• No results found

Re-engineering and function testing at Handtmann Zittau WELCOME

N/A
N/A
Protected

Academic year: 2021

Share "Re-engineering and function testing at Handtmann Zittau WELCOME"

Copied!
31
0
0

Loading.... (view fulltext now)

Full text

(1)

Re-engineering and function testing at

Handtmann Zittau

(2)

Agenda

Generell Information

Handtmann Zittau – Re-engineering

Handtmann Zittau – Function testing

(3)

Generell Information

With the Second-hand Machine Centre in

Zittau, Handtmann offers its international

customers the approved Handtmann quality

in the business with used-machines –

by means of re-engineering and

function testing.

Handtmann Maschinenvertrieb GmbH & Co.KG

Niederlassung Zittau

Dittelsdorfer Str. 7

D-02763 Zittau

(4)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

What is reconditioned?

100% of vacuum pumps are new

100% replacement of all gear bearings and seals

100% inspection of proportional valves;

replaced if faulty

100% replacement of meat pump and side plate

60 - 70% of pipes are replaced

100% of machine feet (plastic parts) are replaced

(5)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

What is reconditioned?

100% recondition of hopper swivelling mechanism

100% replacement of torsion springs on the swivel housing

100% replacement of bearings and toothed belt on the

linking drive

General rust-free etching, sandblasting and re-galvanizing of: gear cover plate and oil tank

cover as well as supporting steel components on VF 50/100

(6)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

What is reconditioned?

Sandblasting and painting of steel baseplate and portal components (VF 80/200/300)

100% of electric motors are electrically checked and fitted with new bearings

100% of control systems are checked;

replaced if faulty

100% of housing and hopper are shot-blasted

(7)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

Sandblasted

and painted

New

machine foot

Steam cleaned

(oil tank)

Rust-free etched and galvanized

(8)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

Oil pump

checked

New oil filter

Oil cooler

- Cleaned

- Checked

Motor:

- Electrically checked

- New bearings

(9)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

- De-rusted

- Shot-blasted

(10)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

All bearings in the gear column are replaced.

Gear cover

- Sandblasted

- Galvanized

Gear:

- Cleaned

- Inspected

- New bearing

(11)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

Universal drive:

Inspected and cleaned

or replaced

Rotational-speed

sensor:

- Cleaned

- New seal

Portal:

- De-rusted

- Steel parts painted

- Stainless steal parts

shot-blasted

(12)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

New meat pump

(13)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

Swivel housing

- Cleaned

- Shot-blasted

New side plate

Cylinder:

- Inspected

- Cleaned

Cleaned

(14)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

a

Vacuum pump

new

New hose

All pipes new

(15)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

Proportional valves

new or inspected

Supports:

- Shot-blasted

- New dry bushings

- New disc springs

Linking drive bearing

Oil motor:

- Checked for leaks

- Cleaned

(16)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

Electrically checked

(30-50% of cables

are replaced on

every filler)

(17)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

- Control checked;

replaced if faulty

- New switches

- New hour counter

(18)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

Swivel housing :

- Cleaned

- Shot-blasted

if stainless steal

Hopper column :

- Reconditioned

(new springs)

Chain + sprockets :

- Cleaned

(19)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

Bracket:

- Shot-blasted

Ventilator checked

New cover

(20)

Handtmann Zittau – Re-engineering

Assembly of a VF 200

The service

Re-engineered

Handtmann inspected

Handtmann quality seal

Handtmann spare parts

Factory warranty

Worldwide service via Handtmann sales

and service partners

(21)

Handtmann Zittau – Function testing

Function testing VF 608

What is tested?

100% perform full Handtmann service

100% check of vacuum system;

repaired if necessary

100% function test of controls;

replaced if faulty

100% function test of servo-drives,

replaced if faulty

100% check of side-plate;

(22)

Handtmann Zittau – Function testing

Function testing VF 608

What is tested?

100% check of meat pump;

replaced if high wear

100% check of machine safeties

100% of linking gear box is completely reconditioned

(23)

Handtmann Zittau – Function testing

Function testing VF 608

Machine status of

Vacuum Filler checked

(24)

Handtmann Zittau – Function testing

Function testing VF 608

Perform a full

(25)

Handtmann Zittau – Function testing

Function testing VF 608

Check of side-plate;

Replaced if cracked or

high wear

(26)

Handtmann Zittau – Function testing

Function testing VF 608

Check of meat pump;

Replaced if high wear

(27)

Handtmann Zittau – Function testing

Function testing VF 608

Rotor within tolerance

Remain in machine

Rotor outside tolerance

(28)

Handtmann Zittau – Function testing

Function testing VF 608

100 % re-engineering of

linking gearbox 34-5

(29)

Handtmann Zittau – Function testing

Function testing VF 608

Final inspection of

machines with

Handtmann Q-Check,

like new machines

(30)

Handtmann Zittau – Function testing

(31)

References

Related documents

This paper explains how DOA estimation can be obtained using antenna arrays, and discusses the data model and various signal processing algorithms.. ML DOA estimation is a

Thriving Resilience Loss Coping efficacy Illness acceptance Depressive symptoms Perceived social support. Coping efficacy Illness acceptance Depressive symptoms

Catalog Administration Catalog Administration Resources List of Resource Definitions Resource Bookings List of All Resource Bookings Learner Enrollments and Subscriptions List

Utility key for protecting secret data, including keys Directly protect user data with Seal. Optionally additionally protect with password, PCR constraints Local

Because we aimed to estimate the effect of Part D, we sought to compare observed trends in out-of-pocket costs and utilization among seniors eligible for the benefit (the Part

“The multiple electrode aggregometry ADP test in patients under thienopyridine treatment and undergoing cardiac surgery is associated with postoperative bleeding and platelet

To conduct the analysis which investigates whether the locus of control construct of employees influences the strength of the relationship between the independent variable,

the exclusive or nonexclusive grant of a transfer or license of copyright or of any right under a copyright, executed by the author on or after January 1, 1978, otherwise than