instructors are in agreement to a certain extent about the items which are related to “the acquisition of intercultural skills at school” and

Students who initially enroll for the two-year Associate of Ap- plied Science degree may readily change to a four-year bachelor’s degree program and complete the requirements for