Grant All-Detail Report
2012 Cost Share Base Grant
Grant Title -
2012 Cost Share Base Grant - Lake (SWCD)
Grant ID
- C13-1868
Organization -
Lake SWCD
Grant Awarded Amount $13,184.00 Grant Execution Date 12/13/2011
Required Match Amount $3,296.00 Grant End Date 06/06/2013
Required Match % 25% Grant Day To Day Contact Dan Schutte, Lake SWCD District Mngr
Budget Summary
Budgeted Spent Balance Remaining
Total Grant Amount $13,184.00 $13,184.00 $0.00
Total Match Amount $7,820.00 $7,820.00 $0.00
Total Other Funds $14,393.80 $14,393.80 $0.00
Total $35,397.80 $35,397.80 $0.00
Budget Details
Activity Name CategoryActivity Source Type Source Description Budgeted Spent
Last Transaction
Date
Matching Fund
FY12 Cost Share Base Grant T/A Technical/Engi neering Assistance
Current State Grant
2012 Cost Share Base Grant - Lake (SWCD)
Activity Name CategoryActivity Source Type Source Description Budgeted Spent Last Transaction Date Matching Fund
Thureen Flood Damage Repair Streambank or Shoreline Protection
Current State Grant
2012 Cost Share Base Grant - Lake (SWCD)
$10,547.20 $10,547.20 10/10/2012 N
Thureen Flood Damage Repair Streambank or Shoreline Protection
Local Fund 2012 Flood Relief Landowner Match Fund
$7,820.00 $7,820.00 12/31/2012 Y
Thureen Flood Damage Repair Streambank or Shoreline Protection
Other Funds 2012 Minnesota Flood relief Grant - Lake (SWCD)
$14,393.80 $14,393.80 10/10/2012 N
Activity Details Summary
Activity Details Total Action Count Total Activity Mapped Size / Unit
342 - Critical Area Planting 1 2 0.1 AC
580 - Streambank and Shoreline Protection 1 2 0.2 AC
580 - Streambank and Shoreline Protection 1 2 0.4 AC
Indicators Summary
Indicator Name Total Value Unit
SEDIMENT (TSS) 875 TONS/YR
Grant Activity
Grant Activity - FY12 Cost Share Base Grant T/A
Description Technical and administrative support of Cost Share Base Grant projects to support and enhance Thureen flood relief project activities.
Category TECHNICAL/ENGINEERING ASSISTANCE
Start Date 13-Dec-11 End Date 06-Jun-13
Rates and Hours
Actual Results Provided technical and administrative support to one project, FY12-01, for critical area planting along the Lake Superior shoreline.
Grant Activity - Thureen Flood Damage Repair
Description This project will provide critical area stabilization associated with a major flood event. Record rainfall on June 19-20, 2012 resulted in widespread flood damage to southern Lake County. Damage to the Thureen residence included total loss of their septic drainfield through a massive slump on the shoreline of Lake Superior. Cost Share assistance was provided to cover approximately 72% of their flood damage expenses related to replacing the septic system, hydromulching the lakeshore, and planting a forest buffer strip along the Lake Superior bluff.
Category STREAMBANK OR SHORELINE PROTECTION
Start Date 13-Dec-11 End Date 06-Jun-13
Rates and Hours
Actual Results Completed:
In 2012, the lakeshore was hydromulched with seed and the bluff was graded and stabilized; the septic system was replaced using flood relief funding which was allowed due to the emergency situation, imminent threat to public health, and in need for immediate action to mitigate threats to both the natural resources and human health. Tree planting occured in June, 2013 and was executed by members of the MCC Gooseberry Crew.
Activity Action - Critical Area Stabilization
Practice 580 - Streambank and Shoreline
Protection
Count of Activities 3
Description
Proposed Size / Units 0.4 AC Lifespan 10 Years
Actual Size/Units 0.4 AC Installed Date 6-Jun-13
Final Indicator for Critical Area Stabilization
Indicator Name SEDIMENT (TSS) Value 875
Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) TONS/YR Calculation Tool BWSR CALC (FILTER STRIP)
Waterbody Lake Superior
Final Indicator for Critical Area Stabilization
Indicator Name PHOSPHORUS (EST. REDUCTION) Value 1006
Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) LBS/YR Calculation Tool BWSR CALC (FILTER STRIP)
Waterbody Lake Superior
Activity Action - Septic relocation and grading
Practice 580 - Streambank and Shoreline
Protection
Count of Activities 3
Description The septic mound was lost in the mass wasting event at this site. Septic system was relocated back from bluff approximately 100 feet.
Proposed Size / Units 0.2 AC Lifespan 10 Years
Actual Size/Units 0.2 AC Installed Date 27-Aug-12
Activity Action - Tree Planting
Practice 342 - Critical Area Planting Count of Activities 3
Description
Proposed Size / Units 0.1 AC Lifespan 10 Years
Actual Size/Units 0.1 AC Installed Date 20-May-13
Grant Activity - Thureen Flood Damage Repair
Description This project will provide critical area stabilization associated with a major flood event. Record rainfall on June 19-20, 2012 resulted in widespread flood damage to southern Lake County. Damage to the Thureen residence included total loss of their septic drainfield through a massive slump on the shoreline of Lake Superior. Cost Share assistance was provided to cover approximately 72% of their flood damage expenses related to replacing the septic system, hydromulching the lakeshore, and planting a forest buffer strip along the Lake Superior bluff.
Category STREAMBANK OR SHORELINE PROTECTION
Start Date 13-Dec-11 End Date 06-Jun-13
Rates and Hours
Actual Results Completed:
In 2012, the lakeshore was hydromulched with seed and the bluff was graded and stabilized; the septic system was replaced using flood relief funding which was allowed due to the emergency situation, imminent threat to public health, and in need for immediate action to mitigate threats to both the natural resources and human health. Tree planting occured in June, 2013 and was executed by members of the MCC Gooseberry Crew.
Activity Action - Critical Area Stabilization
Practice 580 - Streambank and Shoreline
Protection
Count of Activities 3
Description
Proposed Size / Units 0.4 AC Lifespan 10 Years
Actual Size/Units 0.4 AC Installed Date 6-Jun-13
Final Indicator for Critical Area Stabilization
Indicator Name SEDIMENT (TSS) Value 875
Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) TONS/YR Calculation Tool BWSR CALC (FILTER STRIP)
Waterbody Lake Superior
Final Indicator for Critical Area Stabilization
Indicator Name PHOSPHORUS (EST. REDUCTION) Value 1006
Activity Action - Septic relocation and grading
Practice 580 - Streambank and Shoreline
Protection
Count of Activities 3
Description The septic mound was lost in the mass wasting event at this site. Septic system was relocated back from bluff approximately 100 feet.
Proposed Size / Units 0.2 AC Lifespan 10 Years
Actual Size/Units 0.2 AC Installed Date 27-Aug-12
Activity Action - Tree Planting
Practice 342 - Critical Area Planting Count of Activities 3
Description
Proposed Size / Units 0.1 AC Lifespan 10 Years
Actual Size/Units 0.1 AC Installed Date 20-May-13
Grant Attachments
Document Name Document Type Description
All Details Report Workflow Generated Workflow Generated - All Details Report - 09/18/2013
Final Financial Report Grant 2012 Cost Share Base Grant - Lake (SWCD)
Thureen Site Plan Grant 2012 Cost Share Base Grant - Lake (SWCD)