• No results found

INCAS Neurocognitive Laboratory Four Years of Intensive Efforts to Build up Experimental Understructures for Human Subjects in Iran

N/A
N/A
Protected

Academic year: 2020

Share "INCAS Neurocognitive Laboratory Four Years of Intensive Efforts to Build up Experimental Understructures for Human Subjects in Iran"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. Computerized tasks and questionnaires in Farsi, designed and used in the  neuro-cognitive assessment unit of the lab
Table 2. Software and MRI processing facilities at ����������������������������
Table 4. Approved and granted research projects related to the neurocognitive lab of the National Center for Addiction Studies.

References

Related documents

Results: Compared to the I/R group, pretreatment with 2.5% sevoflurane significantly improved the cardiac function, limited myocardial infarct size, reduced cardiac enzyme

Summary of the International Union for Conservation of Nature Red List of Ecosystems (IUCN RLE) continental, national, and sub-national assessments (IUCN RLE criteria versions 1

In this paper three core models are developed to create an overall assessment framework for intermodal transport policies: a multimodal freight model (NODUS), a discrete

From the bar diagram it is clear that the geopolymer concrete blended with 100% GGBS shown maximum split tensile strength values at all curing periods and the values are greater

When tested with simulated data, the ROC curves and true positive comparison indicate that a kernel size of roughly 0.20 should show an improvement over CCA (Figure 4), but

Densitometric parameters (such as mean lung density [MLD], standard de- viation of lung density [SD-LD], kurtosis, and skewness) de- rived from CT attenuation histograms have served

Along with the oral tradition, Karnad assimilates the Western classical tradition of drama and modern forms and trends to exploit his resources.. Indian gods

 Higher-level dispatch and control centres (for example, electrical grid control centre, dispatch power system centre, group control centre for several substations,