• No results found

WORK EXPERIENCE (Colaborations) 1

N/A
N/A
Protected

Academic year: 2021

Share "WORK EXPERIENCE (Colaborations) 1"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

Gabriela Sanz Rodríguez

www.arquitecturaverde.es

Creation and conceptualization of the project ideas.

PROJECT: Mall XXX Lutz, Copenhague.

CHALLENGE: Unitary image of the stores whose plants on ground belong to two separate offi ce buildings.

OFFICE: Nobel Arkitekter, Copenhagen.

PROJECT: Arts school in Tallinn.

CHALLENGE: Develop a very detailed and very dense program in a complex plot because of its shape and urban planning regulations. OFFICE: Nobel Arkitekter, Copenhagen.

PROJECT: Residential Complex Alicante, EPSA competition. CHALLENGE: High density residential complex with a single image that cross over a main road and stands on a square.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROJECT: University Campus in Zaragoza, competition.

CHALLENGE: Integration of campus surface parking in the roof of student residence.

OFFICE: Carlos Arroyo Arquitectos, Madrid. PROJECT: Residential Complex El Puche, competition.

CHALLENGE: Integration of community facilities at different levels in a plot of residential of minimum social units.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROJECT: Residential Complex Mieres, competition.

CHALLENGE: To create fl exible housing. Owners could defi ne the confi guration of their homes and adapt it to future requirements. OFFICE: Carlos Arroyo Arquitectos, Madrid.

Conceptual development of project strategies. Analysis of the initial conditions (environment, program

budget) and proposal of innovative and effi cient spacial solutions.

(2)

Gabriela Sanz Rodríguez

www.arquitecturaverde.es

PROJECT: Orestadb Business Center.

CHALLENGE: Image of the proposal of a facade for an offi ce building. View from the highway to assess the volume relation between the proposed building and other buildings Orestadb Business Centre.

OFFICE: Nobel Arkitekter, Copenhagen.

3D computer graphics and perspectives more or less photorealistic fi nishing as commissioning and

aesthetic required. 3D modeling, drawing and photo editing using the computer programs:

Autocad,

3DStudio, V-Ray, Revit, SketchUp, Photoshop and Illustrator.

Graphical development for competitions. Drawings, 3D computer graphics and

PROJECT: House in Las Lomas, privat comission.

CHALLENGE: Fast photorealistic image to present options to the client fi nished materials.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROJECT: Cherry Hall Auditorium, competition.

CHALLENGE: Illustration of the construction elements and its implementation in the environment as a schema.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROJECT: S. Mateo de Gállego Housings, privat comission. CHALLENGE: Abstract image of a set of plots with initial materials, common spaces and access areas.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROJECT: Pavilion for Expo of the water in Zaragoza.

CHALLENGE: Show the inner space of the pavilion and its interaction with the public visiting the exhibition.

(3)

Gabriela Sanz Rodríguez

www.arquitecturaverde.es

Model making.

PROJECT: University Campus in Zaragoza, competition.

CHALLENGE: Show the relationship between housing and environment. Transition between the park and asphalt through the volumes of the residences. Show the scale of the whole and the proposal to introduce parking on roof to free up space pedestrian and landscaped area. OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROJECT: Single Family House Las Lomas, private commission.

CHALLENGE: Show the different volumes of housing, the movement of the roof and exterior fi nishes. Convey an image of robust housing. A house proud of itself; strong and with movement simultaneously.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROJECT: 15 unipersonal apartments with shared spaces.

CHALLENGE: Show the relationship between volumes colors and study the light of the units and the courtyard.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROYECTO: Collective housing for 12 early retirees

CHALLENGE: Facade materials and volume reference. Relation with the existing square and surronding buildings.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

Development of models using different manual tecnics: plastics cutting machine hot- wire, precise cut

by hand with cutter of PVC, foam board and other types of cards, knowledge of the use of different

adhesives ...

(4)

Gabriela Sanz Rodríguez

www.arquitecturaverde.es

PROJECT: Residential student complex in Zaragoza

CHALLENGE: To get the maximum permitted number of dwellings and types required covering the necessities of campus parking spaces OFFICE: Carlos Arroyo Arquitectos, Madrid.

PROJECT: Academy of Dance, performance and music. Dilbeek. CHALLENGE: Reconcile the agenda of a public school auditorium keeping the farms and the existing ancient tree.

OFFICE: Carlos Arroyo Arquitectos, Madrid.

Support all technical and legal aspects of the implementing project. Audition, reports and project design.

Translate de basic ideas of the project to a more detaill and real project taking into account the fi nal

construction process. Client support, program settings, project opportunities and risks.

Graphic and documental development of projects.

PROJECT: Orestadb Business Center.

CHALLENGE: Urban sections compensation. Value of building heights and slopes of the plot and surrondings.

OFFICE: Nobel Arkitekter, Copenhagen.

PROJECT: Residential Complex Alicante, EPSA competition. CHALLENGE: Describe the location of housing within the set of building, common spaces and relationships full-empty.

OFFICE: Carlos Arroyo Arquitectos, Madrid. PROJECT: Offi ces building, Copenhagen.

CHALLENGE: Minimum access surface and maximum rent offi ce surface, Flexibility to segregate offi ce units.

OFFICE: Nobel Arkitekter, Copenhagen.

PROJECT: Arts school in Tallinn.

CHALLENGE: Show the building volume proposed, its solids and voids, in relation to the surrounding buildings.

(5)

Gabriela Sanz Rodríguez

www.arquitecturaverde.es

Construction development. Construction systems and details.

PROJECT: Single Family House Las Lomas, private commission.

CHALLENGE: Constructive measured section to the defi nition of the different materials and thicknesses proposed. Defi nition fl at partition fi nishes, fl ooring materials, roofi ng and carpentry. We also graphed the façade composition (thickness and modulation)

OFFICE: Carlos Arroyo Arquitectos, Madrid. PROJECT: Ballerup offi ces complex.

CHALLENGE: Construction details. Ex. de metal walkways and stairs in his joining with the existing masonry wall.

OFFICE: Nobel Arkitekter, Copenhagen.

PROJECT: Ballerup offi ces complex.

CHALLENGE: Construction details. Ex. Construction details of th roof with hydraulic opening skylights.

OFFICE: Nobel Arkitekter, Copenhagen.

Development of building systems consistents with the baseline, taking into account the cost and quality of

them. Detail design taking into account systems on the market and its adaptation to the specifi c problems

of the project.

(6)

Gabriela Sanz Rodríguez

www.arquitecturaverde.es

PROJECT: Offi ce building, Alcalá de Henares, Madrid.

CHALLENGE: Temporary planning tasks in construction phase. Identifi cation of overlaps and critical path.

OFFICE: Construction Management MSc report, Alarcón Arquitects.

PROJECT: Offi ce building, Alcalá de Henares, Madrid.

CHALLENGE: Batch construction process and budgets. Proposed improvements to reduce the deviations from the original budget. OFFICE: Construction Management MSc report, Alarcón Arquitects.

Management of the construction process. Cost management, quality and deadlines. Budgets and bids.

Economic planning and temporary jobs. License Management. Project audit. Work team sizing. Initial

project risks assessment. Facility management, fi nished building management and maintenance.

Management of construction process. Project, construction and facility management.

PROJECT: Offi ce building, Alcalá de Henares, Madrid.

CHALLENGE: Resize of project and construction manager team. Tasks to be done and resorces to spend.

OFFICE: Construction Management MSc report, Alarcón Arquitects.

PROJECT: Offi ce building, Alcalá de Henares, Madrid.

CHALLENGE: Analysis of the cost of maintenance and cleaning of facades according to the type of proposed construction system. OFFICE: Construction Management MSc report, Alarcón Arquitects.

References

Related documents

The association between RAI treatment failure and various clinical parameters includ- ing age, sex, height, weight, body mass index (BMI), thyroid gland volume, and isthmus length

2 Offering a limited number of educational presentaions that were previously scheduled for summer camp in a virtual format; Campers will be provided with activities related to

In line with the provisions of the Land Use Act of 1978, the proliferation of individual interests in land development and the emerging trend in land tenure

To recognize defective fabrics, we characterize the texture on the decomposed images computing features by applying the co–ocurrence matrix technique.. The co–occurrence matrix is

Barack’s story is the American story — values from the heartland, a middle-class upbringing in a strong family, hard work and education as the means of getting ahead,

Recent approaches for sustainable water management at the basin scale are using the framework of an integrated water resources management (IWRM) by combining surface,

To prove the validity of the nonoverlapping block bootstrap for functionals of absolutely regular sequences, we need assumptions not only on the decay of mixing coefficients, but

[r]