Engineering Change Notice

(2)

Rules(1/2)

No phone calls in the training room

I know you are busy, if the phone call is urgent, take it and I will cover what you missed at the end if necessary

(3)

of F au re ci a -D up lic at io n pr oh ib ite d Rules (2/2) Questions

I will try my best to answer any of your question

If I can’t during the training session, I will sent you the answer by email if you so desire.

[email protected]

Speak to low Speak to fast

(4)

Outline

Part I: Engineering Change Management: FIS Process

Engineering change management process: an overview ECN lifecycle

Part II: The New ECN Application

Creating an ECN

Assigning task and deadlines Reviewing the work

(5)

of F au re ci a -D up lic at io n pr oh ib ite d Change management

Purpose: Consistent performance improvement Better KPI reporting

Pinpoint areas of concern (Lessons Learned)

Note differences between successful and failed changes Facilitate communication and track changes

Cost control

Preventing duplicate efforts Quality control

Prevent corrective efforts

(6)

Change Management at FIS (1/6)

How to we change our product:

ECR

ECO

MCO ECN

(7)

of F au re ci a -D up lic at io n pr oh ib ite d

Change Management at FIS (2/6)

Engineering Change Request :

ECR ECO MCO MMR PDW ECN

Anyone can initiate an ECR in Galileo Encompasses Change Analysis and Assessment

How change is implemented Costs

Plants affected are involved in these assessments

Weekly Change Meetings

Change Coordinator and Plant Change Coordinator

If approved by Program Manager an ECO will be created

(8)

ECR

ECO

MCO ECN

Change Management at FIS (3/6)

Engineering Change Order : An ECO is generated in Galileo Linked to originating ECR

Product Engineer and PDM BOM analyst alter BOM and validate changes

At the end of this process, the BOM is ready to be transferred to FCS

(9)

of F au re ci a -D up lic at io n pr oh ib ite d ECR ECO MCO MMR PDW ECN

Change Management at FIS (4/6)

Manufacturing Change Order : An MCO is created for each plant

affected by the change defined in the ECR and ECO.

MCO makes the transfer from Galileo (PLM) to FCS (ERP)

The transfer of a BOM into FCS does not automatically update all

purchasing, sales, and tooling views: the MMR is created for these updates.

(10)

ECR

ECO

MCO ECN

Change Management at FIS (5/6)

Material Master Request : Part Data Worksheet:

This document acts as a checklist for those responsible for views in SAP (FCS Production)

Tooling

Purchasing Sales

Typically at R&D site

(11)

of F au re ci a -D up lic at io n pr oh ib ite d ECR ECO MCO MMR PDW ECN

Change Management at FIS (6/6)

Engineering Change Notice : Document for Plant use

Implementing the Change at the Plant level

Should occur after the ECO Dependent on timing Task list

Plant Change Coordinator Responsible for document Coordinates change

(12)

Who are the key actors?

Product Engineer/Manufacturing Engineer

Plant Engineering Change Coordinator (PECC) Plant Quality Manager

Plant Engineering Director/Manager Task Responsible

(13)

of F au re ci a -D up lic at io n pr oh ib ite d

The ECN process (1/8)

(14)

The ECN process (2/8)

(15)

of F au re ci a -D up lic at io n pr oh ib ite d

The ECN process (3/8)

Plant ECC

Responsible: Activities:

•Plant Engineering Change Coordinator (PECC)

•Assessment of each task based on the nature of this change

•If a task is required, an responsible must be name and a due date given

(16)

The ECN process (4/8)

(17)

of F au re ci a -D up lic at io n pr oh ib ite d

The ECN process (5/8)

ECC Review

Responsible: Activities:

•PECC •Reviewing each evidence

•Deciding if the task was done as per standard

•Refused task will be sent back to its responsible •Accepted task will be locked down

(18)

The ECN process (6/8)

(19)

of F au re ci a -D up lic at io n pr oh ib ite d

The ECN process (7/8)

Validation of Change

Responsible: Activities:

•Plant Quality Manager

•Answer “Did the change have the intended result?”

•User for traceability and follow up

(20)

The ECN process (8/8)

(21)

of F au re ci a -D up lic at io n pr oh ib ite d The Software http://demoecn.evalidate.com/

Designed for Internet Explorer

Designed by the EIT Team based on User Input

Faster

More intuitive and easier to use Evolving

Engineer

[email protected]

(22)

The remaining part of the training is a live demonstration

(23)

of F au re ci a -D up lic at io n pr oh ib ite d

The End

[email protected]

References

Related documents

The results on Figure 4 indicate that participants who did the driving test perform better than those who did not, it also shows that improvement with iterations is smaller if

Calculation of the energy requirements for travelling/locomotion (MER T , per individual animal and season) The energy expenditure for travelling/locomotion is calculated based on

We capture users' preferences in profiles and personalizes the annotation propagation at query time by reporting the most relevant annotations (per tuple) for each

40, City of Palmdale, Palmdale Water District, Littlerock Creek Irrigation District, Palm Ranch Irrigation District, Quartz Hill Water District, California Water

For all supplies / contract above rupees one lakh, the successful tenderer should furnish a performance guarantee / security deposit @ 10 percent of purchase

• Offer contracts - A producer signs a contract with an elevator indicating his/her wishes to sell a specifi c number of bushels of grain any time cash price reaches a

Indeed, from a purely pattern recognition point of view one would only need the data vector, however pres- ence or absence of the preprocessing details comple- menting the spectral

The types of securities available in the primary market segment as set out in the Trading Rules for the OTC Spot Market (link to be provided in the next update of this