Engineering BOM vs. Assemblage BOM
Restricted © Siemens AG 2013 All rights reserved.
Problems during manufacturing
Problems during manufacturing
Restricted © Siemens AG 2013 All rights reserved.
Example
History
Restricted © Siemens AG 2013 All rights reserved.
ERP
PLM
Multiple BOM’s
Current way of working
Assembly B
Product A
Item C
Item D
Item E
Product A
Item C
Item D
Item E
Item F
Flattening structure
Additional items
(oil, glue)
eBOM
mBOM
BOM Management - General Concept
There is not only one view to a product;
Different disciplines will look differently to products and their describing information
A summary of these views are :
As-Specified
As-Designed
As-to-be-Manufactured
As-Planned
As-Manufactured
As not all views are used by the same disciplines, not all views are therefore created,
maintained and used within the same systems.
Restricted © Siemens AG 2013 All rights reserved.
Best Practices for
Data Authoring and Information Flows
•
PLM
•
Parts
•
eBOM / mBOM
•
Documents
•
Process BOM
•
Instructions
ERP
•
Cost
•
Inventory
•
Schedule
•
Quantity
MES
•
Transactions
•
Material Moves
•
Completion
•
Dates/Operator
Parts and mBOM
Work Orders
Order BOM
Progress/Results
Parts, mBOM
Process BOM
Process Feedback
Standard Costs
What and How
When and How Many
Who and Where
As-Designed
As-to-be-Manufactured
As-Manufactured
BOM Management - Business Requirements
The As-Designed (eBOM) and As-to-be-Manufactured (mBOM) views do not necessarily have to be the same.
Main reasons for eBOM / mBOM differences are:
Removal of (sub) assemblies that do not exist in the physical world.
Addition of non-design items which are needed for manufacturing the product
Therefore :
Manufacturing Engineers must be able edit the mBOM for restructuring purposes (Manufacturing Kits).
Manufacturing Engineers must be able edit the mBOM to add unique manufacturing content
(non-design items, Consumables) etc'.
mBOM updates should not modify the eBOM structure.
Manufacturing Engineers should control the mBOM update process.
Changes must be accorded, recorded and maintained
Restricted © Siemens AG 2013 All rights reserved.
Chosen Solution for Customer X
According to the Best Practices from the field…
eBOM and mBOM shall be separate item structures
Manufacturing Engineers shall have read privileges
on the eBOM and write privileges on the mBOM
Modifications to the eBOM and mBOM structures
shall be done using Change Procedures
ERP
PLM
Multiple BOM’s
Linking eBOM mBOM
Assembly B
Product A
Item C
Item D
Item E
Product A
Item C
Item D
Item E
Item F
Product A
Item C
Item D
Item E
Item F
VALUE:
No missing parts in
mBOM
Restricted © Siemens AG 2013 All rights reserved.
Multiple BOM’s
Adding value with the BOP
PLM
Assembly B
Product A
Item C
Item D
Item E
Product A
Item C
Item D
Item E
Item F
ERP
VALUE:
No missing parts in
BOP
Speed up
production start-up
Virtual commissioning
MES
Item C
Item E
Item D
Item F
P1
P2
Product A
R1
R3
R2
R4
W1
W2
mBOM
eBOM
BOP
Multiple BOM’s
PLM ERP view
PLM
(Teamcenter)
ERP
(SAP)
Plan
Product
Portfolio
Mgmt.
Define
Realize
Commer
-cialize /
Operate
Phase out
Make
Deliver
M
E
S
Manufacturing
Execution
System (MES)
Plan
Source
Global footprint planning
Investment planning
Make or Buy
Ramp up
-End of life/spare parts
As build
Change requests
Design for manufacturing
EBOM
MBOM
Restricted © Siemens AG 2013 All rights reserved.
PLM Value Enhancement - (Multi-) Structure Management
Assembly Manufacturing & Quality Solutions
Right synchronization
across product
engineering, manufacturing engineering,
and production
Right ingenuity
to create leaner, more
efficient processes
Right insight
into the real-world
performance of plans
Right control
of quality and
production operations
Restricted © Siemens AG 2013 All rights reserved.
Multiple BOM’s
A small scenario
Linking EBOM-MBOM
Assign Parts MBOM
Check completeness
1
2
3
Link structures
Template process from classification
Add process (BOP)
4
Restricted © Siemens AG 2013 All rights reserved.
Methods For delivering mfg. information to the shop floor
Teamcenter Mfg. Documentation
Adobe 3D PDF
Work
Instruction
Editor
Standard Text WYSIWYG
Teamcenter Mfg. Report
Restricted © Siemens AG 2013 All rights reserved.
What do other customers do!
Engineer to Order
Configure to Order
Benefits Summary
Removes silos and
increases team
productivity
Reduce errors providing
increased visibility into the
product lifecycle
Manage, relate and
consolidate product and
Joint Strike Fighter. With 6500
users, Lockheed is currently
managing the “As-Designed,”
“Manufacturing” or “As-Planned,”
and “As-Built” bill of materials
inside of Teamcenter.
BOM Synchronisation
Smarter decisions, better products.
Restricted © Siemens AG 2013 All rights reserved.