• No results found

Capability Statement

N/A
N/A
Protected

Academic year: 2021

Share "Capability Statement"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

(1)

- 1 -

www.tpf.eu

Capability Statement

Bridges & Flyovers

S.N. Bhobe & Associates Pvt. Ltd.

Unit No 10, Banking complex No II, Plot No 9&10, Sector 19A,

Vashi, Navi Mumbai - 400 705 Tel. No. +91 22 27831070 Fax No. +91 22 27831173 / 1078 Email: [email protected] www.snbapl.com Ja n u a ry – 2 0 1 5

(2)

- 2 -

We offer the following services in the field of Bridge and Flyover Engineering and Construction –

Techno feasibility Study

Techno – commercial study

Soil and Geotechnical Investigation

Hydraulic Investigation

Engineering Surveys

Traffic Assessment Surveys

Detailed Project Report (DPR)

Transport Planning and

Implementation

Pre and Post Tender activities

Structural Design

Quality Assurance

Project Management Consultancy

(PMC)

(3)

- 3 -

We are specialized in the following diversified areas of infrastructures –

River Bridges (Major and Minor)

Flyovers

Skywalks

Underpass / Subways

Roads

Highways

Buildings

Railways

Airports

Tunnels

Utility services

Architectural and Town Planning

Beautification of River fronts

(4)

- 4 -

1. Consultancy services for Rehabilitation of Mahatma Gandhi Setu on NH 19 in Patna in the State of Bihar on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis.

• Concept – High level river bridge

• Total length of bridge – 5.5 km

• Cost - ₨. 9.56 million (€ 0.13 million)

• Year of realization – 2011

• Client – National Highway Authority of India

• Scope – Consultancy services for Rehabilitation of

Distressed Bridge

2. Cable stay bridge across Tapi river, Surat

• Concept – Cable stay river bridge

• Cable stay portion length – 300 m (75 + 150 +75)

• Project cost - ₨. 1436.50 million (€ 22.10 million)

• Year of realization – 2010

• Client – Surat Municipal Corporation.

• Scope – Structural Design Consultant

3. Cable stay bridge across Mapusa river, Goa

• Concept – Cable stay river bridge

• Cable stay portion length – 185 m

• Project cost - ₨. 207 million (€ 3.18 million)

• Year of realization – 2005

• Client – Goa State Infrastructure

Development Corporation Ltd.

• Scope – Design, Tender Preparation,

Project Management Consultant

4. High level bridge across Pawana River, Ravet, Pune

• Basket Handle Bridge

• Concept – River bridge

• Physical dimensions – 195 x 160 x 19.50 m

• Project cost - ₨. 119.82 million (€ 2.00 million)

• Year of realization – 2008

• Client – MSRDC Ltd.

• Scope - Design, Quality Assurance, Tender Preparation,

• Project Management Consultant

(5)

- 5 -

5. Design Consultancy for the work of construction of bridge across river Tapi between Kapodra (Bharwad Falia) and Utran in Surat city.

• Utran River Bridge

• Concept – River bridge

• Project cost - ₨. 721 million (€ 10.30 million)

• Year of realization – 2012

• Client – Surat Municipal Corporation

• Scope – Design Consultant

6. Project Management Consultancy for works of construction of new bridge over river Roopnarayan at Kolghat.

• Kolghat River Bridge

• Concept – River bridge

• Project cost - ₨. 25.7 million (€ 0.36 million)

• Year of realization – 2011

• Client – Ashoka Buildcon Ltd.

• Scope – Project Management Consultancy

7. Construction of bridge across Tungabhadra river on Harihara-Ranebennur Road (SH-76)

• Tungabhadra River Bridge

• Concept – River bridge

• Project cost - ₨. 6.5 million (€ 0.09 million)

• Year of realization – 2012

• Client – Karnataka Road Development Corp. Ltd

• Scope – Rehabilitation Studies, Detailed Engineering

Design, Supervision & Quality Assurance

8. High level bridge across Tapi river, Amroli, Surat

• Concept – High level river bridge

• Total length of bridge – 655.20 m

• Cost - ₨. 290.90 million (€ 4.47 million)

• Year of realization – 2010

• Client – Surat Municipal Corporation

• Scope – Project management consultant

(6)

- 6 -

9. River bridge between Amona and Khandola, Goa

• Concept – River bridge

• Total length of bridge – 510 m

• Cost - ₨. 400 million (€ 6.66 million)

• Year of realization – 2006

• Client – Goa State Infrastructure

Development Corporation Ltd.

• Scope - Structural Design Consultant

10. High level bridge across river Koyna, Pune

• Concept – High level river bridge

• Total length of bridge – 176 m

• Cost - ₨. 86.50 million (€ 1.44 million)

• Year of realization – 2007

• Client – Water Resources, Maharashtra

• Scope – Structural Design Consultant

11.Bridge across river Mapusa connecting Poira

and Corjuem, Goa

• Concept – River bridge

• Total length of bridge – 54.09 m

• Project cost - ₨. 42.35 million (€ 0.65 million)

• Year of realization – 2009

• Client – Goa State Infrastructure Development

Corporation Ltd.

• Scope – Design, Tender Preparation, Techno Feasibility

Study, Project Management Consultant

12.Bridge across river Chapora connecting Pirna

and Ozrim, Goa

• Concept – River bridge

• Total length of bridge – 450 m

• Project cost - ₨. 87.99 million (€ 1.35 million)

• Year of realization – 2006

• Client – Goa State Infrastructure

Development Corporation Ltd.

• Scope – Design, Tender Preparation, Techno Feasibility

Study, Project Management Consultant Some of our Key projects

(7)

- 7 -

13. Flyover on Dr. Ambedkar Road, Mumbai

• Total length - 4910 m

• No. of lanes - 4

• Project cost - ₨. 3770 million (€ 58.00 million)

• Year of realization – 2011

• Client – Mumbai Metropolitan Region

Development Authority (MMRDA)

• Scope – Detailed Project Report, Tender Preparation,

Project Management Consultant

14. Construction of Flyover near Times of India Building at Malad on western express highway-appointment of project management consultancy.

• Project cost - ₨. 180 million (€ 2.57 million)

• Year of realization – 2012

• Client – Maharashtra State Road Development

Corporation. Ltd

• Scope – Project Management Consultancy

15. Grade separator, Kengri Junction, Bangalore

• Total length - 1114 m

• No. of lanes - 2

• Project cost - ₨. 229.90 million (€ 3.79 million)

• Year of realization – 2009

• Client – Karnataka Road Development

Corporation Ltd.

• Scope - Detailed Project Report, Feasibility Study,

Design, Quality assurance, Tender Preparation, Project Management Consultant

16. Flyover at Yeshwanthpur Circle, Bangalore

• Total length – 348.75 m

• No. of lanes - 4

• Project cost - ₨. 193 million (€ 2.96 million)

• Year of realization – 2009

• Client – Bruhath Bangalore Mahanagara Palike

• Scope – Detailed Project Report, Design,

Project Management Consultant Some of our Key projects

(8)

- 8 -

17. Flyover/ Grade separator, Magadi Road, Bangalore

• Total length – 323.50 m

• Project cost - ₨. 337.20 million (€ 5.18 million)

• Year of realization – 2010

• Client – Bangalore Development Authority

• Scope – Quality Assurance, Project Management

Consultant

18. Construction of Flyover Bridge at Gujarat Gas Circle, Adajan Road in Surat

• Total length – 1365 m

• Project cost - ₨. 280 million (€ 4 million)

• Year of realization – 2012

• Client – Surat Municipal Corporation

• Scope – Project Management Consultancy

19. Flyover at Nana Varachha junction, Surat

• Total length – 463.00 m

• No. of lanes - 4

• Project cost - ₨. 85.85 million (€ 1.32 million)

• Year of realization – 2008

• Client – Surat Municipal Corporation

• Scope – Design, Project Management Consultant

20. Flyover at Kapodra fire station junction on Varachha road, Surat

• Total length – 549.00 m

• No. of lanes - 4

• Project cost - ₨. 107.34 million (€ 1.65 million)

• Year of realization – 2010

• Client – Surat Municipal Corporation

• Scope – Design, Project Management Consultant

(9)

- 9 -

21. Flyovers at Manpada, Patlipada, Waghbil junction, Ghodbunder Road, Thane

• Total length – 2993.47 m

• No. of lanes - 4

• Project cost - ₨. 870 million (€ 13.38 million)

• Year of realization – 2009

• Client – Maharashtra State Road Development

Corporation Ltd.

• Scope –Detailed Project Reports

Topographical Survey Preparation of Estimates Proof Checking

Project Management Consultancy

22. Under pass at Ramamurthy Nagar on Outer Ring Road at Bangalore

• No. of lanes - 6

• Project cost - ₨. 171.76 million (€ 2.86 million)

• Year of realization – 2007

• Client –Bangalore Development Authority

• Scope –Consultancy Services for Project Management

and Quality Assurance

23. Flyover at Kapurbawdi Junction, Godhbunder Road, Thane

• Total length – 2964.62 m

• No. of lanes - 6

• Project cost - ₨. 1250 million (€ 19.23 million)

• Year of realization – 2009

• Client – MSRDC, Mumbai

• Scope – Detailed Project Report, Design, Pre- Tender

Activities Some of our Key projects

(10)

- 10 -

Our Presence Countrywide

Corporate Office: MUMBAI

S. N. Bhobe & Associates Pvt. Ltd. Banking Complex No. II, Unit No. 10, Plot No. 9 & 10, Sector – 19A, Vashi, Navi Mumbai – 400 705 Tel. No. +91 22 27831070 / 72 Fax No. +91 22 27831173 / 1078 Email: [email protected] Regional Offices Kolkata

51, Central Road, Jadavpur, Block –I, Flat 3D,

Kolkata – 700 032 West Bengal, India

Indore

MIG – 122, Nalanda Parisar, Near Kesherbag Mandir, Kesherbag Road, Indore - 452001

Tel No. +91 81 2000 0901

Pune

#5, Chaitraban Complex, 1st Floor, Above Hotel Samrat,

Wakdewadi, Shivajinagar, Pune – 411 003 Tel No. +91 20 25540041 Fax No. +91 20 25540041 Email: [email protected] Goa

House no. 1801, 1st Floor,

“Shreelaya”, Green Circle, Alto-Betim, Bardez-Goa - 403521 Email: [email protected]

Site offices

Mumbai – Multiple sites Surat – Multiple sites Pune – Multiple sites Indore – Multiple sites Patna

Bilaspur

Kolkata – Multiple sites Chennai – Multiple sites Tuljapur

Nagpur – Multiple sites Goa – Multiple sites Bhopal

Solapur Kolhapur

Bangalore

#181, Bethel Bhavan, K.G.E. Layout, RMV – IInd Stage, Bangalore - 560 094, Karnataka Tel No. + 91 80 23412120 Fax No. +91 80 23412120 Email: [email protected] Nagpur 19 Lata Appartment, Flat No. 101, Kadbi Chowk, Nagpur - 440004

References

Related documents

From within this framework, we review the derivation of plans for exponential, normal, gamma, Weibull, and Poisson random variables.. We verified these derivations on a set of

the institute within the ministry of agriculture, or the seed testing laboratory unit within a seed company, and the organisational structure within the laboratory ( Example

วัดใหม่เกตุงาม (สงัด กระจ่าง, 2550) พบว่า การใช้นวัตกรรม “กลุ่มเพือนรัก เพือนเตือน” เพือ พัฒนาคุณธรรมจริยธรรมของนักเรียนระดับชัdน ประถมศึกษาปีที 4-6 ใน 5 ด้าน

Normalized mutual information based rigid image registration has done by using genetic algorithm, particle swarm optimization methods, GA is completely random

quantitative causal-comparative study was to explore the influence of curricular design on professional formation, including ethical/moral reasoning and civic-mindedness in physical

However, production-near Internet Technologies on the automation level allow a distributed automation (Siemens 2000) with a high flexibility. In the case of a consistent usage

relatedness of 0.125 Sister to Brother & Family Edge term Ties representing sisters being named as helping their brothers. and brothers’

The age of volcanism in the broader Allchar deposit area was determined on several occasions in the 1986-2009 period, using radiometric methods (K/Ar and Ar/Ar) on samples